Federal Register / Vol. 72, No.

217 / Friday, November 9, 2007 / Notices 63569

Finally, public meetings or site visits government representatives and capabilities of the South Welda Storage
will be posted on the Commission’s agencies; elected officials; Native Field.
calendar located at http://www.ferc.gov/ American tribes; other interested The general location of the proposed
EventCalendar/EventsList.aspx along parties; and local libraries and storage field expansion is shown in
with other related information. newspapers. State and local government Appendix 1. 1
representatives are asked to notify their Land Requirements for Construction
Kimberly D. Bose,
constituents of this proposed project
Secretary. and to encourage them to comment on The boundary of the South Welda
[FR Doc. E7–22022 Filed 11–8–07; 8:45 am] their areas of concern. Storage Field would be expanded by
BILLING CODE 6717–01–P A fact sheet prepared by the FERC about 560 acres. Construction of the
entitled ‘‘An Interstate Natural Gas proposed facilities (i.e., well sites,
Facility On My Land? What Do I Need separator sites, the compressor unit,
DEPARTMENT OF ENERGY To Know?’’ addresses a number of temporary workspace, and use of
typically asked questions, including the existing access roads) would require
Federal Energy Regulatory about 21.9 acres of land. Of this acreage,
Commission use of eminent domain and how to
participate in the Commission’s about 20.6 acres would be temporarily
[Docket No. CP08–4–000] proceedings. It is available for viewing impacted and 1.3 acres would be
on the FERC Internet Web site permanently affected.
Southern Star Central Gas Pipeline, (www.ferc.gov). The EA Process
Inc.; Notice of Intent To Prepare An
Environmental Assessment for the Summary of the Proposed Project We 2 are preparing this EA to comply
Proposed South Welda Storage Field with the National Environmental Policy
Southern Star proposes to expand the Act (NEPA) which requires the
Expansion Project and Request for existing certificated boundary and
Comments On Environmental Issues Commission to take into account the
buffer zone of its South Welda Storage environmental impact that could result
November 2, 2007. Field in Anderson County, Kansas by if it authorizes Southern Star’s proposal.
The staff of the Federal Energy about 560 acres. Southern Star states By this notice, we are also asking
Regulatory Commission (FERC or that the additional acreage is necessary federal, state, and local agencies with
Commission) will prepare an to protect the field’s integrity (based on jurisdiction and/or special expertise
environmental assessment (EA) that will conclusions that storage gas has moved with respect to environmental issues to
discuss the environmental impacts of beyond its existing storage boundary) formally cooperate with us in the
the proposed South Welda Storage Field and to establish a buffer zone to protect preparation of the EA. Agencies that
Expansion Project involving the field from future encroachment by would like to request cooperating status
construction and operation of natural third-party exploration or operators. The should follow the instructions for filing
gas facilities by Southern Star Central additional acreage would also prevent comments provided below.
Gas Pipeline, Inc. (Southern Star) in possible venting of the storage gas by oil NEPA also requires the FERC to
Anderson County, Kansas. The EA will operators. Southern Star has identified discover and address concerns the
be used by the Commission in its 11 wells that it would either connect to public may have about proposals. This
decision-making process to determine the pressure recovery system, convert to process is referred to as ‘‘scoping.’’ The
whether the project is in the public pressure observation, or plug. In main goal of the scoping process is to
convenience and necessity. addition, Southern Star would install an focus the analysis in the EA on the
This notice announces the opening of additional natural gas compressor (660 important environmental issues. By this
the scoping process the Commission horsepower) at its existing South Welda Notice of Intent, we are requesting
will use to gather input from the public Booster Station. This would require an public comments on the scope of the
and interested agencies on the project. expansion of the station of 40 feet by issues to address in the EA. All
Your input will help determine which 175 feet. comments received will be considered
issues need to be evaluated in the EA. Southern Star is also requesting during the preparation of the EA.
Please note that the scoping period will authorization to increase the maximum The EA will discuss impacts that
close on December 3, 2007. Details on certificated wellhead shut-in pressure could occur as a result of the
how to submit comments are provided from 430 to 433 pounds per square inch construction and operation of the
in the Public Participation section of gauge. This pressure would align with proposed project under these general
this notice. the same shut-in pressure requested by headings:
If you are a landowner receiving this Southern Star for the North Welda • Geology and soils
notice, you may be contacted by a Storage Field in Docket No. CP07–89– • groundwater resources
pipeline company representative about 000, which is currently under • land use
the acquisition of an easement to Commission review. Certain other • cultural resources
construct, operate, and maintain the recovery and recycling facilities (e.g.,
1 The appendices referenced in this notice are not
proposed facilities. Southern Star would small diameter pipeline lateral
being printing in the Federal Register. Copies are
seek to negotiate a mutually acceptable segments, oil/gas separators, and available on the Commission’s Internet website
agreement. However, if the project is collection tanks) will be constructed (www.ferc.gov) at the ‘‘eLibrary’’ link or from the
approved by the Commission, that under Southern Star’s existing blanket Commission’s Public Reference Room at (202) 502–
approval conveys with it the right of certificate (Docket No. CP82–479–000). 8371. For instructions on connecting to eLibrary,
refer to the ‘‘Additional Information’’ section at the
eminent domain. Therefore, if easement The certificated South Welda Storage end of this notice. Copies of the appendices were
mstockstill on PROD1PC66 with NOTICES

negotiations fail to produce an Field currently operates up to a sent to all those receiving this notice in the mail.
agreement, Southern Star could initiate maximum storage capacity of 18.3 Requests for detailed maps of the well locations and
condemnation proceedings in billion cubic feet. Southern Star states other proposed facilities should be made directly to
Southern Star.
accordance with Kansas state law. that the proposed project and blanket 2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the
This notice is being sent to affected certificate work would not change any environmental staff of the FERC’s Office of Energy
landowners; federal, state, and local of the current operational parameters or Projects.

VerDate Aug<31>2005 23:48 Nov 08, 2007 Jkt 214001 PO 00000 Frm 00023 Fmt 4703 Sfmt 4703 E:\FR\FM\09NON1.SGM 09NON1
63570 Federal Register / Vol. 72, No. 217 / Friday, November 9, 2007 / Notices

• vegetation and wildlife (including We may mail the EA for comment. If formal issuances and submittals in
sensitive species) you are interested in receiving it, please specific dockets. This can reduce the
• air quality and noise return the Information Request amount of time you spend researching
Our independent analysis of the (Appendix 3). If you do not return the proceedings by automatically providing
issues will be in the EA. Depending on Information Request, you will be taken you with notification of these filings,
the comments received during the off the mailing list. document summaries and direct links to
scoping process, the EA may be the documents. Go to www.ferc.gov/
published and mailed to federal, state, Becoming an Intervenor
esubscribenow.htm.
and local agencies, public interest In addition to involvement in the EA Finally, public meetings or site visits
groups, interested individuals, affected scoping process, you may want to will be posted on the Commission’s
landowners, newspapers, libraries, and become an official party to the calendar located at http://www.ferc.gov/
the Commission’s official service list for proceeding known as an ‘‘intervenor.’’ EventCalendar/EventsList.aspx along
this proceeding. A comment period will Intervenors play a more formal role in with other related information. You can
be allotted for review if the EA is the process. Among other things, also request additional information by
published. We will consider all intervenors have the right to receive calling Southern Star at 270–852–4654.
comments on the EA before we make copies of case-related Commission
our recommendations to the documents and filings by other Kimberly D. Bose,
Commission. intervenors. Likewise, each intervenor Secretary.
To ensure your comments are must send one electronic copy (using [FR Doc. E7–22023 Filed 11–8–07; 8:45 am]
considered, please carefully follow the the Commission’s eFiling system) or 14 BILLING CODE 6717–01–P
instructions in the public participation paper copies of its filings to the
section below. Secretary of the Commission and must
send a copy of its filings to all other DEPARTMENT OF ENERGY
Public Participation
parties on the Commission’s service list
You can make a difference by for this proceeding. If you want to Federal Energy Regulatory
providing us with your specific become an intervenor you must file a Commission
comments or concerns about the project. motion to intervene according to Rule [Project No. P–12966–000]
By becoming a commentor, your 214 of the Commission’s Rules of
concerns will be addressed in the EA Practice and Procedure (18 CFR Utah Board of Water Resources;
and considered by the Commission. You 385.214) (see Appendix 2) 3. Only Notice of Application Accepted for
should focus on the potential intervenors have the right to seek Filing and Soliciting Motions To
environmental effects of the proposal, rehearing of the Commission’s decision. Intervene, Protests, and Comments
alternatives to the proposal including Affected landowners and parties with
alternative berthing alignments, and November 2, 2007.
environmental concerns may be granted
measures to avoid or lessen Take notice that the following
intervenor status upon showing good
environmental impact. The more hydroelectric application has been filed
cause by stating that they have a clear
specific your comments, the more useful with the Commission and is available
and direct interest in this proceeding
they will be. Please carefully follow for public inspection:
which would not be adequately
these instructions to ensure that your a. Type of Application: Preliminary
represented by any other parties. You do
comments are received in time and Permit.
not need intervenor status to have your
properly recorded: b. Project No.: 12966–000.
environmental comments considered.
• Send an original and two copies of c. Date filed: August 21, 2007.
your letter to: Kimberley D. Bose, Additional Information d. Applicant: Utah Board of Water
Secretary, Federal Energy Regulatory Additional information about the Resources.
Commission, 888 First St. NE., Room project is available from the e. Name of Project: Lake Powell
1A, Washington, DC 20426. Commission’s Office of External Affairs, Pipeline Project.
• Label one copy of the comments for at 1–866–208-FERC or on the FERC f. Location: The project would be
the attention of Gas Branch 1. Internet Web site (www.ferc.gov) using located on the Lake Powell, Colorado
• Reference Docket No. CP08–4–000. the ‘‘eLibrary’’ link. Click on the River and Sand Hollow Reservoir, in
• Mail your comments so that they eLibrary link, click on ‘‘General Search’’ Kane, Washington, and Iron Counties,
will be received in Washington, DC on and enter the docket number excluding Utah and Coconino and Mohave
or before December 3, 2007. the last three digits in the Docket Counties, Arizona.
The Commission encourages g. Filed Pursuant to: Federal Power
Number field. Be sure you have selected
electronic filing of comments. See 18 Act, 16 U.S.C. 791(a)–825(r).
an appropriate date range. For
Code of Federal Regulations h. Applicant Contact: Mr. Eric Miller,
assistance, please contact FERC Online
385.2001(a)(1)(iii) and the instructions Utah Board of Water Resources, 1594 W.
Support at FercOnlineSupport@ferc.gov
on the Commission’s Internet Web site North Temple, Salt lake City, UT 84116,
or toll free at 1–866–208–3676, or for
at http://www.ferc.gov under the Phone (801) 528–7250, and John H.
TTY, contact (202) 502–8659. The
‘‘eFiling’’ link and the link to the User’s Clements, Van Ness Feldman, 1050
eLibrary link also provides access to the
Guide. Prepare your submission in the Jefferson Street NW., Washington, DC
texts of formal documents issued by the
same manner as you would if filing on 20007–3877, phone (202) 298–1800.
Commission, such as orders, notices,
paper and save it to a file on your hard i. FERC Contact: Robert Bell, (202)
and rulemakings.
drive. Before you can file comments you 502–6062.
In addition, the Commission now
mstockstill on PROD1PC66 with NOTICES

will need to create an account by j. Deadline for filing comments,


offers a free service called eSubscription
clicking on ‘‘Login to File’’ and then protests, and motions to intervene: 60
which allows you to keep track of all
‘‘New User Account.’’ You will be asked days from the issuance date of this
to select the type of filing you are 3 Interventions may also be filed electronically via notice.
making. This filing is considered a the Internet in lieu of paper. See previous All documents (original and eight
‘‘Comment on Filing.’’ discussion on filing comments electronically. copies) should be filed with: Kimberly

VerDate Aug<31>2005 23:48 Nov 08, 2007 Jkt 214001 PO 00000 Frm 00024 Fmt 4703 Sfmt 4703 E:\FR\FM\09NON1.SGM 09NON1