Description of
Task / Activity:
Project Name:
Company:
Document Reference:
Associated JSA
Reference
Number
Attached
Yes
No
Prepared By:
Mechanical Engineer
Date:
05th July,2015
Mechanical Engineer
Date:
Position:
MEP Manager
Date:
DL Discipline
Engineer/Manager Review:
Bassam Alameer
Position:
MEP Manager
Date:
Position:
Discipline Engineer:
Position:
Contractor Project
Manager Review:
Date:
WPF Review:
Position:
DL/HSE/MS/0001
Date:
Rev. 01
METHOD STATEMENT
Key Plant and Tools
Required:
Key Materials
Required:
Paint
(ie: access platforms/winches/ladders etc)
Other Essential
Equipment:
Specific Identified
Residual Hazards:
(or refer to the task
specific risk
assessment(s))
Temporary Supports
and Props needed to
facilitate the works:
WORKING AT HEIGHT
NONE
LADDERS
SCAFFOLDS
SAFETY HARNESS
Hazardous
Substances:
(Attach COSHH Assessments
and MSDS)
Applicable:
Very Toxic
Harmful/
Irritant
Corrosive
Dangerous
for the
environment
Oxidising
Highly
flammable
Explosive
No
Yes
No
Yes
Yes
Yes
No
(Detail any limits on the loadings applicable to temporary plant/equipment or fixed elements of the structure
where the work is taking place.)
SWL's:
DL/HSE/MS/0001
Rev. 01
METHOD STATEMENT
OTHER:
1: Coveralls
2: Gas Detector
3: Gas Mask/Hood
Required Personnel
Protective Equip.:
Safety
Boots
Hard Hats
High
Visibility
Welder
Shield
Safety
Gloves
Hearing
Protection
Respiratory
Protection
Eye
Protection
Face Shield
Fall Arrest
Disposable
Mask
Goggles
Emergency
Procedures:
ABBAS
1) All work will be undertaken by qualified competent persons with experience of the
type of work described above, and in all cases in full accordance with safety
procedures specified.
RESPONSIBILITIES
2) It is the responsibility of the supervisor to ensure prior to giving any personnel the
job of Painting that they are fully aware of the hazards involved and are
competent to carry out the work safely.
3) The supervisor must ensure that this procedure is fully complied with.
DL/HSE/MS/0001
Rev. 01
METHOD STATEMENT
1) Ensure the surface is free from any grease and dust prior to application of
painting.
2) Paint/ Primer to properly mixed in a steel pail separately.
3) Apply the primer by means of paint roller/ brush to as many as coat to
achieve the thickness.
4) Allow the painted surface to fully cue as per the painting procedure and
project specification.
5) Carry out the second coat and final coat painting as per approved project
specification.
6) After the completion of Final Inspection remove ladders and scaffolds for the
work area.
7) Remove all the debris and garnet spillage from the work spot
8) All the tools from the work area to be removed and area to be thoroughly
Sequence of
Operations:
(Specifying methods of
working, tools, materials and
equipment utilised)
DL/HSE/MS/0001
Rev. 01
METHOD STATEMENT
METHOD STATEMENT ACCEPTANCE FORM
TITLE
DATE
TRADE
NAME
PRINT
SIGNATURE
DL/HSE/MS/0001
Rev. 01