You are on page 1of 2

54470 Federal Register / Vol. 72, No.

185 / Tuesday, September 25, 2007 / Notices

staff. To be considered, comments on November 1, 2007. Members of the This meeting will be webcast live at
the draft supplement to the GEIS and public may also register to provide oral the Web address—http://www.nrc.gov.
the proposed action must be received by comments within 15 minutes of the start
Week of October 8, 2007—Tentative
December 26, 2007; the NRC staff is able of each session. Individual, oral
to assure consideration only for comments may be limited by the time There are no meetings scheduled for
comments received on or before this available, depending on the number of the Week of October 8, 2007.
date. Comments received after the due persons who register. If special Week of October 15, 2007—Tentative
date will be considered only if it is equipment or accommodations are
practical to do so. Written comments on needed to attend or present information There are no meetings scheduled for
the draft supplement to the GEIS should at the public meeting, the need should the Week of October 15, 2007.
be sent to: Chief, Rulemaking, Directives be brought to the attention of Mr. Week of October 22, 2007—Tentative
and Editing Branch, Division of Christian Jacobs no later than October
Administrative Services, Office of 25, 2007, to provide the NRC staff Wednesday, October 24, 2007
Administration, Mailstop T–6D59, U.S. adequate notice to determine whether 9:30 a.m.
Nuclear Regulatory Commission, the request can be accommodated. Periodic Briefing on New Reactor
Washington, DC 20555–0001. FOR FURTHER INFORMATION CONTACT: Mr. Issues, Part 1 (Public Meeting)
Comments may be hand-delivered to
Christian Jacobs, Environmental Branch (Contact: Roger Rihm, 301–415–
the NRC at 11545 Rockville Pike, Room
B, Division of License Renewal, Office 7807)
T–6D59, Rockville, Maryland 20852,
of Nuclear Reactor Regulation, U.S. This meeting will be webcast live at
between 7:30 a.m. and 4:15 p.m. on
Nuclear Regulatory Commission, Mail the Web address—http://www.nrc.gov.
Federal workdays. Electronic comments
Stop O–11F1, Washington, DC 20555– 1:30 p.m.
may be submitted to the NRC by e-mail
0001. Mr. Jacobs may be contacted at the Periodic Briefing on New Reactor
at WolfCreekEIS@nrc.gov. All comments
aforementioned telephone number or e- Issues, Part 2 (Public Meeting)
received by the Commission, including
those made by Federal, State, local mail address. (Contact: Roger Rihm, 301–415–
agencies, Native American Tribes, or Dated at Rockville, Maryland, this 18th day 7807).
other interested persons, will be made of September, 2007.
This meeting will be webcast live at
available electronically at the For the Nuclear Regulatory Commission. the Web address—http://www.nrc.gov.
Commission’s PDR in Rockville, Samuel Hernandez-Quinones,
Maryland, and through ADAMS. Acting Branch Chief, Environmental Branch Week of October 29, 2007—Tentative
The NRC staff will hold a public B, Division of License Renewal, Office of There are no meetings scheduled for
meeting to present an overview of the Nuclear Reactor Regulation.
the Week of October 29, 2007.
draft plant-specific supplement to the [FR Doc. E7–18874 Filed 9–24–07; 8:45 am] * The schedule for Commission
GEIS and to accept public comments on BILLING CODE 7590–01–P meetings is subject to change on short
the document. The public meeting will
notice. To verify the status of meetings,
be held on November 8, 2007, at the
call (recording)—(301) 415–1292.
Coffey County Library, Burlington NUCLEAR REGULATORY Contact person for more information:
Branch, 410 Juniatta St., Burlington, KS COMMISSION Michelle Schroll, (301) 415–1662.
66839. There will be two sessions to
Sunshine Act Federal Register Notice The NRC Commission Meeting
accommodate interested parties. The
Schedule can be found on the Internet
first session will convene at 1:30 p.m.
Agency Holding the Meetings: Nuclear at: http://www.nrc.gov/about-nrc/policy-
and will continue until 4:30 p.m., as
necessary. The second session will Regulatory Commission. making/schedule.html.
convene at 7 p.m. with a repeat of the The NRC provides reasonable
overview portions of the meeting and DATE: Weeks of September 24, October accommodation to individuals with
will continue until 10 p.m., as 1, 8, 15, 22, 29, 2007. disabilities where appropriate. If you
necessary. Both meetings will be PLACE: Commissioners’ Conference need a reasonable accommodation to
transcribed and will include: (1) A Room, 11555 Rockville Pike, Rockville, participate in these public meetings, or
presentation of the contents of the draft Maryland. need this meeting notice or the
plant-specific supplement to the GEIS, transcript or other information from the
STATUS: Public and Closed.
and (2) the opportunity for interested public meetings in another format (e.g.
MATTERS TO BE CONSIDERED: braille, large print), please notify the
government agencies, organizations, and
individuals to provide comments on the Week of September 24, 2007 NRC’s Disability Program Coordinator,
draft report. Additionally, the NRC staff Rohn Brown, at 301–492–2279, TDD:
There are no meetings scheduled for 301–415–2100, or by e-mail at
will host informal discussions one hour the Week of September 24, 2007.
prior to the start of each session at the REB3@nrc.gov. Determinations on
same location. No comments on the Week of October 1, 2007—Tentative requests for reasonable accommodation
draft supplement to the GEIS will be will be made on a case-by-case basis.
Monday, October 1, 2007
accepted during the informal * * * * *
discussions. To be considered, 1:30 p.m. This notice is distributed by mail to
comments must be provided either at Periodic Briefing on Security Issues several hundred subscribers; if you no
the transcribed public meeting or in (Closed—Ex. 1 & 3) longer wish to receive it, or would like
writing. Persons may pre-register to to be added to the distribution, please
Wednesday, October 3, 2007
attend or present oral comments at the contact the Office of the Secretary,
yshivers on PROD1PC62 with NOTICES

meeting by contacting Mr. Christian 2 p.m. Washington, DC 20555 (301–415–1969).


Jacobs, the NRC Environmental Project Briefing on NRC’s International In addition, distribution of this meeting
Manager at 1–800–368–5642, extension Programs, Performance, and Plans notice over the Internet system is
3874, or by e-mail at (Public Meeting) (Contact: Karen available. If you are interested in
WolfCreekEIS@nrc.gov no later than Henderson, 301–415–0202) receiving this Commission meeting

VerDate Aug<31>2005 15:20 Sep 24, 2007 Jkt 211001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\25SEN1.SGM 25SEN1
Federal Register / Vol. 72, No. 185 / Tuesday, September 25, 2007 / Notices 54471

schedule electronically, please send an within 30 days after the date of affected by this proceeding and who
electronic message to dkw@nrc.gov. publication of this notice will be wishes to participate as a party in the
Dated: September 19, 2007. considered in making any final proceeding must file a written request
R. Michelle Schroll,
determination. Within 60 days after the for a hearing and a petition for leave to
date of publication of this notice, the intervene. Requests for a hearing and a
Office of the Secretary.
licensee may file a request for a hearing petition for leave to intervene shall be
[FR Doc. 07–4732 Filed 9–21–07; 1:11 pm] with respect to issuance of the filed in accordance with the
BILLING CODE 7590–01–P amendment to the subject facility Commission’s ‘‘Rules of Practice for
operating license and any person whose Domestic Licensing Proceedings’’ in 10
interest may be affected by this CFR part 2. Interested persons should
NUCLEAR REGULATORY proceeding and who wishes to consult a current copy of 10 CFR 2.309,
COMMISSION participate as a party in the proceeding which is available at the Commission’s
must file a written request for a hearing PDR, located at One White Flint North,
Biweekly Notice; Applications and
and a petition for leave to intervene. Public File Area 01F21, 11555 Rockville
Amendments to Facility Operating
Normally, the Commission will not Pike (first floor), Rockville, Maryland.
Licenses Involving No Significant issue the amendment until the Publicly available records will be
Hazards Considerations expiration of 60 days after the date of accessible from the Agencywide
I. Background publication of this notice. The Documents Access and Management
Commission may issue the license System’s (ADAMS) Public Electronic
Pursuant to section 189a.(2) of the amendment before expiration of the 60- Reading Room on the Internet at the
Atomic Energy Act of 1954, as amended day period provided that its final NRC Web site, http://www.nrc.gov/
(the Act), the U.S. Nuclear Regulatory determination is that the amendment reading-rm/doc-collections/cfr/. If a
Commission (the Commission or NRC involves no significant hazards request for a hearing or petition for
staff) is publishing this regular biweekly consideration. In addition, the leave to intervene is filed within 60
notice. The Act requires the Commission may issue the amendment days, the Commission or a presiding
Commission publish notice of any prior to the expiration of the 30-day officer designated by the Commission or
amendments issued, or proposed to be comment period should circumstances by the Chief Administrative Judge of the
issued and grants the Commission the change during the 30-day comment Atomic Safety and Licensing Board
authority to issue and make period such that failure to act in a Panel, will rule on the request and/or
immediately effective any amendment timely way would result, for example in petition; and the Secretary or the Chief
to an operating license upon a derating or shutdown of the facility. Administrative Judge of the Atomic
determination by the Commission that Should the Commission take action Safety and Licensing Board will issue a
such amendment involves no significant prior to the expiration of either the notice of a hearing or an appropriate
hazards consideration, notwithstanding comment period or the notice period, it order.
the pendency before the Commission of will publish in the Federal Register a As required by 10 CFR 2.309, a
a request for a hearing from any person. notice of issuance. Should the petition for leave to intervene shall set
This biweekly notice includes all Commission make a final No Significant forth with particularity the interest of
notices of amendments issued, or Hazards Consideration Determination, the petitioner in the proceeding, and
proposed to be issued from August 30, any hearing will take place after how that interest may be affected by the
2007 to September 12, 2007. The last issuance. The Commission expects that results of the proceeding. The petition
biweekly notice was published on the need to take this action will occur should specifically explain the reasons
September 11, 2007 (72 FR 51852). very infrequently. why intervention should be permitted
Notice of Consideration of Issuance of Written comments may be submitted with particular reference to the
Amendments to Facility Operating by mail to the Chief, Rulemaking, following general requirements: (1) The
Licenses, Proposed No Significant Directives and Editing Branch, Division name, address, and telephone number of
Hazards Consideration Determination, of Administrative Services, Office of the requestor or petitioner; (2) the
and Opportunity for a Hearing Administration, U.S. Nuclear Regulatory nature of the requestor’s/petitioner’s
Commission, Washington, DC 20555– right under the Act to be made a party
The Commission has made a 0001, and should cite the publication to the proceeding; (3) the nature and
proposed determination that the date and page number of this Federal extent of the requestor’s/petitioner’s
following amendment requests involve Register notice. Written comments may property, financial, or other interest in
no significant hazards consideration. also be delivered to Room 6D22, Two the proceeding; and (4) the possible
Under the Commission’s regulations in White Flint North, 11545 Rockville effect of any decision or order which
10 CFR 50.92, this means that operation Pike, Rockville, Maryland, from 7:30 may be entered in the proceeding on the
of the facility in accordance with the a.m. to 4:15 p.m. Federal workdays. requestor’s/petitioner’s interest. The
proposed amendment would not (1) Copies of written comments received petition must also set forth the specific
involve a significant increase in the may be examined at the Commission’s contentions which the petitioner/
probability or consequences of an Public Document Room (PDR), located requestor seeks to have litigated at the
accident previously evaluated; or (2) at One White Flint North, Public File proceeding.
create the possibility of a new or Area O1F21, 11555 Rockville Pike (first Each contention must consist of a
different kind of accident from any floor), Rockville, Maryland. The filing of specific statement of the issue of law or
accident previously evaluated; or (3) requests for a hearing and petitions for fact to be raised or controverted. In
involve a significant reduction in a leave to intervene is discussed below. addition, the petitioner/requestor shall
margin of safety. The basis for this Within 60 days after the date of provide a brief explanation of the bases
yshivers on PROD1PC62 with NOTICES

proposed determination for each publication of this notice, the licensee for the contention and a concise
amendment request is shown below. may file a request for a hearing with statement of the alleged facts or expert
The Commission is seeking public respect to issuance of the amendment to opinion which support the contention
comments on this proposed the subject facility operating license and and on which the petitioner/requestor
determination. Any comments received any person whose interest may be intends to rely in proving the contention

VerDate Aug<31>2005 15:20 Sep 24, 2007 Jkt 211001 PO 00000 Frm 00055 Fmt 4703 Sfmt 4703 E:\FR\FM\25SEN1.SGM 25SEN1

You might also like