You are on page 1of 1

60834 Federal Register / Vol. 72, No.

207 / Friday, October 26, 2007 / Notices

DEPARTMENT OF ENERGY FERCOnlineSupport@ferc.gov, or call 888 First Street, NE., Washington, DC


(866) 208–3676 (toll free). For TTY, call 20426.
Federal Energy Regulatory (202) 502–8659. This filing is accessible on-line at
Commission Comment Date: 5 p.m. Eastern Time http://www.ferc.gov, using the
[Docket No. EF07–3011–000] on November 19, 2007. ‘‘eLibrary’’ link and is available for
review in the Commission’s Public
Kimberly D. Bose,
Southeastern Power Administration; Reference Room in Washington, DC.
Secretary. There is an ‘‘eSubscription’’ link on the
Notice of Filing
[FR Doc. E7–21158 Filed 10–25–07; 8:45 am] Web site that enables subscribers to
October 18, 2007. BILLING CODE 6717–01–P receive e-mail notification when a
Take notice that on September 13, document is added to a subscribed
2007, the Deputy Secretary, U.S. docket(s). For assistance with any FERC
Department of Energy, pursuant to the DEPARTMENT OF ENERGY Online service, please e-mail
authority vested in the Deputy Secretary FERCOnlineSupport@ferc.gov, or call
by the Department of Energy’s Federal Energy Regulatory
(866) 208–3676 (toll free). For TTY, call
Delegation Order Nos. 00–001.00C and Commission
(202) 502–8659.
00–037.00, and by sections 302(a) and [Docket No. RC08–1–000] Comment Date: 5 p.m. Eastern Time
301(b) of the Department of Energy on November 14, 2007.
Organization Act (Pub. L. 95091), Southeastern Power Administration;
submitted for confirmation and Notice of Filing Kimberly D. Bose,
approval on a final basis, Rate Secretary.
Schedules SOCO–1–C, SOCO–2–C, October 19, 2007. [FR Doc. E7–21159 Filed 10–25–07; 8:45 am]
SOCO–3–C, SOCO–4–C, ALA–1–L, Take notice that on October 15, 2007, BILLING CODE 6717–01–P
MISS–1–L, Duke-1–C, Duke-2–C, Duke- Southeastern Power Administration
3–C, Duke-4–C, Santee-1–C, Santee-2–C, (Southeastern) filed an appeal of the
Santee-3–C, Santee-4–C, SCE&G–1–C, September 25, 2007 decision of the DEPARTMENT OF ENERGY
SCE&G–2–C, SCE&G–3–C, SCE&G–4–C, North American Electric Reliability
Pump-1–A, Pump-2, Replacement-1, Corporation (NERC) to include Federal Energy Regulatory
and Regulation-1, effective October 1, Southeastern Power Administration on Commission
2007 and ending September 30, 2012. the NERC compliance registry within
[Docket No. CP08–5–000]
Any person desiring to intervene or to the SERC Reliability Corporation for the
protest this filing must file in function of transmission operator and Southern Natural Gas Company;
accordance with Rules 211 and 214 of resource planner. Southeastern states Magnolia Enterprise Holdings, Inc.;
the Commission’s Rules of Practice and that it has the responsibility to market Notice of Application
Procedure (18 CFR 385.211, 385.214). the electric power generated at reservoir
Protests will be considered by the projects owned and operated by the U.S. October 19, 2007.
Commission in determining the Army Corps of Engineers in the Take notice that on October 5, 2007,
appropriate action to be taken, but will southeast and neither owns or operates Southern Natural Gas Company
not serve to make protestants parties to a generation or transmission system. (Southern), P.O. Box 2563, Birmingham,
the proceeding. Any person wishing to Southeastern asks the Commission to Alabama 35202–2563, filed an
become a party must file a notice of reverse the NERC’s decision to register application in Docket No. CP08–5–000
intervention or motion to intervene, as Southeastern as a transmission operator pursuant to section 7 of the Natural Gas
appropriate. Such notices, motions, or and resource planner. Act (NGA), for approval to abandon and
protests must be filed on or before the Any person desiring to intervene or to lease certain pipeline and appurtenant
comment date. On or before the protest this filing must file in facilities and authorization to construct,
comment date, it is not necessary to accordance with Rules 211 and 214 of install and operate a new compressor
serve motions to intervene or protests the Commission’s Rules of Practice and unit on its Cypress Pipeline and related
on persons other than the Applicant. Procedure (18 CFR 385.211, 385.214). appurtenant facilities. Magnolia
The Commission encourages Protests will be considered by the Enterprise Holdings, Inc. (MEHI), Ten
electronic submission of protests and Commission in determining the Peachtree Place, Location 1466, Atlanta,
interventions in lieu of paper using the appropriate action to be taken, but will Georgia 30309, filed a request in the
‘‘eFiling’’ link at http://www.ferc.gov. not serve to make protestants parties to same application pursuant to section 7
Persons unable to file electronically the proceeding. Any person wishing to of the NGA, for authorization to acquire
should submit an original and 14 copies become a party must file a notice of certain pipeline, measurement and
of the protest or intervention to the intervention or motion to intervene, as compression facilities and to lease those
Federal Energy Regulatory Commission, appropriate. Such notices, motions, or facilities back to Southern, all as more
888 First Street, NE., Washington, DC protests must be filed on or before the fully set forth in the application which
20426. comment date. On or before the is on file with the Commission and open
This filing is accessible on-line at comment date, it is not necessary to to public inspection.
http://www.ferc.gov, using the serve motions to intervene or protests It is stated that pursuant to the terms
‘‘eLibrary’’ link and is available for on persons other than the Applicant. of a Purchase and Sale Agreement
review in the Commission’s Public The Commission encourages between Southern and AGL Resources,
Reference Room in Washington, DC. electronic submission of protests and Inc., MEHI’s parent company, Southern
There is an ‘‘eSubscription’’ link on the interventions in lieu of paper using the requests authorization to abandon by
rmajette on PROD1PC64 with NOTICES

Web site that enables subscribers to ‘‘eFiling’’ link at http://www.ferc.gov. sale to MEHI an undivided interest of
receive e-mail notification when a Persons unable to file electronically the following:
document is added to a subscribed should submit an original and 14 copies Twin 30 Pipelines extending from
docket(s). For assistance with any FERC of the protest or intervention to the Southern’s interconnection with Elba Island
Online service, please e-mail Federal Energy Regulatory Commission, to Port Wentworth, Georgia in Chatham

VerDate Aug<31>2005 15:23 Oct 25, 2007 Jkt 214001 PO 00000 Frm 00039 Fmt 4703 Sfmt 4703 E:\FR\FM\26OCN1.SGM 26OCN1

You might also like