You are on page 1of 6

CURRICULUM VITAE

CHANDRA SHEKHAR REDDY YEDLA


M.Tech Environmental Engineering
Civil Engineering Department
IIT ROORKEE
: +91-9581368537, 8712887371

: ychandu141@gmail.com

chanduyedla@gmail.com

KEY QUALIFICATIONS

About 5.5 years of professional experience in the field of environmental engineering involving
various water supply, sewerage and sanitation projects under urban infrastructure & rural
development projects and for residential, commercial and industrial buildings. Involving in the
preparation of feasibility reports, developing the concepts for the scheme proposals, preparation
of detailed engineering reports which includes detailed designs & estimates of water supply
sewerage and sanitation schemes. Preparation of tender documents with BOQs. Conversant with
various softwares LOOP, BRANCH, EPANET, WATERCAD, WATERGEMS AND
SEWERGEMS related to water supply and sewerage schemes. Also having good interpersonal
and co-ordination skills. Attended several techno-commercial meetings with clients & subagencies.
EDUCATIONAL QUALIFICATIONS

Post Graduation, M.Tech. in Environmental Engineering from Civil Engineering Dept, IIT
Roorkee with CGPA 8.14 on scale of 10. (2007-09)
Graduation, B.Tech in Civil Engineering from Jawaharlal Nehru Technological University,
Ananthapur, Andhra Pradesh with 78.78%. (2003-07)
Board of Intermediate Education, M.P.C from Nalanda Junior college, Kodad, Andhra Pradesh
with 92.50%. (2000-02)
Board of Secondary Education from Pragathi Vidhyalayam, Nereducherla, Andhra Pradesh with
80.00%. (1999-2000)
EMPLOYMENT RECORD
Designation
Employer
Profession
Experience

: Deputy Manager (Senior Environmental Engineer)


: M/s Voyants Solutions Private Limited, Hyderabad
: Water and Waste Water Engineer
: From: Oct, 2011 To: Till Date

PROJECTS INVOLVED:
Project -1
: Consultancy Service for Preparation of Detailed Report for Comprehensive
Planning of Water Supply Service (24X7) and Sewerage System Improvements for Gajendragad,
Mundargi, Naregal, Bankapur and Mulki Towns in Karnataka State.
Client
Duration

: Karnataka Urban Infrastructure Development and Finance Corporation


: May, 2014 Till date (Ongoing Project)

Activities performed:

Analyzing existing water supply system status by conditional survey of Water Treatment
Plants and Layouts, Elevated Service Reservoirs, Pumping Stations, Intake Arrangements.
1

Integration of Existing/ Ongoing schemes with proposed schemes.


Design of Distribution Networks using EPANET and WATERGMES for Various Zones
Hydraulic design of raw water transmission main, Economic design of clear water
transmission main, distribution networks.
Preparation of BOQs for Distribution networks and various components of water supply
system
Analyzing existing sewerage system and planning for future population (30 years).
Preparation of Standard drawings of Pumping station and estimations.
Involved in the Design of Water treatment plant of various components.
Preparation of detailed design report.

Project -2
: Consultancy Service for Preparation of Detailed Report for Comprehensive
Planning of Water Supply Service (24X7) Improvements for Buxar, Bhabua, Sasaram and
Aurangabad Towns in Bihar State.
Client
Duration

: Bihar Urban Infrastructure Development Corporation (Funding by JNNURM)


: May, 2013 Till date

Activities performed:

Analyzing existing water supply system status by conditional survey of Water Treatment
Plants and Layouts, Elevated Service Reservoirs, Pumping Stations, Intake Arrangements.
Integration of Existing/ Ongoing schemes with proposed schemes.
Design of Distribution Networks using EPANET and WATERGMES for Various Zones
Hydraulic design of raw water transmission main, Economic design of clear water
transmission main, distribution networks.
Preparation of BOQs for Distribution networks and various components of water supply
system
Preparation of Standard drawings of Pumping station and estimations.
Involved in the Design of Water treatment plant of various components.
Preparation of detailed design report.
Approval taken by NBCC JnNURM, New Delhi

Project -3
: Consultancy Service for Preparation of Detailed Report for Comprehensive
Planning of Water Supply Service Improvements for Kakinada, Manuguru and Vizianagaram
Municipal Corporations in Andhra Pradesh.
Client
Duration

: Andhra Pradesh Municipal Development Project (World Bank project)


: Oct, 2011 June-2013

Activities performed:

Analyzing existing water supply system status by conditional survey of Water Treatment
Plants and Layouts, Elevated Service Reservoirs, Pumping Stations, Intake Arrangements.
Integration of Existing/ Ongoing schemes with proposed schemes.
Design of Distribution Networks using EPANET and WATERGMES for Various Zones
Hydraulic design of raw water transmission main, Economic design of clear water
transmission main, distribution networks.
Preparation of BOQs for Distribution networks and various components of water supply
system
Preparation of Standard drawings of Pumping station and estimations.
Involved in the Design of Water treatment plant of various components.
2

Preparation of detailed design report.


Interacting with the client in project area.
Approval taken by World Bank Team and E-In-C Office, Hyderabad

Project -4
: Consultancy Service for Preparation of Master Plan for Special Economic
Zone for Water Supply, Sewerage system in GABON, Central Africa
Project -5
: Consultancy Service for Preparation of Master Plan for Special Economic
Zone for Water Supply, Sewerage system in Jaipur
Project -6
: Consultancy Service for Preparation of Master Plan for Special Economic
Zone for Water Supply, Sewerage system in Pune, KHED In fracture private limited
Duration : Oct, 2011 May, 2013
Activities performed:

Analyzing existing water supply system status by conditional survey of Water Treatment
Plants and Layouts, Elevated Service Reservoirs, Pumping Stations, Intake Arrangements.

Design of Water supply and sewerage networks by using Water Gems and Sewer Gems
Preparation of BOQs for Pumping station, Lift station including mechanical details and
Distribution networks water supply and Sewerage system
Preparation of Standard drawings of lifting station and pumping stations.

Designation
Employer
Profession
Experience

: Environmental Engineer (Design Engineer)


: M/s Shah Technical Consultants, Mumbai
: Water and Waste Water Engineer
: From: Feb, 2011 To: Sep, 2011

PROJECTS INVOLVED:
Project -1
: Consultancy Service for Preparation of Feasibility Report for Public Private
Partnership (PPP) mode on Condition and Augmentation of Existing Water Supply Systems for
Guntur and Rajahmundry City in Andhra Pradesh
Duration
: Feb, 2011 Sep, 2011
Activities performed:

Analyzing existing water supply system status by conditional survey of Water Treatment
Plants and Layouts, Elevated Service Reservoirs, Pumping Stations, Intake Arrangements.
Integration of Existing/ Ongoing schemes with proposed schemes.
Designing of MBRs (Master Balancing Reservoirs) for Water Supply Distribution System
using Existing Clear Water Transmission Mains.
Designing of BPT (Break Pressure Tank) for converting Pumping Mains to Gravity Mains.
Hydraulic design of raw water transmission main, Economic design of clear water
transmission main, distribution network and village level distribution system.
Preparation of feasibility report and detailed design reports.
Preparation of drawings of Water Supply networks throughout the project area.

Project -2

: Consultancy Service for Preparation of Feasibility Studies for Re Engineering/


Re Construction of Vehar (90 MLD) & Tulsi (18 MLD) Treatment Plants.
3

Project Name: IV - Middle Vaitarna Water Supply Project


Project Type : Project Management Consultancy
Client
: Municipal Corporation of Brihan Mumbai
Duration
: Feb, 2011 Sep, 2011
Description : Vehar and Tulsi lake are the sources for raw water for the treatment plant at Vehar and
Tulsi respectively. Both water treatment plant facing problem of treated water in terms of quality and
quantity. This may be because of old structure, Leakages and non functional of mechanical units. It is
recommended to demolish the existing plant and construct a plant with conventional water treatment
process with plate or tube settler clarifier followed by rapid sand filtration unit.
Activities performed:

Data collection from various departments and preparation of base maps in project area.
Analysed and studied the Existing Water Treatment Plants in project area.
Site inspections, planning, process design, rehabilitation strategy development and formulation
of the proposed Treatment plants
Preparation of feasibility report and detailed design reports.
Preparation of drawings of Treatment plant components in project area.
Interacting with the client in project area.

Designation
Employer
Profession
Experience

: Assistant Engineer (Design Engineer)


: M/s Consulting Engineering Services (India) Private Limited, New Delhi
: Water and Waste Water Engineer
: From: May, 2009
To: Jan, 2011

PROJECTS INVOLVED:
Project -1

: Consultancy services of preparation of Pre-Feasibility report for Development of


Integrated water supply for Chitradurga & Bijapur districts, Karnataka

Client
Duration

: Karnataka Urban Infrastructure Development and Finance Corporation, Bangalore,


: Jun, 2009 Jan, 2011

Project Description: To provide safe & adequate water supply to the entire Rural and Urban population
of Bijapur & Chitradurga districts in Karnataka state through surface water from reservoirs, Canal and
Rivers.
Activities performed:

Data collection from various departments and preparation of base maps in project area.
Analysed the Existing & Ongoing water supply schemes in project area.
Site inspections, planning and formulation of the proposed schemes.
Fixation of layout, finalization of design norms, population projection & demand assessment
for Intermediate and Ultimate stage.
Selection of Minor Irrigation Tanks for storage of water in summer season.
Involved in planning and zoning of schemes according to the culsterwise.
Integaration of Existing/ Ongoing schemes with proposed schemes.
Conceptualized the pipe routing for the distribution of water to the entire project area.
4

Hydraulic design of raw water transmission main, Economic design of clear water
transmission main, distribution network and village level distribution system.
Preparation of feasibility report and detailed design reports.
Preparation of drawings of Water Supply networks throughout the project area.
Interacting with the client (KUIDFC & Local officials in project area).

Project -2

: Consultancy Services to Provide Technical support to Department of Water Supply


and Sanitation Punjab. PRWSSP (Punjab Rural Water Supply & Sanitation Project)
World Bank Assisted Project.

Client
Duration

: State Program Management Cell (SPMC), Government of Punjab, India


: July, 2010 Jan, 2011

Activities performed: Till the date villages are covered so far 25 in water supply design and 5 in
Sewerage network design.
Data collection, Supervise Topographical Survey.
Site visit, planning and formulation of the proposed scheme.
Fixation of layout, finalization of design norms, demand assessment.
Analysed the Existing & Ongoing water supply schemes in project area.
Design of Water Supply & Sewerage Schemes.
Preparation of Preliminary Scheme Reports of Water Supply & Sewerage Schemes.
Preparation of Detailed Scheme Reports of Water Supply & Sewerage Schemes.
Preparation of Bid Documents of Water Supply & Sewerage Schemes.
Preparation of drawings of Water Supply & Sewerage Schemes.
Preparation of Bid Evaluation Performas.
Attending presentation.
Interacting with the client (SPMC & World Bank Officials).
Project -3

: Consultancy Services of Preparation of Detailed Scheme Report for Water Supply


and Sanitation for Haryana 3 Towns (Fatehabad, Tohana, Hansi).

Client
Duration

: PHED, Government of Haryana, India


: Jun, 2009 November, 2009

Activities performed:
Data collection, preparation of maps, reconnaissance survey.
Site visit, planning and formulation of the proposed scheme, fixation of layout.
Finalization of design norms, demand assessment, hydraulic design of system components.
Hydraulic design of raw water transmission main, Economic design of clear water
transmission main and distribution network
Design of Water Supply & Sewerage Schemes according to Zonalwise.
Preparation of Preliminary Scheme Reports of Water Supply & Sewerage Schemes.
Preparation of Detailed Scheme Reports of Water Supply & Sewerage Schemes.
Preparation of Bid Documents of Water Supply & Sewerage Schemes.
Preparation of drawings of Water Supply & Sewerage Schemes.

SOFTWARE EXPOSURE
Languages
Softwares

:C
: LOOP,
BRANCH,
AUTOCAD

EPANET,
5

WATERGEMS,

SEWERGEMS

Operating System: Windows


Operation tool : MS Office

PERSONAL PROFILE
Name
Fathers Name
Sex & Marital Status
Nationality
Languages Known
Mobile

:
:
:
:
:

Chandra Shekhar Reddy. Yedla


Koti Reddy. Yedla
Male & Married
Indian
English, Telugu, Hindi
:
+91-9581368537
DECLARATION

I hereby declare that all the above information made above is true and complete to the best of my
knowledge.
Date: 14-09-2014
Place: Hyderabad

(CHANDRA SHEKHAR REDDY. Y)

You might also like