You are on page 1of 18

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Power Transmission and Distribution

Communication in Substations with IEC 61850


Reverse Interlocking
Markus Spangler, Siemens AG, PTD EA 13

02/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

7SJ64
2

Blocking
t=100ms
t=900ms

Load flow

Device_A

7SJ64

7SJ64

7SJ64

t=300ms
Pick up

t=600ms
Pick up

t=600ms
Pick up

Device_C

Device_B

Fault in the outgoing unit, the protection device next to the fault excites and trips and

1 blocks the protection of the incoming unit

Fault on the busbar. In the outgoing unit, no protection devices are excited and can

2 thus not block the protection device in the incoming unit, the protection device in the
incoming unit trips in first-zone time with I>> in 100 ms.
05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Switch

Outgoing
unit 2
Device C

Outgoing
unit 1
Device B

Incoming
unit
Device A

05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Allocating the pick up-information in the outgoing unit 1


(Device B) and outgoing unit 2 (Device C) to the system interface

System interface
S / X as the
destination of the
allocation
Information of this
logical node is preallocated to the
column S.
Further user-defined
SIPROTEC objects
can be allocated to the column X.
Allocating I> picked up to the destination S / X
05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Generating internal signals for the reverse interlocking in the


incoming unit (Device A)

Creating two userdefined information


which are received
by the system
interface (Type
ExSP).

05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Generating internal signals for the reverse interlocking in the


incoming unit (Device A)

Defining the object


properties of these two ExSPindications

05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Generating internal signals for the reverse interlocking in the


incoming unit (Device A)

Further processing
of the information
in the CFC
05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Generating internal signals for the reverse interlocking in the


incoming unit (Device A)

Identifying the
CFC as the source
for the information.
05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Insert a new CFC-Chart Reverse Interlocking

05/2007

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Interconnecting the pick up-information of the


outgoing units B and C in the CFC

Please make sure that the fast flow level PLC_BEARB is used.

05/2007

10

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Do not forget to carry out the protection parameterization

DMT (definite time


overcurrent-time
relay) setting for the
incoming unit
Device A

05/2007

11

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

DMT (definite time


overcurrent-time
relay) setting for
the outgoing
units B and C

05/2007

12

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Insert a new GOOSE-Application for reverse interlocking

05/2007

13

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Define the properties/description of the new GOOSE-Application


and the priority..
05/2007

14

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Interconnection in the IEC61850 station

05/2007

15

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Updating the IEC61850 station

05/2007

16

Power Transmission and Distribution

Reverse Interlocking
Power Automation

Progress. Its that simple.

Task:
Create the reverse interlocking for 2 devices in the outgoing unit (Devices
B/C) and for 1 device (Device A) in the incoming unit via the IEC61850
station
Proceed as follows:
1.
2.
3.
4.
5.
6.

Create device parameter sets


Parameterize off-line: Select the information in the individual devices
Save the parameter sets
Create the IEC station
Select the users
In the IEC station: Set the IP addresses and interconnect the device
information
7. Save and update the IEC station
8. Initialize the protection devices
9. With testing equipment: Simulate faults within / outside the busbar
10. Check the reaction in the incoming unit
05/2007

17

Power Transmission and Distribution

Power Automation

Progress. Its that simple.

Thank you very much for your attention.

05/2007