51404

Notices Federal Register


Vol. 72, No. 173

Friday, September 7, 2007

This section of the FEDERAL REGISTER Both agencies have determined an EIS/ SUPPLMENTARY INFORMATION for dates
contains documents other than rules or EIR is needed to effectively analyze the and addresses of future public meetings.
proposed rules that are applicable to the proposal and evaluate impacts. FOR FURTHER INFORMATION CONTACT: For
public. Notices of hearings and investigations, The proposed project involves several
committee meetings, agency decisions and additional information related to the
types of transmission upgrades, project on National Forest System land,
rulings, delegations of authority, filing of including: (1) Constructing new 500-kV
petitions and applications and agency contact George Farra, Project Manager,
transmission lines; (2) constructing o
statements of organization and functions are Forest Service, Angeles National Forest,
examples of documents appearing in this new single-circuit 220-kV transmission
701 N. Santa Anita Ave., Arcadia, CA
section. lines; (3) rebuilding existing 220-kV
91006, phone: (626) 574–5301. For
lines to 500-V standards; (4) rebuilding
additional information related to the
existing single-circuit transmission lines
project on non-National Forest System
DEPARTMENT OF AGRICULTURE to double-circuit transmission lines; (5)
land, contact John Boccio, California
relocating several existing 66-kV
Public Utilities Commission, 505 Van
Forest Service subtransmission lines; (6) constructing a
Ness Avenue, San Francisco, CA 94102;
new 500-kV substation; and (7)
Angeles National Forest, CA, phone: (415) 703–2641. Project
upgrading five existing substations.
Tehachapi Renewable Transmission information can also be requested by
Approximately 46 miles of the project
Project leaving a voice message or sending a fax
would be located in a 200- to 400-foot
to the Project Information Hotline at
AGENCY: Forest Service, USDA. right-of-way on National Forest System
(888) 331–9897.
land (managed by the Angeles National
ACTION: Notice of intent to prepare a SUPPLEMENTARY INFORMATION:
Forest) and approximately 3 miles
joint environmental impact statement/
would require expanded right-of-way Proposed Action
report.
within the Angeles National Forest. The
SUMMARY: The USDA Forest Service, USDA Forest Service and the CPUC Southern California Edison would
together with the California Public invite written comments on the scope of construct, use, and maintain a series of
Utilities Commission (CPUC), will this proposed project. In addition, the new and upgraded high-voltage electric
prepare a joint Environmental Impact agencies give notice of this analysis so transmission lines and substations to
Statement (EIS) and Environmental that interested and affected individuals deliver electricity generated from new
Impact Report (EIR) in response to are aware of how they may participate wind energy projects in eastern Kern
applications received from Southern and contribute to the final decision. County, California. The proposed
California Edison for construction of a DATES: Comments concerning the scope transmission system upgrades are
series of transmission system of the analysis must be received by seperated into eight distinct segments.
improvements to deliver electricity from October 1, 2007. Nine public scoping The proposed projects’s major
new wind energy projects in eastern meetings are planned to provide components include the following, by
Kern County. The proposed project information about the proposed project segment:
would be located in Kern, Los Angeles, and to allow people to comment on the • Segment 4: Construct a new ∼16-
and San Bernardino counties. The proposed project. The draft EIS/EIR is mile single-circuit 500-kV transmission
purpose of the project is to provide the expected to be published in July 2008 line from the new Whirlwind Substation
electrical facilities necessary to integrate and the final EIS/EIR is expected in to the existing Antelope Substation. The
levels of new wind generation in the December 2008. existing right-of-way would be
Tehachapi Wind Resource Area, and ADDRESSES: To request a copy of the expanded by 200 feet and construct two
accommodate solar and geothermal draft or final EIS/EIR and/or to send new parallel ∼4-mile single-circuit 220-
projects currently being planned or written comments, please write to the kV transmission lines from the proposed
expected in the future. It would also Angeles National Forest and/or Cottonwind Substation (not part of this
improve the reliability of the California Public Utilities Commission, project) to the new Whirlwind
transmission grid in the Antelope Valley c/o Aspen Environmental Group, 30423 Substation. The transmission line would
and address existing constraints in the Canwood Street, Suite 215, Agoura be initially energized at 220 kV with the
transmission system south of the Lugo Hills, CA 91301. intent of energizing the system to 500
Substation in Hesperia, California. The E-mail communications are also kV in the future as more wind projects
Forest Service is the lead Federal agency welcome; however, please include your are developed.
for the preparation of this EIS/EIR in name and a return address in the e-mail • Segment 5: Replace two single-
compliance with the National message. E-mail messages should be circuit 220-kV transmission lines
Environmental Policy Act (NEPA) and sent to TRTP@aspeneg.com. Information (Antelope-Vincent and Antelope-Mesa)
all other applicable federal laws, about this application and the with a new ∼18-mile single-circuit 500-
executive orders, regulations, and environmental review process will be kV transmission line in existing ROW
direction. The CPUC is the lead State of posted on the Internet at: Ftp:// between Antelope Substation and
mstockstill on PROD1PC66 with NOTICES

California agency for the preparation of ftp.cpuc.ca.gov/gopher-data/environ/ Vincent Substation.


the EIS/EIR in compliance with the tehachapi_renewables/TRTP.htm. This • Segment 6: Replace 27 miles of the
California Environmental Quality Act site will be used to post all public Antelope-Mesa 220-kV transmission
(CEQA), California Public Resource documents during the environmental line and 5 miles of the Rio Hondo-
Code Division 13, and all other review process and to announce Vincent No. 2 with a single-circuit 500-
applicable state laws and regulations. upcoming public meetings. See kV transmission line between Vincent

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00001 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1
Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices 51405

Substation and the southern Angeles the Tehachapi Wind Resource Area, and System lands. This alternative would be
National Forest boundary. accommodate solar and geothermal developed during the environmental
• Segment 7: Replace ∼16 miles of the projects currently being planned or review process.
Antelope-Mesa 220-kV transmission expected in the future. The project will • Alternate routing between Windhub
line with a single-circuit 500-kV also address the reliability needs of the and Whirlwind Substations (Segment
transmission line from the southern CAISO-controlled grid due to projected 10).
boundary of the Angeles National Forest load growth in the Antelope Valley and
to the Mesa Substation. Additional alternatives will be
the South of Lugo transmission
• Segment 8: Replace ∼33 miles of developed, as needed, during the
constraints.
220-kV transmission line from the San environmental review process. The final
Gabriel Junction (2 miles east of Mesa Background alternatives analyzed in detail will
Substation) to the existing Mira Loma Southern California Edison has depend on the issues raised during
Substation. Relocate 66-kV proposed the construction of a 220/500– public scoping and further investigation
subtransmission lines in the Mesa and kV transmission system that would of the feasibility of alternatives.
Chino Areas within existing or public include a series of new and upgraded Lead and Cooperating Agencies
right-of-way. Additionally, ∼45 existing high-voltage electric transmission lines
double-circuit 66-kV subtransmission and substations to deliver electricity The USDA Forest Service and the
lines in the Mesa and Chino Areas from new wind energy projects in CPUC will be joint lead agencies in
would be removed/relocated within eastern Kern County, California. The accordance with 40 CFR 1501.5(b), and
existing or public right-of-way or project would provide the electrical are responsible for the preparation of
undergrounded. facilities necessary to integrate levels of the EIS/EIR. The Forest Service will
• Segment 9: Construct new 500/220- new wind generation in excess of 700 serve as the lead agency under NEPA.
kV Whirlwind Substation adjacent to MW and up to approximately 4,500 MW The CPUC will serve as the lead agency
Path 26 and upgrade the Antelope in the Tehachapi Wind Resource Area. under CEQA in accordance with
Substation to include new 500-kV Under Sections 210 and 212 of the California Code of Regulations, Title 14,
facilities. Expand and upgrade 500-kV Federal Power Act (16 U.S.C. 824 (i) and Chapter 3, Article 4, § 15050.
facilities at Vincent Substation. Install (k)) and Sections 3.2 and 5.7 of the Responsible Official
reactive compensation equipment at California Independent System
Vincent Substation and Antelope Operator’s Tariff, Southern California The Forest Service responsible official
Substation. Upgrade the Gould Edison is obligated to interconnect and for the preparation of the EIS/EIR is
Substation, Mesa Substation, and Mira integrate this wind energy project into Jody Noiron, Forest Supervisor, Angeles
Loma Substation within the existing its system. In addition, the 2001 National Forest, 701 N. Santa Anita
fence line. National Energy Policy goals are to Avenue, Arcadia, CA 91006.
• Segment 10: Construct a new ∼17- increase domestic energy supplies, Nature of Decision To Be Made
mile single-circuit 500–kV transmission modernize and improve our nation’s
line in a new 330-foot-wide corridor energy infrastructure, and improve the The Forest Supervisor for the Angeles
from the approved WindHub Substation reliability of the delivery of energy from National Forest will decide whether to
to the new Whirlwind Substation. its sources to points of use. authorize a 50-year term Special Use
• Segment 11: Replace ∼19 miles of Executive Order 13212 encourages Permit for construction, use, and
single-circuit 220-kV transmission line increased production and transmission maintenance of 500-kV transmission
with a single-circuit 500-kV of energy in a safe and environmentally lines and a new 220-kV circuit. The
transmission line from Vincent sound manner. According to Executive authorization will include ancillary
Substation to Gould Substation. Install Order 13212, for energy-related projects, improvements on National Forest
∼18 miles of 220-kV circuit on the agencies shall expedite their review of System lands needed to maintain this
vacant side of existing double-circuit permits or take other actions as system (e.g., towers, roads,
220-kV lattice steel towers (now necessary to accelerate the completion communication equipment, helicopter
carrying the Eagle Rock-Mesa 220-kV of such projects. The agencies shall take landing sites). The Forest Supervisor
transmission line) between Gould such actions to the extent permitted by will only make a decision regarding
Substation and Mesa Substation. law and regulations, and where impacts on National Forest System
Construction activities associated appropriate. Based on the 2005 Angeles lands.
with the proposed action would include National Forest Land and Resource Scoping Process
upgrading 5 existing substations, Management Plan, the proposed routes
construction of 1 new substation, are within designated utility corridors. Public participation will be especially
installation of approximately 851 new important at several stages during the
towers, repairing existing access and Possible Alternatives analysis. The lead agencies will be
spur roads along with the temporary use Presently, the USDA Forest Service seeking information, comments, and
and construction of spur roads, and the and the CPUC have identified assistance from Federal, State, local
temporary use of approximately 141 preliminary action alternatives for agencies, and other individuals and
new pulling locations and 103 new consideration in the environmental organizations that may be interested in
splicing locations. Only segments 6 and analysis. The alternatives currently or affected by the proposed project. This
11 are located on National Forest under consideration (besides the input will be used in preparation of the
System lands. proposed action) are: draft EIS/EIR.
• The No-Action Alternative, under Nine scoping meetings are proposed
mstockstill on PROD1PC66 with NOTICES

Purpose and Need for Action which the proposed transmission line to provide information about the
The purpose for this action is to would not be constructed and no proposed project to the public and to
provide the electrical facilities expansion activities would occur. allow people to comment on the
necessary to integrate levels of new • The Non-National Forest System proposed project. The scoping meetings
wind generation in excess of 700 MW Land Alternative that would avoid will be held on the following dates,
and up to approximately 4,500 MW in proposed activities on National Forest times, and locations:

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00002 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1
51406 Federal Register / Vol. 72, No. 173 / Friday, September 7, 2007 / Notices

1. September 6, 2007, 6:30 p.m.; La Pollutant Discharge Elimination System meaningful and alerts an agency to the
Serna High School, Cafeteria, 15301 General Construction Permit issued by reviewer’s position and contentions.
Youngwood Drive, Whittier, CA 90605; California’s Regional Water Quality Vermont Yankee Nuclear Power Corp. v.
562–698–8121. Control Board, a Section 404 Permit (per NRDC, 435 U.S. 519, 553 (1978). Also,
2. September 10, 2007, 2:30 p.m. and Section 404 of the Clean Water Act) environmental objections that could be
6:30 p.m.; Palmdale Cultural Center, issued by the U.S. Army Corps of raised at the draft environmental EIS
38350 Sierra Highway, Palmdale, CA Engineers, and a Streambed Alteration stage but that are not raised until after
93550; 661–267–5656. Agreement ( per Section 1601 of the completion of the final EIS may be
3. September 11, 6:30 p.m.; Kern California Fish and Game Code) issued waived or dismissed by the courts. City
County Library—Wanda Kirk Branch, by the California Department of Fish of Angoon v. Hodel, 803 F.2d 1016,
3611 Rosamond Blvd., Rosamond, CA and Game. 1022 (9th Cir. 1986) and Wisconsin
93561; 661–256–3236. Heritages, Inc. v. Harris, 490 F. Supp.
4. September 12, 6:30 p.m.; Duarte Comment Requested
1334, 1338 (E.D. Wis. 1980). Because of
Community Center, 1600 Huntington This notice of intent initiates the these court rulings, it is very important
Drive, Duarte, CA 91010; 626–303–8429. scoping process that guides the that those interested in this proposed
5. September 13, 2007, 6:30 p.m.; development of the EIS/EIR. The Forest action participate by the close of the 45-
Garvey Community Center, 9108 Garvey Service is seeking public and agency day comment period so that substantive
Avenue, Rosemead, CA 91770; 323– comment on the proposed project to comments and objections are made
720–5213. identify major issues to be analyzed in available to the Forest Service at a time
6. September 19, 2007, 6:30 p.m.; depth and assistance in identifying when it is meaningful to consider and
Altadena Community Center, 730 E. potential alternatives to be evaluated. respond to comments in the final EIS/
Altadena Drive, Altadena, CA 91001; Comments received on this notice, EIR.
(626) 398–6174. including the names and addresses of To assist the Forest Service in
7. September 20, 2007, 2:30 p.m. and those who comment, will be considered identifying and considering issues and
6:30 p.m.; Chino Hills Council as part of the public record on this concerns on the proposed project,
Chambers, 2001 Grand Avenue, Chino proposed project, and will be available comments on the draft EIS/EIR should
Hills, CA 91709; 909–930–8495. for public inspection. Comments be as specific as possible. It is also
submitted anonymously will be helpful if comments refer to specific
Preliminary Issues
accepted and considered; however, pages or chapters of the draft statement.
A number of potential impacts were those who submit anonymous Comments may also address the
identified in the Proponent’s comments will not have standing to adequacy of the draft EIS/EIR or the
Environmental Assessment Tehachapi appeal the subsequent decision under merits of the alternatives formulated
Renewable Transmission Project issued 36 CFR Part 215. Additionally, pursuant and discussed in the statement.
by Southern California Edison on June to 7 CFR 1.27(d), any person may Reviewers may wish to refer to the
29, 2007. The following preliminary request the agency to withhold a Council on Environmental Quality
issues were identified in this report submission from the public record by Regulations for implementing the
related to the proposed project’s showing how the Freedom of procedural provisions of NEPA at 40
potential effects on the environment: Information Act (FOIA) permits such
CFR 1503.3 in addressing these points.
Visual resources; agriculture; air quality; confidentiality. Persons requesting such
biological, cultural, and geological confidentiality should be aware that, (Authority: 40 CFR 1501.7 and 1508.22;
resources; hazards and hazardous under the FOIA, confidentiality may be Forest Service Handbook 1909.15, Section
21)
materials; hydrology and water quality; granted in only very limited
land use and planning; mineral circumstances, such as to protect trade Dated: August 23, 2007.
resources; noise; population and secrets. The Forest Service will inform Jody Noiron,
housing; public services and utilities; the requester of the agency’s decision Forest Supervisor.
recreation; traffic and transportation; regarding the request for confidentiality. [FR Doc. E7–17168 Filed 9–6–07; 8:45 am]
and paleontological resources. Other Where the request is denied, the agency BILLING CODE 3410–11–P
issues identified are impacts to future will return the submission and notify
forest management projects (e.g., fuel the requester that the comments may be
hazard reduction projects and fire resubmitted, without names and DEPARTMENT OF COMMERCE
fighting strategies). addresses, within a specified number of
days. Foreign-Trade Zones Board
Permits or Licenses Required Early Notice of Importance of Public
A 50-year term special use permit for Participation in Subsequent [Docket 43–2007]
the construction, maintenance, and use Environmental Review: A draft EIS/EIR Foreign-Trade Zone 235—Lakewood,
of the transmission line would be will be prepared for comment. The NJ; Application for Expansion
authorized to Southern California comment period on the draft EIS/EIR
Edison by the Forest Supervisor for the will be 45 days from the date the An application has been submitted to
Angeles National Forest for Segments 6 Environmental Protection Agency the Foreign-Trade Zones (FTZ) Board
and 11, and a Certificate of Public publishes the notice of availability in (the Board) by the Township of
Convenience and Necessity would be the Federal Register. Lakewood, New Jersey, grantee of FTZ
issued by the California Public Utilities The Forest Service believes, at this 235, requesting authority to expand its
Commission as part of this decision. early stage, that it is important to give existing zone to include additional sites
mstockstill on PROD1PC66 with NOTICES

Additional permits that may be required reviewers notice of several court rulings in or adjacent to the Philadelphia
of Southern California Edison to related to public participation in the Customs and Border Protection port of
construct the proposed project could environmental review process. First, entry. The application was submitted
include: A Permit to Operate issued by reviewers of draft EISs must structure pursuant to the provisions of the
the South Coast Air Quality their participation in the environmental Foreign-Trade Zones Act, as amended
Management District, a National review of the proposal so that it is (19 U.S.C. 81a–81u), and the regulations

VerDate Aug<31>2005 18:34 Sep 06, 2007 Jkt 211001 PO 00000 Frm 00003 Fmt 4703 Sfmt 4703 E:\FR\FM\07SEN1.SGM 07SEN1