Professional Documents
Culture Documents
be fulfilled through the programmatic Crisp County Power Commission, as consultations to develop the
agreement, which the Commission licensee for Lake Blackshear programmatic agreement.
proposes to draft in consultation with Hydroelectric Project No. 659, the For purposes of commenting on the
certain parties listed below. The Alabama-Quassarte Tribal Town, and programmatic agreement, we propose to
executed programmatic agreement the Seminole Tribe of Florida have restrict the service list for the
would be incorporated into any Order expressed an interest in this preceding
aforementioned project as follows:
issuing a license. and are invited to participate in
Don Klima or Representative, Advisory Council on Historic Preserva- Tim Bachelder, Devine Tarbell & Associates, 970 Baxter Boulevard,
tion, The Old Post Office Building, Suite 803, 1100 Pennsylvania Av- Portland, ME 04103.
enue, NW., Washington, DC 20004.
Steve Rentfrow, Manager or Representative, Crisp County Power Com- Elizabeth Shirk or Representative, Georgia Department of Natural Re-
mission, 202 7th Street South, P.O. Box 1218, Cordele, GA 31010. sources, Historic Preservation Division, 34 Peachtree Street, NW.,
Suite 1600, Atlanta, GA 30303–2316.
Willard Steele, Seminole Tribe of Florida, Ah-Tah-Thi-Ki Museum, HC Augustine Asbury, Alabama-Quassarte Tribal Town, P.O. Box 187,
61, Box 21 A, Clewiston, FL 33440. Wetumka, OK 74883.
Any person on the official service list DEPARTMENT OF ENERGY and to encourage them to comment on
for the above-captioned proceeding may their areas of concern.
request inclusion on the restricted Federal Energy Regulatory A fact sheet prepared by the FERC
service list, or may request that a Commission
entitled ‘‘An Interstate Natural Gas
restricted service list not be established, Facility On My Land? What Do I Need
by filing a motion to that effect within [Docket No. CP08–45–000] To Know?’’ addresses a number of
15 days of this notice date. In a request typically asked questions, including the
for inclusion, please identify the Dominion Transmission Incorporation;
use of eminent domain and how to
reason(s) why there is an interest to be Notice of Intent To Prepare an
participate in the Commission’s
included. Also please identify any Environmental Assessment for the
proceedings. It is available for viewing
Proposed Utica 7 Project and Request
concerns about historic properties, on the FERC Internet Web site (http://
for Comments on Environmental
including Traditional Cultural www.ferc.gov).
Issues
Properties. If historic properties are to
Summary of the Proposed Project
be identified within the motion, please January 24, 2008.
use a separate page, and label it NON- The staff of the Federal Energy DTI proposes to install an additional
PUBLIC Information. Regulatory Commission (FERC or compressor unit at its existing Utica
An original and 8 copies of any such Commission) will prepare an Compressor Station to provide new firm
motion must be filed with Kimberly D. environmental assessment (EA) that will transportation service for a new
Bose, the Secretary of the Commission discuss the environmental impacts of customer while maintaining reliability
(888 First Street, NE., Washington, DC the Dominion Transmission in meeting all existing service
20426) and must be served on each Incorporation (DTI) Project involving entitlement on the northeastern portion
person whose name appears on the the addition of a compressor unit at its of DTI’s transmission system. The
existing Utica Compressor Stations, project would be located in New
official service list. Please put the
located at New Hartford, Herkimer Harford, Herkimer County, New York.
project name ‘‘Lake Blackshear Project’’
County, New York. The EA will be used Modification of the Utica Compressor
and number ‘‘P–659–014’’ on the front
by the Commission in its decision- Station will include the installation of:
cover of any motion. Motions may be making process to determine whether
filed electronically via the Internet in • One natural gas-fired, reciprocating
the project is in the public convenience
lieu of paper. The Commission strongly internal combustion engine with a
and necessity.
encourages electronic filings. See 18 nominal 2,250 HP rating.
This notice announces the opening of
CFR 385.2001(a)(1)(iii) and the the scoping process the Commission All project activities would be
instructions on the Commission’s Web will use to gather input from the public contained within the property boundary
site (http://www.ferc.gov) under the ‘‘e- and interested agencies on the project. for DTI’s Utica Compressor Station.
Filing’’ link. Your input will help determine which Approximately five acres of this facility
If no such motions are filed, the issues need to be evaluated in the EA. would be utilized for project activities.
restricted service list will be effective at Please note that the scoping period will The general location of the proposed
the end of the 15-day period. Otherwise, close on February 25, 2008. Details on facilities is shown in Appendix 1.1
a further notice will be issued ruling on how to submit comments are provided
any motion or motions filed within the in the Public Participation section of 1 The appendices referenced in this notice are not
15-day period. this notice. being printed in the Federal Register. Copies of all
This notice is being sent to affected appendices are available on the Commission’s Web
Kimberly D. Bose, site at the ‘‘eLibrary’’ link or from the Commission’s
landowners; federal, state, and local Public Reference Room, 888 First Street, NE.,
mstockstill on PROD1PC66 with NOTICES
Secretary. government agencies; elected officials; Washington, DC 20426, or call (202) 502–8371. For
[FR Doc. E8–1637 Filed 1–29–08; 8:45 am] Native American tribes; other interested instructions on connecting to eLibrary refer to the
parties; and local libraries and ‘‘Additional Information’’ section of this notice.
BILLING CODE 6717–01–P Copies of the appendices were sent to all those
newspapers. State and local government receiving this notice in the mail. Requests for
representatives are asked to notify their detailed maps of the proposed facilities should be
constituents of this proposed project made directly to El Paso.
VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00051 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices 5545
comment. If you are interested in Number field. Be sure you have selected
and local agencies, public interest
receiving it, please return the an appropriate date range. For
groups, interested individuals, affected
Information Request (Appendix 2). If assistance, please contact FERC Online
2 ‘‘We,’’ ‘‘us,’’ and ‘‘our’’ refer to the you do not return the Information Support at FercOnlineSupport@ferc.gov
environmental staff of the FERC’s Office of Energy Request, you will be taken off the or toll free at 1–866–208–3676, or for
Projects. mailing list. TTY, contact (202) 502–8659. The
VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00052 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1
5546 Federal Register / Vol. 73, No. 20 / Wednesday, January 30, 2008 / Notices
eLibrary link also provides access to the information necessary in order to project should submit an original and
texts of formal documents issued by the complete the draft EIS. two copies of their comments to the
Commission, such as orders, notices, Any questions regarding this Secretary of the Commission.
and rulemakings. application should be directed to Robert Environmental commenters will be
In addition, the Commission now Wyatt, Downeast LNG, Inc., PO Box 865, placed on the Commission’s
offers a free service called eSubscription Calais, ME 04619 or Lisa M. Tonery, environmental mailing list, will receive
which allows you to keep track of all Fulbright & Jaworski, 666 Fifth Avenue, copies of the environmental documents,
formal issuances and submittals in New York, NY 10103–3198, (212) 318– and will be notified of meetings
specific dockets. This can reduce the 3009. associated with the Commission’s
amount of time you spend researching This filing is available for review at environmental review process.
proceedings by automatically providing the Commission’s Washington, DC Environmental commenters will not be
you with notification of these filings, office or may be viewed on the required to serve copies of filed
document summaries and direct links to Commission’s Web site at http:// documents on all other parties.
the documents. Go to http:// www.ferc.gov/ using the ‘‘e-Library’’ However, the non-party commenters
www.ferc.gov/esubscribenow.htm. link. Enter the docket number, will not receive copies of all documents
Finally, public meetings or site visits excluding the last three digits, in the filed by other parties or issued by the
will be posted on the Commission’s docket number field to access the Commission (except for the mailing of
calendar located at http://www.ferc.gov/ document. For assistance, please contact environmental documents issued by the
EventCalendar/EventsList.aspx along FERC Online Support at Commission) and will not have the right
with other related information. ferconlinesupport@ferc.gov or to seek court review of the
Telephone: 202–502–6652; Toll-free: 1– Commission’s final order.
Kimberly D. Bose, 866–208–3676; or for TTY, contact (202) Protests and interventions may be
Secretary. 502–8659. filed electronically via the Internet in
[FR Doc. E8–1622 Filed 1–29–08; 8:45 am] There are two ways to become lieu of paper; see 18 CFR
BILLING CODE 6717–01–P involved in the Commission’s review of 285.2001(a)(1)(iii) and the instructions
this Project. First, any person wishing to on the Commission’s Web site under the
obtain legal status by becoming a party ‘‘e-filing’’ link. The Commission
DEPARTMENT OF ENERGY to the proceeding for this project should
strongly encourages electronic filings.
file with the Federal Energy Regulatory Comment Date: February 21, 2008.
Federal Energy Regulatory Commission, 888 First Street, NE.,
Commission Washington, DC 20426, a motion to Kimberly D. Bose,
intervene in accordance with the Secretary.
[Docket No. CP07–53–001] requirements of the Commission’s Rules [FR Doc. E8–1621 Filed 1–29–08; 8:45 am]
of Practice and Procedure (18 CFR BILLING CODE 6717–01–P
Downeast Pipeline, LLC; Notice of 385.214 or 385.211) and the Regulations
Amendment under the NGA (18 CFR 157.10) by the
comment date, below. A person DEPARTMENT OF ENERGY
January 24, 2007. obtaining party status will be placed on
Take notice that on January 16, 2007, the service list maintained by the Federal Energy Regulatory
Downeast Pipeline, LLC (Downeast Secretary of the Commission and will Commission
Pipeline), PO Box 865, Calais, Maine receive copies of all documents filed by
04619, filed, in Docket No. CP07–53– [Docket Nos. ER07–1249–000, ER07–1249–
the applicant and by all other parties. A 001, ER07–1249–002, ER07–1249–003]
001, an application to amend its party must submit 14 copies of filings
pending application for a Certificate of made with the Commission and must Lockport Energy Associates, L.P.;
Public Convenience and Necessity mail a copy to the applicant and to Notice of Issuance of Order
pursuant to section 7(c) of the Natural every other party in the proceeding.
Gas Act (NGA) filed with the Only parties to the proceeding can ask January 23, 2008.
Commission on December 22, 2006. for court review of Commission orders Lockport Energy Associates, L.P.
Downeast Pipeline proposes to amend in the proceeding. (Lockport) filed an application for
its application to reflect a modification However, a person does not have to market-based rate authority, with an
to its originally proposed pipeline route intervene to have comments considered. accompanying rate schedule. The
in order to avoid crossing the The second way to participate is by proposed market-based rate schedule
Moosehorn National Wildlife Refuge filing with the Secretary of the provides for the sale of energy, capacity
which is owned and managed by the Commission, as soon as possible, an and ancillary services at market-based
U.S. Fish and Wildlife Service. The original and two copies of comments in rates. Lockport also requested waivers of
modification proposed by Downeast support of or in opposition to this various Commission regulations. In
Pipeline affects 7.5 miles of the project and/or associated pipeline. The particular, Lockport requested that the
originally proposed 31-mile-long route Commission will consider these Commission grant blanket approval
and extends from milepost 10.2 to comments in determining the under 18 CFR part 34 of all future
milepost 17.7, all as more fully set forth appropriate action to be taken, but the issuances of securities and assumptions
in the application which is on file with filing of a comment alone will not serve of liability by Lockport.
the Commission and open to public to make the filer a party to the On January 23, 2008, pursuant to
inspection. The Commission staff will proceeding. The Commission’s rules delegated authority, the Director,
mstockstill on PROD1PC66 with NOTICES
determine if this amendment will have require that persons filing comments in Division of Tariffs and Market
an effect on the schedule for the opposition to the project provide copies Development—West, granted the
environmental review of this project. A of their protests only to the party or requests for blanket approval under part
Notice of Schedule for Environmental parties directly involved in the protest. 34 (Director’s Order). The Director’s
Review will be issued when Persons who wish to comment only Order also stated that the Commission
Commission staff has received all the on the environmental review of this would publish a separate notice in the
VerDate Aug<31>2005 18:49 Jan 29, 2008 Jkt 214001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\30JAN1.SGM 30JAN1