You are on page 1of 2

69206 Federal Register / Vol. 72, No.

235 / Friday, December 7, 2007 / Notices

protests or other comments filed, but with the Commission and is available generation of 385.440 gigawatt-hours
only those who file a motion to for public inspection: and be sold to a local utility.
intervene in accordance with the a. Type of Application: Preliminary l. Locations of Applications: A copy of
Commission’s Rules may become a Permit. the application is available for
party to the proceeding. Any comments, b. Project No.: 12925–000. inspection and reproduction at the
protests, or motions to intervene must c. Date filed: August 6, 2007. Commission in the Public Reference
be received on or before the specified d. Applicant: FFP Project 39, LLC. Room, located at 888 First Street NE.,
comment date for the particular e. Name of Project: Malone Field Room 2A, Washington DC 20426, or by
application. Light Project. calling (202) 502–8371. This filing may
Comments, protests and interventions f. Location: The project would be also be viewed on the Commission’s
may be filed electronically via the located in a section of the Mississippi Web site at http://www.ferc.gov using
Internet in lieu of paper; See 18 CFR River in Bolivar County, Mississippi the ‘‘eLibrary’’ link. Enter the docket
385.2001 (a)(1)(iii) and the instructions and Desha County, Arkansas. The number excluding the last three digits in
on the Commission’s Web site under ‘‘e- project uses no dam or impoundment. the docket number field to access the
filing’’ link. The Commission strongly g. Filed Pursuant to: Federal Power document. For assistance, call toll-free
encourages electronic filing. Act, 16 U.S.C. 791(a)—825(r). 1–866–208–3676 or e-mail
s. Filing and Service of Responsive h. Applicant Contacts: Mr. Daniel FERCOnlineSupport@ferc.gov. For TTY,
Documents—Any filings must bear in Irvin, FFP Project 39, LLC, 69 Bridge call (202) 502–8659. A copy is also
all capital letters the title Street, Manchester, MA 01944, phone available for inspection and
‘‘COMMENTS’’, (978) 232–3536, and Ms. Maureen reproduction at the address in item h
‘‘RECOMMENDATIONS FOR TERMS Winters, Project Manager, Devine above.
AND CONDITIONS’’, ‘‘PROTEST’’, m. Individuals desiring to be included
Tarbell & Associates, 970 Baxter
‘‘COMPETING APPLICATION’’ OR on the Commission’s mailing list should
Boulevard, Portland, ME 04103, phone
‘‘MOTION TO INTERVENE’’, as so indicate by writing to the Secretary
(207) 775–4495.
applicable, and the Project Number of of the Commission.
i. FERC Contact: Kelly Houff, (202) n. Competing Preliminary Permit—
the particular application to which the 502–6393.
filing refers. Any of the above-named Anyone desiring to file a competing
j. Deadline for filing comments, application for preliminary permit for a
documents must be filed by providing protests, and motions to intervene: 60
the original and the number of copies proposed project must submit the
days from the issuance date of this competing application itself, or a notice
provided by the Commission’s notice.
regulations to: The Secretary, Federal of intent to file such an application, to
All documents (original and eight the Commission on or before the
Energy Regulatory Commission, 888 copies) should be filed with: Kimberly
First Street, NE., Washington, DC 20426. specified comment date for the
D. Bose, Secretary, Federal Energy particular application (see 18 CFR 4.36).
A copy of any motion to intervene must Regulatory Commission, 888 First Submission of a timely notice of intent
also be served upon each representative Street, NE., Washington, DC 20426. allows an interested person to file the
of the Applicant specified in the Comments, protests, and interventions competing preliminary permit
particular application. may be filed electronically via the application no later than 30 days after
t. Agency Comments—Federal, state, Internet in lieu of paper; see 18 CFR the specified comment date for the
and local agencies are invited to file 385.2001(a)(1)(iii) and the instructions particular application. A competing
comments on the described application. on the Commission’s Web site under the preliminary permit application must
A copy of the application may be ‘‘e-Filing’’ link. The Commission conform with 18 CFR 4.30 and 4.36.
obtained by agencies directly from the strongly encourages electronic filings. o. Competing Development
Applicant. If an agency does not file Please include the project number (P– Application—Any qualified
comments within the time specified for 12925–000) on any comments or development applicant desiring to file a
filing comments, it will be presumed to motions filed. competing development application
have no comments. One copy of an The Commission’s Rules of Practice must submit to the Commission, on or
agency’s comments must also be sent to and Procedure require all intervenors before a specified comment date for the
the Applicant’s representatives. filing documents with the Commission particular application, either a
Kimberly D. Bose, to serve a copy of that document on competing development application or a
Secretary. each person in the official service list notice of intent to file such an
[FR Doc. E7–23777 Filed 12–6–07; 8:45 am] for the project. Further, if an intervenor application. Submission of a timely
files comments or documents with the notice of intent to file a development
BILLING CODE 6717–01–P
Commission relating to the merits of an application allows an interested person
issue that may affect the responsibilities to file the competing application no
DEPARTMENT OF ENERGY of a particular resource agency, they later than 120 days after the specified
must also serve a copy of the document comment date for the particular
Federal Energy Regulatory on that resource agency. application. A competing license
Commission k. Description of Project: The application must conform with 18 CFR
proposed project consists of: (1) 4,400 4.30 and 4.36.
[Project No. 12925–000]
proposed 20 kilowatt Free Flow p. Notice of Intent—A notice of intent
FFP Project 39, LLC; Notice of generating units having a total installed must specify the exact name, business
Application Accepted for Filing and capacity of 88 megawatts, (2) a proposed address, and telephone number of the
transmission line, (3) a mooring system prospective applicant, and must include
pwalker on PROD1PC71 with NOTICES

Soliciting Motions To Intervene,


Protests, and Comments comprised of either free standing pilings an unequivocal statement of intent to
or existing infrastructure which will submit, if such an application may be
November 30, 2007. anchor the units, and (4) appurtenant filed, either a preliminary permit
Take notice that the following facilities. The FFP Project 39, LLC, application or a development
hydroelectric application has been filed project would have an average annual application (specify which type of

VerDate Aug<31>2005 16:30 Dec 06, 2007 Jkt 214001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1
Federal Register / Vol. 72, No. 235 / Friday, December 7, 2007 / Notices 69207

application). A notice of intent must be filing comments, it will be presumed to 12926–000) on any comments or
served on the applicant(s) named in this have no comments. One copy of an motions filed.
public notice. agency’s comments must also be sent to The Commission’s Rules of Practice
q. Proposed Scope of Studies under the Applicant’s representatives. and Procedure require all intervenors
Permit—A preliminary permit, if issued, filing documents with the Commission
does not authorize construction. The Kimberly D. Bose, to serve a copy of that document on
term of the proposed preliminary permit Secretary. each person in the official service list
would be 36 months. The work [FR Doc. E7–23778 Filed 12–6–07; 8:45 am] for the project. Further, if an intervenor
proposed under the preliminary permit BILLING CODE 6717–01–P files comments or documents with the
would include economic analysis, Commission relating to the merits of an
preparation of preliminary engineering issue that may affect the responsibilities
plans, and a study of environmental DEPARTMENT OF ENERGY of a particular resource agency, they
impacts. Based on the results of these must also serve a copy of the document
studies, the Applicant would decide Federal Energy Regulatory on that resource agency.
whether to proceed with the preparation Commission k. Description of Project: The
of a development application to [Project No. 12926–000] proposed project consists of: (1) 2,400
construct and operate the project. proposed 20 kilowatt Free Flow
r. Comments, Protests, or Motions to FFP Project 38, LLC; Notice of generating units having a total installed
Intervene—Anyone may submit Application Accepted for Filing and capacity of 48 megawatts, (2) a proposed
comments, a protest, or a motion to Soliciting Motions To Intervene, transmission line, (3) a mooring system
intervene in accordance with the Protests, and Comments comprised of either free standing pilings
requirements of Rules of Practice and or existing infrastructure which will
Procedure, 18 CFR 385.210, .211, .214. November 30, 2007. anchor the units, and (4) appurtenant
In determining the appropriate action to Take notice that the following facilities. The FFP Project 38, LLC,
take, the Commission will consider all hydroelectric application has been filed project would have an average annual
protests or other comments filed, but with the Commission and is available generation of 210.240 gigawatt-hours
only those who file a motion to for public inspection: and be sold to a local utility.
intervene in accordance with the a. Type of Application: Preliminary l. Locations of Applications: A copy of
Commission’s Rules may become a Permit. the application is available for
party to the proceeding. Any comments, b. Project No.: 12926–000. inspection and reproduction at the
protests, or motions to intervene must c. Date filed: August 6, 2007. Commission in the Public Reference
be received on or before the specified d. Applicant: FFP Project 38, LLC. Room, located at 888 First Street, NE.,
comment date for the particular e. Name of Project: Walker Bend Room 2A, Washington, DC 20426, or by
application. Project. calling (202) 502–8371. This filing may
Comments, protests and interventions f. Location: The project would be also be viewed on the Commission’s
may be filed electronically via the located in a section of the Mississippi Web site at http://www.ferc.gov using
Internet in lieu of paper; See 18 CFR River in Washington County, the ‘‘eLibrary’’ link. Enter the docket
385.2001 (a)(1)(iii) and the instructions Mississippi and Chicot County, number excluding the last three digits in
on the Commission’s Web site under ‘‘e- Arkansas. The project uses no dam or the docket number field to access the
filing’’ link. The Commission strongly impoundment. document. For assistance, call toll-free
encourages electronic filing. g. Filed Pursuant to: Federal Power 1–866–208–3676 or e-mail
s. Filing and Service of Responsive Act, 16 U.S.C. 791(a)–825(r). FERCOnlineSupport@ferc.gov. For TTY,
Documents—Any filings must bear in h. Applicant Contacts: Mr. Daniel call (202) 502–8659. A copy is also
all capital letters the title Irvin, FFP Project 38, LLC, 69 Bridge available for inspection and
‘‘COMMENTS’’, Street, Manchester, MA 01944, phone reproduction at the address in item h
‘‘RECOMMENDATIONS FOR TERMS (978) 232–3536, and Ms. Maureen above.
AND CONDITIONS’’, ‘‘PROTEST’’, Winters, Project Manager, Devine m. Individuals desiring to be included
‘‘COMPETING APPLICATION’’ OR Tarbell & Associates, 970 Baxter on the Commission’s mailing list should
‘‘MOTION TO INTERVENE’’, as Boulevard, Portland, ME 04103, phone so indicate by writing to the Secretary
applicable, and the Project Number of (207) 775–4495. of the Commission.
the particular application to which the i. FERC Contact: Kelly Houff, (202) n. Competing Preliminary Permit—
filing refers. Any of the above-named 502–6393. Anyone desiring to file a competing
documents must be filed by providing j. Deadline for filing comments, application for preliminary permit for a
the original and the number of copies protests, and motions to intervene: 60 proposed project must submit the
provided by the Commission’s days from the issuance date of this competing application itself, or a notice
regulations to: The Secretary, Federal notice. of intent to file such an application, to
Energy Regulatory Commission, 888 All documents (original and eight the Commission on or before the
First Street, NE., Washington, DC 20426. copies) should be filed with: Kimberly specified comment date for the
A copy of any motion to intervene must D. Bose, Secretary, Federal Energy particular application (see 18 CFR 4.36).
also be served upon each representative Regulatory Commission, 888 First Submission of a timely notice of intent
of the Applicant specified in the Street, NE., Washington, DC 20426. allows an interested person to file the
particular application. Comments, protests, and interventions competing preliminary permit
t. Agency Comments—Federal, State, may be filed electronically via the application no later than 30 days after
and local agencies are invited to file Internet in lieu of paper; see 18 CFR the specified comment date for the
pwalker on PROD1PC71 with NOTICES

comments on the described application. 385.2001(a)(1)(iii) and the instructions particular application. A competing
A copy of the application may be on the Commission’s Web site under the preliminary permit application must
obtained by agencies directly from the ‘‘e-Filing’’ link. The Commission conform with 18 CFR 4.30 and 4.36.
Applicant. If an agency does not file strongly encourages electronic filings. o. Competing Development
comments within the time specified for Please include the project number (P– Application—Any qualified

VerDate Aug<31>2005 16:30 Dec 06, 2007 Jkt 214001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\07DEN1.SGM 07DEN1