Lifting Lug Calculation

Horizontal lifting
Project Name :
NCPOC
Project No :
836
Tag Number :
Bio Tank
Date :
2/6/2013
Material of Lifting/Tailing Lug
Minimum specified yield strength

M = SA 516 70
y = 262

N/mm2

Thickness of Lug
Width Lug
Lug outer radius
Diameter lug hole
Height from lug base to hole center
Effective moment arm height
Fillet weld leg

T
B
R
D
H
h
FW

=
=
=
=
=
=
=

32 mm
120 mm
60 mm
40 mm
139 mm
50 mm
15 mm

Partial Groove weld


Critical weld size
Joint efficiency
Cheek Plate Thickness
Cheek Plate OD

GW =
CW=
E=
T2 =
D2 =

0 mm
15.00 mm
1
0 mm
0 mm

Erection weight,
Impact factor,
Design weight, Wd = C*We
Number of lugs,
Design weight per lug,
Lifting angle,

We
C
Wd
N
W

Tension in sling,
Force,

Ft
Fx
Fy
Fz

=
=
=
=

W / Sin
Ft*Cos
Ft*Sin
0.05*Ft

=
=
=
=
=
=
=
=
=
=

19000 kg
4.00
76000 kg
4
19000 kg
60 deg.
215159
107579
186333
10758

N
N
N
N

Build up of impact factor 4.0


Factor of safety =
60/40 spread for sling length =
Allowance for overweight =
Sump of impact factor =

Stresses on lug Calculations


1) Shear Stress at lug eye
Sse = Ft/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
84.05
N/mm2
<
Stress result is PASS

104.80
0.4*Sy

N/mm2

2) Tensile Stress at Lug eye


Ste = Fy/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
72.79
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

Lug Section Modulus (Out Plane)


(B^2 x T)/6

Zo

3) Bending Stress Outplane


Sbo = Fx x (h)/Zo
=
70.04
<
Stress result is PASS
Lug Section Modulus (Out Plane)
(T^2 x B)/6

76800 mm3

157.20
0.6*Sy

Zi

N/mm2

20480 mm3

4) Bending Stress Inplane


Sbo = Fz x h/Zi
=
26.26
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

5) Tensile Stress at lug base


Stb = Fs / B*T
=
56.03
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

6) Shear Stress at lug base


Ssb = Fx / B*T
=
28.02
<
Stress result is PASS

104.80
0.4*Sy

N/mm2

172.92
0.66*Sy

N/mm2

7) Combined Stress
=

80.47
<
Stress result is PASS

Stresses on weld calculations


1) Bending from force Fx
Zw= CW*B^2/3
=
72000 mm3
Aw= (2*CW*B)+(4*CW*(H-h))
=
8940.00 mm2
Swbx = (Fx*h) / Zw
=
74.71
<
Stress result is PASS

157.20
E*0.6*Sy

N/mm2

2) Shear from force Fx


Swsx = (Fx / Aw) / E
=
12.03
<
Stress result is PASS

104.80
E*0.4*Sy

N/mm2

3) Combined Shear and Bending from force Fx


Swx = Sqrt (Swbx^2 + Swsx^2)
=
75.67
<
Stress result is PASS

172.92
E*0.66*Sy

N/mm2

104.80
E*0.4*Sy

N/mm2

172.92
E*0.66*Sy

N/mm2

4) Shear from force Fy


Swsy = (Fy/Aw)
=
20.84
<
Stress result is PASS
5) Combined stress due to Fx and Fy
Swxy = SQRT[(Swsx+Swsy)^2+Swbx^2]
=
78.49
<
Stress result is PASS

factor 4.0
3
1.2
1.1 (10%)
3.96
4

Lifting Lug Calculation on skid base


Vertical lifting
Project Name :
HY7-1/7-IN(CX-N) OFFSHORE GAS FIELD DEVELOPMENT
Project No :
849
Tag Number :
MEG SURGE DRUM SKID
Date :
5/29/2013
Material of Lifting/Tailing Lug
Minimum specified yield strength

M = SS 400
y = 248

Thickness of Lug
Width Lug
Lug outer radius
Diameter lug hole
Height from lug base to hole center
Effective moment arm height
Fillet weld leg

T
B
R
D
H
h
FW

=
=
=
=
=
=
=

35
200
68
45
387
151
10

Partial Groove weld


Critical weld size
Joint efficiency
Cheek Plate Thickness
Cheek Plate OD

GW =
CW=
E=
T2 =
D2 =

10
17.07
1
0
0

Erection weight,
Impact factor,
Design weight, Wd = C*We
Number of lugs,
Design weight per lug,
Lifting angle,

We
C
Wd
N
W

Tension in sling,
Force,

Ft
Fx
Fy
Fz

=
=
=
=

W / Sin
Ft*Cos
Ft*Sin
0.05*Ft

=
=
=
=
=
=
=
=
=
=

23000
3.00
69000
4
17250
60
195342
97671
169171
9767

Stresses on lug Calculations


1) Shear Stress at lug eye
Sse = Ft/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
61.33
N/mm2
<
Stress result is PASS

99.20
0.4*Sy

2) Tensile Stress at Lug eye


Ste = Fy/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
53.11
<
Stress result is PASS

148.80
0.6*Sy

Lug Section Modulus (Out Plane)


(B^2 x T)/6

Zo

3) Bending Stress Outplane


Sbo = Fx x (h)/Zo
=
63.21
<
Stress result is PASS
Lug Section Modulus (Out Plane)
(T^2 x B)/6

233333.333333

148.80
0.6*Sy

Zi

40833.3333333

4) Bending Stress Inplane


Sbo = Fz x h/Zi
=
36.12
<
Stress result is PASS

148.80
0.6*Sy

5) Tensile Stress at lug base


Stb = Fs / B*T
=
27.91
<
Stress result is PASS

148.80
0.6*Sy

6) Shear Stress at lug base


Ssb = Fx / B*T
=
13.95
<
Stress result is PASS

99.20
0.4*Sy

7) Combined Stress
=

59.95
<
Stress result is PASS

163.68
0.66*Sy

Stresses on weld calculations


1) Bending from force Fx
Zw= CW*B^2/3
=
227614.24 mm3
Aw= (2*CW*B)+(4*CW*(H-h))
=
22943.52 mm2
Swbx = (Fx*h) / Zw
=
64.80
<
Stress result is PASS

148.80
E*0.6*Sy

2) Shear from force Fx


Swsx = (Fx / Aw) / E
=
4.26
<
Stress result is PASS

99.20
E*0.4*Sy

3) Combined Shear and Bending from force Fx


Swx = Sqrt (Swbx^2 + Swsx^2)
=
64.93
<
Stress result is PASS

163.68
E*0.66*Sy

4) Shear from force Fy


Swsy = (Fy/Aw)
=

7.37
<
Stress result is PASS

99.20
E*0.4*Sy

5) Combined stress due to Fx and Fy


Swxy = SQRT[(Swsx+Swsy)^2+Swbx^2]
=
65.35
<
Stress result is PASS

163.68
E*0.66*Sy

N/mm2
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

kg
kg
kg
deg.
N
N
N
N

N/mm2

N/mm2

mm3

N/mm2

mm3

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

Lifting Lug Calculation (Typical for all 3 units STHE)


Vertical lifting
Project Name :
RECOVERY COMPRESSOR PACKAGE
Project No :
875
Tag Number :
E-2530 1ST STAGE DISCHARGE COOLER
Date :
17-Jun-15
Material of Lifting/Tailing Lug
Minimum specified yield strength

M = SS 400
y = 248

Thickness of Lug
Width Lug
Lug outer radius
Diameter lug hole
Height from lug base to hole center
Effective moment arm height
Fillet weld leg

T
B
R
D
H
h
FW

=
=
=
=
=
=
=

20
120
32
25
100
100
10

Partial Groove weld


Critical weld size
Joint efficiency
Cheek Plate Thickness
Cheek Plate OD

GW =
CW=
E=
T2 =
D2 =

10
17.07
1
0
0

Erection weight,
Impact factor,
Design weight, Wd = C*We
Number of lugs,
Design weight per lug,
Lifting angle,

We
C
Wd
N
W

Tension in sling,
Force,

Ft
Fx
Fy
Fz

=
=
=
=

W / Sin
Ft*Cos
Ft*Sin
0.05*Ft

=
=
=
=
=
=
=
=
=
=

4300
3.00
12900
2
6450
60
73041
36520
63255
3652

Stresses on lug Calculations


1) Shear Stress at lug eye
Sse = Ft/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
93.64
N/mm2
<
Stress result is PASS

99.20
0.4*Sy

2) Tensile Stress at Lug eye


Ste = Fy/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
81.10
<
Stress result is PASS

148.80
0.6*Sy

Lug Section Modulus (Out Plane)


(B^2 x T)/6

Zo

3) Bending Stress Outplane


Sbo = Fx x (h)/Zo
=
76.08
<
Stress result is PASS
Lug Section Modulus (Out Plane)
(T^2 x B)/6

48000

148.80
0.6*Sy

Zi

8000

4) Bending Stress Inplane


Sbo = Fz x h/Zi
=
45.65
<
Stress result is PASS

148.80
0.6*Sy

5) Tensile Stress at lug base


Stb = Fs / B*T
=
30.43
<
Stress result is PASS

148.80
0.6*Sy

6) Shear Stress at lug base


Ssb = Fx / B*T
=
15.22
<
Stress result is PASS

99.20
0.4*Sy

7) Combined Stress
=

71.37
<
Stress result is PASS

163.68
0.66*Sy

Stresses on weld calculations


1) Bending from force Fx
Zw= CW*B^2/3
=
81941.125 mm3
Aw= (2*CW*B)+(4*CW*(H-h))
=
4097.06 mm2
Swbx = (Fx*h) / Zw
=
44.57
<
Stress result is PASS

148.80
E*0.6*Sy

2) Shear from force Fx


Swsx = (Fx / Aw) / E
=
8.91
<
Stress result is PASS

99.20
E*0.4*Sy

3) Combined Shear and Bending from force Fx


Swx = Sqrt (Swbx^2 + Swsx^2)
=
45.45
<
Stress result is PASS

163.68
E*0.66*Sy

4) Shear from force Fy


Swsy = (Fy/Aw)
=
15.44
<
Stress result is PASS

99.20
E*0.4*Sy

5) Combined stress due to Fx and Fy


Swxy = SQRT[(Swsx+Swsy)^2+Swbx^2]
=
48.00
<
Stress result is PASS

163.68
E*0.66*Sy

N/mm2
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

kg
kg
kg
deg.
N
N
N
N

N/mm2

N/mm2

mm3

N/mm2

mm3

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

Lifting Lug Calculation


Tailing Lug
Project Name :
NCPOC
Project No :
836
Tag Number :
Bio Tank
Date :
2/6/2013
Material of Lifting/Tailing Lug
Minimum specified yield strength

M = SA 516 70
y = 262

N/mm2

Thickness of Lug
Width Lug
Lug outer radius
Diameter lug hole
Height from lug base to hole center
Effective moment arm height
Fillet weld leg

T
B
R
D
H
h
FW

=
=
=
=
=
=
=

32 mm
120 mm
60 mm
40 mm
139 mm
50 mm
15 mm

Partial Groove weld


Critical weld size
Joint efficiency
Cheek Plate Thickness
Cheek Plate OD

GW =
CW=
E=
T2 =
D2 =

0 mm
15.00 mm
1
0 mm
0 mm

Erection weight,
Impact factor,
Design weight, Wd = C*We
Number of lugs,
Design weight per lug,
Lifting angle,

We
C
Wd
N
W

Tension in sling,
Force,

Ft
Fx
Fy
Fz

=
=
=
=

W / Cos
W
Ft*Sin
0.05*Ft

=
=
=
=
=
=
=
=
=
=

19000 kg
2.00
38000 kg
4
9500 kg
5 deg.
93522
93167
8151
4676

N
N
N
N

Build up of impact factor 2.0


Factor of safety =
60/40 spread for sling length =
Allowance for overweight =
Sump of impact factor =

Stresses on lug Calculations


1) Shear Stress at lug eye
Sse = Ft/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
36.53
N/mm2
<
Stress result is PASS

104.80
0.4*Sy

N/mm2

2) Tensile Stress at Lug eye


Ste = Fx/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
36.39
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

Lug Section Modulus (Out Plane)


(B^2 x T)/6

Zo

3) Bending Stress Outplane


Sbo = Fx x (h)/Zo
=
60.66
<
Stress result is PASS
Lug Section Modulus (Out Plane)
(T^2 x B)/6

76800 mm3

157.20
0.6*Sy

Zi

N/mm2

20480 mm3

4) Bending Stress Inplane


Sbo = Fz x h/Zi
=
11.42
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

5) Tensile Stress at lug base


Stb = Ft / B*T
=
24.35
<
Stress result is PASS

157.20
0.6*Sy

N/mm2

6) Shear Stress at lug base


Ssb = Fx / B*T
=
24.26
<
Stress result is PASS

104.80
0.4*Sy

N/mm2

172.92
0.66*Sy

N/mm2

7) Combined Stress
=

67.53
<
Stress result is PASS

Stresses on weld calculations


1) Bending from force Fx
Zw= CW*B^2/3
=
72000 mm3
Aw= (2*CW*B)+(4*CW*(H-h))
=
8940.00 mm2
Swbx = (Fx*h) / Zw
=
64.70
<
Stress result is PASS

157.20
E*0.6*Sy

N/mm2

2) Shear from force Fx


Swsx = (Fx / Aw) / E
=
10.42
<
Stress result is PASS

104.80
E*0.4*Sy

N/mm2

3) Combined Shear and Bending from force Fx


Swx = Sqrt (Swbx^2 + Swsx^2)
=
65.53
<
Stress result is PASS

172.92
E*0.66*Sy

N/mm2

104.80
E*0.4*Sy

N/mm2

172.92
E*0.66*Sy

N/mm2

4) Shear from force Fy


Swsy = (Fy/Aw)
=
0.91
<
Stress result is PASS
5) Combined stress due to Fx and Fy
Swxy = SQRT[(Swsx+Swsy)^2+Swbx^2]
=
65.54
<
Stress result is PASS

factor 2.0
1.5
1.2
1.1 (10%)
1.98
2

Lifting Lug Calculation


Tailing Lug on Vertical Condition
Project Name :
NCPOC
Project No :
836
Tag Number :
Bio Tank
Date :
2/6/2013
Material of Lifting/Tailing Lug
Minimum specified yield strength

M = SA 516 70
y = 262

Thickness of Lug
Width Lug
Lug outer radius
Diameter lug hole
Height from lug base to hole center
Effective moment arm height
Fillet weld leg

T
B
R
D
H
h
FW

=
=
=
=
=
=
=

32
120
60
40
139
50
15

Partial Groove weld


Critical weld size
Joint efficiency
Cheek Plate Thickness
Cheek Plate OD

GW =
CW=
E=
T2 =
D2 =

0
15.00
1
0
0

Pt=
Pn=
Pl=
Ph=
Pw=

20
4
72
139
10

Gusset
Gusset
Gusset
Gusset
Gusset

plate thickness
plate quantity
plate width
Plate Height
Plate weld Size

Erection weight,
Impact factor,
Design weight, Wd = C*We
Number of lugs,
Design weight per lug,
Lifting angle,
Tension in sling,
Force,

We
C
Wd
N
W

Ft
Fx
Fy
Fz

=
=
=
=

W / Sin
Ft*Cos
Ft*Sin
0.05*Ft

=
=
=
=
=
=
=
=
=
=

19000
2.00
38000
2
19000
60
215159
107579
186333
10758

Build up of impact factor 2.0


Factor of safety =
60/40 spread for sling length =
Allowance for overweight =
Sump of impact factor =

Stresses on lug Calculations


1) Shear Stress at lug eye
Sse = Ft/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
84.05
<
Stress result is PASS

104.80
0.4*Sy

2) Tensile Stress at Lug eye


Ste = Fy/((2*(R-D/2)*T)+(2*(D2-D)*T2))
=
72.79
<
Stress result is PASS

157.20
0.6*Sy

Lug Section Modulus (Out Plane)


(B^2 x T)/6

Zo

3) Bending Stress Outplane


Sbo = Fx x (h)/Zo
=
70.04
<
Stress result is PASS
Lug Section Modulus (Out Plane)
(T^2 x B)/6

76800

157.20
0.6*Sy

Zi

20480

4) Bending Stress Inplane


Sbo = Fz x h/Zi
=
26.26
<
Stress result is PASS

157.20
0.6*Sy

5) Tensile Stress at lug base


Stb = Fs / B*T
=
56.03
<
Stress result is PASS

157.20
0.6*Sy

6) Shear Stress at lug base


Ssb = Fx / B*T
=
28.02
<
Stress result is PASS

104.80
0.4*Sy

7) Combined Stress
=

80.47
<
Stress result is PASS

172.92
0.66*Sy

Stresses on weld calculations


1) Bending from force Fx
Zw= CW*B^2/3
=
72000 mm3
Aw= (2*CW*B)+(4*CW*(H-h))
=
8940.00 mm2
Swbx = (Fx*h) / Zw
=
74.71
<
Stress result is PASS

157.20
E*0.6*Sy

2) Shear from force Fx


Swsx = (Fx / Aw) / E
=
12.03
<
Stress result is PASS

104.80
E*0.4*Sy

3) Combined Shear and Bending from force Fx


Swx = Sqrt (Swbx^2 + Swsx^2)
=
75.67
<
Stress result is PASS

172.92
E*0.66*Sy

4) Shear from force Fy


Swsy = (Fy/Aw)
=

20.84
<
Stress result is PASS

104.80
E*0.4*Sy

5) Combined stress due to Fx and Fy


Swxy = SQRT[(Swsx+Swsy)^2+Swbx^2]
=
78.49
<
Stress result is PASS

172.92
E*0.66*Sy

Gusset Plate calculation


1) Tensile stress from force Fy
Spy=Fy/(PnxPlxPt)
=
32.35
<
Stress result is PASS

157.20
0.6*Sy

2) Weld stress from force Fy


Wpy=Fy/(2x0.707xPwxPnxPl
=
45.76
<
Stress result is PASS

157.20
0.6*Sy

3) Uplift and down stress due to moment


Fld, Uplift and down force of lug
Spy=Fy/(Pn/2xPlxPt)
=
87.15
<
Stress result is PASS

251000

157.20
0.6*Sy

4) Weld stress from force Fld


Wpy=Fld/(0.707xPwxPnxPl
=
123.27
<
Stress result is PASS

157.20
0.6*Sy

10

N/mm2
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm

kg
kg
kg
deg.
N
N
N
N

of impact factor 2.0

1.5
ad for sling length =
1.2
for overweight =
1.1 (10%)
mpact factor =
1.98

11

N/mm2

N/mm2

mm3

N/mm2

mm3

N/mm2

N/mm2

N/mm2

N/mm2

12

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

13

N/mm2

N/mm2

N/mm2

N/mm2

N/mm2

8.1 SPREADER PIPE DESIGN


PROPERTIES OF SPREADER

Type of spreader
Size
Pipe material
Minimum specified yield strength,
Modulus of elasticity,
Pipe OD,
Pipe thickness,
Pipe ID,
Cross sectional area,
Moment of inertia,
Setion modulus,
Radius of gyration,
Length of pipe,
Effective end factor,
Slenderness ratio

: Pipe
: 8" Sch.80
: A 333 6
Fy =
241.32 N/mm2
E=
200000 N/mm2
D=
219.10 mm
t=
12.70 mm
d=
193.70 mm
A=
8234.99 mm2
I=
4.39E+07 mm4
Z=
4.01E+05 mm3
r=
73.05 mm
l=
2.736 mm
K=
1.0
K*l/r =
0.04

Allowable compressive stress -API RP2A (for 0 < Kl/r < Cc)
[1 - (K*l/r)/(2*Cc)]*Fy
Fc = --------------------------------------------5/3+3(K*l/r)/(8*Cc)-(K*l/r)^3/(8*Cc^3)
where,

Cc = \/ (2*pi^2*E/Fy ) =

144.78 N/mm2

127.90

COMPRESSIVE STRESS IN PIPE

Sling angle to horizontal,


Actual Structural Weight
:
Design Structural Weight
Design Lifting Factor
Design sling force,
Compressive force on pipe,
Moment,
Compressive stress due to Fp,
Bending stress due to Me,
Stress interaction ratio,

=
:
:
Fs =
Fp = Fs*Cos =
Me =
Sp = Fp / A =
Sb = Me / Z =
Sp/Fc +Cm*Sb/[(1-Sp/Fe')*0.6*Fy] =

60 Deg.
19000 kg
20000 kg
4.00
452966 N
226483 N
40665023 Nmm
27.50 N/mm2
101.38 N/mm2
0.890

<

where,

Fe' = 12*pi^2*E/(23*(K*l/r)^2) =
Cm =

734087295 N/mm2
1

1.00

OK!

Welding check on Davit Arm Support Plate(V-T2421 HP SEP HYDROCYCLONE)


Dimension of support plate
Material of support plate
Minimum specified yield strength
Weight on Davit arm support
Force on support lug
Width
Length
Thickness
Weld size groove
Weld size fillet
Area of weldment
Factor of weld

M = SS 400
y = 248
N/mm2
W=
1085 kg
Fs= 10643.85 N
63 mm
345 mm
25 mm
12.5 mm
12.5 mm
12075 mm2
0.7

Material of Lifting/Tailing Lug


Minimum specified yield stren
Wx9.81

Shear Stress Act on Davit arm support plate


1.26 N/mm2 (Mpa,145 PsiG)
Shear allowable stress
= 0.4 x y

99.2 N/mm2

DROCYCLONE)

Material of Lifting/Tailing Lug


Minimum specified yield strength

a,145 PsiG)

Support plate & Welding check on Davit Arm Support Plate(V-T2421 HP SEP HYDROCYCL
Blind Flange Location
Dimension of support plate
Material of support plate
Minimum specified yield strength
Weight on Davit arm support
Force on support lug
Width
Length
Thickness
Weld size groove
Weld size fillet
Factor of weld

M = SS 400
y=
248
W=
1085
Fx= 10643.85
63
L=
345
T=
25
Wg=
12.5
Wf=
12.5
F=
0.7

N/mm2
kg
N
mm
mm
mm
mm
mm

Material of support plate


Minimum specified yield strength

Wx9.81

Shear Strength Check On Support Plate 25mm Thickness


Area of plate on shear force =
=L x T
8625 mm2
Shear Stress Act on Davit arm support plate
Fs =
1.23 N/mm2 (Mpa)
Shear allowable stress
= 0.4 x y =
99.2 N/mm2
Shear stress is lower than the allowable stress.
Plate size sufficient for the design
Shear Strength Check On Weld Joint
Area of weld =

=L x Weld Size
6037.5 mm2

Shear Stress Act on Davit arm support plate


Fs =
Shear allowable stress
= 0.4 x y =
Shear stress is lower than the allowable stress.
Weld size sufficient for support plate .

1.76 N/mm2 (Mpa)


99.2 N/mm2

SEP HYDROCYCLONE)

pport plate
cified yield strength

Support plate & Welding check on Davit Arm Support Plate(V-T2421 HP SEP HYDROCYCL
Dished Head Location
Dimension of support plate
Material of support plate
Minimum specified yield strength
Weight on Davit arm support
Force on support lug
Width
Length
Thickness
Weld size groove
Weld size fillet
Factor of weld

M = SS 400
y=
248
W=
850
Fx= 8338.5
63
L=
345
T=
25
Wg=
12.5
Wf=
12.5
F=
0.7

N/mm2
kg
N
mm
mm
mm
mm
mm

Material of support plate


Minimum specified yield strength

Wx9.81

Shear Strength Check On Support Plate 25mm Thickness


Area of plate on shear force =
=L x T
8625 mm2
Shear Stress Act on Davit arm support plate
Fs =
0.97 N/mm2 (Mpa)
Shear allowable stress
= 0.4 x y =
99.2 N/mm2
Shear stress is lower than the allowable stress.
Plate size sufficient for the design
Shear Strength Check On Weld Joint
Area of weld =

=L x Weld Size
6037.5 mm2

Shear Stress Act on Davit arm support plate


Fs =
Shear allowable stress
= 0.4 x y =
Shear stress is lower than the allowable stress.
Weld size sufficient for support plate .

1.38 N/mm2 (Mpa)


99.2 N/mm2

SEP HYDROCYCLONE)