You are on page 1of 9

LIST OF OISD STANDARDS (October 2013)

Sr. No.

OISD Standard/GDN/RP No
1 OISD-STD-105
2 OISD-STD-106
3 OISD-RP-108
4 OISD-STD-109
5 OISD-RP-110
6 OISD-STD-111
7 OISD-STD-112
8 OISD-STD-113
9 OISD-STD-114
10 OISD-GDN-115
11 OISD-STD-116
12 OISD-STD-117
13 OISD-STD-118
14 OISD-STD-119
15 OISD-STD-120
16 OISD-STD-121
17 OISD-RP-122
18 OISD-RP-123
19 OISD-RP-124
20 OISD-STD-125
21 OISD-RP-126
22 OISD-STD-127
23 OISD-STD-128
24 OISD-STD-129
25 OISD-STD-130
26 OISD-STD-131
27 OISD-STD-132
28 OISD-STD-133
29 OISD-STD-134
30 OISD-STD-135
31 OISD-STD-137
32 OISD-STD-139
33 OISD-STD-140
34 OISD-STD-141
35 OISD-STD-142
36 OISD-STD-144
37 OISD-GDN-145
38 OISD-RP-146
39 OISD-RP-147
40 OISD-RP-148
41 OISD-RP-149

42 OISD-STD-150
43 OISD-STD-151
44 OISD-STD-152
45 OISD-STD-153
46 OISD-STD-154
47 OISD-STD-155 (Part I)
47 OISD-STD-155 (Part II)
48 OISD-STD-156
49 OISD-RP-157
50 OISD-RP-158
51 OISD-STD-159
52 OISD-STD-160
53 OISD-GDN-161
54 OISD-STD-162
55 OISD-STD-163
56 OISD-STD-164
57 OISD-GDN-165
58 OISD-GDN-166
59 OISD-RP-167
60 OISD-GDN-168
61 OISD-GDN-169
62 OISD-STD-170
63 OISD-STD-171
64 OISD-STD-173
65 OISD-RP-174
66 OISD-STD-175
67 OISD-STD-176
68 OISD-STD-177
69 OISD-GDN-178
70 OISD-STD-179
71 OISD-GDN-180
72 OISD-STD-181
73 OISD-GDN-182
74 OISD-STD-183
75 OISD-STD-184
76 OISD-STD-185
77 OISD-GDN-186
78 OISD-STD-187
79 OISD-STD-188
80 OISD-STD-189
81 OISD-STD-190
82 OISD-STD-191
83 OISD-GDN-192
84 OISD-GDN-193
85 OISD-STD-194

86 OISD-STD-195
87 OISD-GDN-196
88 OISD-GDN-197
89 OISD-GDN-199
90 OISD-GDN-200
91 OISD-RP-201
92 OISD-GDN-202
93 OISD-GDN-203
94 OISD-GDN-204
95 OISD-RP-205
96 OISD-GDN-206
97 OISD-GDN-207
98 OISD-STD-210
99 OISD-GDN-211
100 OISD-GDN-212
101 OISD-STD-214
102 OISD-STD-216
103 OISD-GDN-218
104 OISD-GDN-219
105 OISD-GDN-224
106 OISD-STD-225
107 OISD-STD-226
108 OISD-GDN-227
109 OISD-GDN-228
110 OISD-STD-230
111 OISD-STD-231
112 OISD-GDN-232
113 OISD-GDN-233

STANDARD NAME
Work Permit System
Pressure Relief & Disposal System
Recommended Practices on Oil Storage and Handling
Process Design and Operating Philosophies on Blow Down & sewer system
Recommended Practices on Static Electricity
Process Design & Operating Philosophies on Fired Process Furnace
Safe Handling of Air Hydrocarbon Mixtures & Pyrophoric Substances
Classification of Area for Electrical Installations at Hydrocarbon Processing & Handling Facilities
Safe Handling of Hazardous Chemicals
Guidelines on Fire Fighting Equipment and Appliances in Petroleum Industry
Fire Protection Facilities for Petroleum Refineries and Oil/Gas Processing Plants
Fire Protection Facilities for Petroleum Depots, Terminals, Pipeline Installations & Lube oil installations
Layouts for Oil and Gas Installations
Selection, Operation and Maintenance of Pumps
Selection, Operation and Maintenance of Compressors
Selection, Operation Inspection & Maintenance of Steam & Gas Turbines
Selection, Operation and Maintenance of Fans, Blowers, Gear Boxes, Agitators & Mixers
Selection, Operation and Maintenance of Rotary Equipment Components
Predictive Maintenance Practices
Inspection & Maintenance of Mechanical Seals
Specific practices for installations and maintenance of Rotating Equipment
Selection, Operation, Inspection & Maintenance of Diesel Engines
Inspection of Unfired Pressure Vessels
Inspection of Storage Tanks
Inspection of Piping Systems
Inspection of Boilers
Inspection of Pressure Relieving devices
Inspection of Fired Heaters
Inspection of Heat Exchangers
Inspection of Loading & Unloading hoses for Petroleum Products
Inspection of Electrical Equipment
Inspection of pipelines Offshore
Inspection of jetty pipelines
Design and Construction requirements for cross country hydrocarbon pipelines
Inspection of fire fighting equipments and systems
Liquefied Petroleum Gas (LPG) Installations
Guidelines on Internal Safety Audits (Procedures and Checklist)
Preservation of idle electrical equipment
Inspection & safe practices during electrical installations
Inspection & safe practices during overhauling electrical equipment
Design aspects for safety in electrical systems

Design and Safety Requirements For Liquefied Petroleum Gas Mounded Storage Facility
Safety in Design, Fabrication and Fittings : Propane Tank Trucks
Safety Instrumentation for Process System in Hydrocarbon Industry
Maintenance & inspection of safety instrumentation in hydrocarbon industry
Safety aspects in Functional Training
(Part-I Non Respiratory Equipment)
(Part II Respiratory Equipment)
Fire Protection Facilities for Ports Handling Hydrocarbons
Recommended Practice for Transportation of Bulk Petroleum Products
Recommended Practices on Storage and Handling of Bulk Liquefied Petroleum Gas
LPG Tank Trucks - Requirements of Safety on Design/Fabrication & Fittings
Protection to fittings mounted on existing LPG tank trucks
LPG Tank Truck Incidents : Rescue & Relief Operations
Safety in installation and maintenance of LPG Cylinders Manifold
Process Control Room Safety
Fire Proofing in Oil & Gas Industry
Guidelines for Rescue & Relief Operations for POL Tank Truck Accident
Guidelines for Occupational Health Monitoring in Oil and Gas Industry
POL Tank lorry Design & Safety
Emergency Preparedness Plan for Marketing Locations of Oil Industry
OISD Guidelines on Small LPG Bottling Plants (Design and Fire Protection facilities)
Inspection, Maintenance, Repairs & Rehabilitation of Foundations & Structures
Preservation of Idle Static & Rotary Mechanical Equipment
Fire Prevention and Protection System for Electrical Installations
Well Control
Cementing Operations
Safety Health & Environment Training For Exploration & Production (Upstream) Personnel
Inspection & Maintenance of Thermal Insulation
Guidelines on Management Of Change
Safety Requirements On Compression,Storage, Handling & Refueling Of Natural Gas For Use In Autom
Lightning Protection
Geophysical Operations
Safe Practices for Workover and Well Stimulation Operations
Standard on Logging Operations
Standard on Replacement of Personal Protective Equipment & Life Saving Appliances
Wire Line Operations
Simultaneous Operations in E&P Industry
Care And Use Of Wire Rope
Corrosion Monitoring Of Offshore & Onshore Pipelines
Standard On Fire Fighting Equipment For Drilling Rigs, Work Over Rigs And Production Installations
Derrick Floor Operations (Onshore Drilling / Workover Rigs)
Oil Field Explosive Safety
Safety Practices during Construction
Guidelines for Gas Lift Operations & Maintenance
Standard for Storage & Handling Of Liquefied Natural Gas (LNG)

Safety in Design, Operation, Inspection and Maintenance of Hydrocarbon Gas Compressor Stations an
Guidelines for Seeking Environmental Clearance of Development Projects in Petroleum Industry
Guidelines for Environmental Impact Assessment
Guidelines For Conducting Environmental Audit In Upstream Petroleum Sector (Onland)
Guidelines For Preparation Of Oil Spill Response Contingency Plan
Environment Management in E&P Sector
Inspection of Drilling and Workover Rig Mast / Sub-Structure
Operation, Maintenance & Inspection Of Hoisting Equipment
Medical Requirements, Emergency Evacuation And Facilities (for Upstream)
Crane Operation, Maintenance & Testing (for Upstream)
Guidelines on Safety Management System in Petroleum Industry
Contractor Safety
Storage, Handling and Refueling of LPG for automotive use
Safety in Petroleum Laboratories
Guidelines on Environmental Audit in Downstream Petroleum Sector
Cross Country LPG Pipelines
Electrical Safety in Onshore Drilling & Workover Rigs
Guidelines For Safe Rig- Up & Rig- Down Of Drilling And Work-Over Rigs
Guidelines on Field Inspection, Handling & Testing of Casing Pipe & Tubing
Monitoring & Control of Volatile Organic Compounds Emission
Storage, Handling & Dispensing at Petroleum Retail Outlets
Natural Gas Transmission Pipelines and City Gas Distribution Networks
Emergency Response and Preparedness in E&P Industry
Selection, Training & Placement of Fire Operators in Hydrocarbon & Petrochemical Industry
Unlined Underground Rock Cavern Storage for Petroleum & Liquefied Petroleum Gas
Sucker Rod Pumping Units
Identification of hazards and control measures in E&P industry
Guidelines on inspection of Nonpiggable pipelines.

CURRENT EDITION IN VOGUE


4-Sep
10-Oct
Jul-97
Aug-99(Under Revision)
Aug-99
Aug-99(Under Revision)
2-Oct
13-Oct
10-Oct
Jul-00
12-Jul
12-Jul
8-Jul
8-Jul
8-Jul
10-Oct
8-Jul
8-Jul
7-Aug
7-Aug
7-Aug
10-Oct
10-Oct
6-Nov
8-Jul
Aug-99
12-Jul
Aug-00(Under Revision)
10-Oct
1-Sep
Oct-10(Under Revision)
Sep-01(Under Revision)
1-Sep
12-Jul
1-Sep
8-Jul
1-Sep
Aug-00
2-Oct
Aug-00
13-Oct

8-Jul
Jul-99
10-Oct
Sep-01(Under Revision)
1-Sep
10-Oct
Jul-95
5-Oct
Sep-96
Aug-00
2-Oct
Aug-93
3-Mar
Jul-95
4-Sep
12-Jul
Jul-99
12-Jul
Jul-97
Jul-97
8-Jul
Jul-97
Jul-98
3-Sep
8-Jul
Jul-08(Under Revision)
3-Sep
Jun-98
Jul-99
Jul-98
Jul-99
10-Oct
10-Oct
13-Oct
Aug-00
2-Oct
2008
Aug-00
Aug-00
12-Jul
Aug-00(Under Revision)
Aug-00
Jul-00
1-Sep
Aug-00(Under Revision)

1-Sep
1-Sep
1-Sep
Aug-00
2-Oct
8-Jul
Oct-02(Under Revision)
3-Sep
1-Sep
2-Oct
1-Sep
2-Oct
10-Oct
3-Sep
2-Oct
13-Oct
10-Oct
4-Oct
4-Oct
6-Nov
10-Oct
10-Oct
7-Aug
8-Jul
8-Jul
8-Jul
13-Oct
13-Oct

You might also like