You are on page 1of 1

Federal Register / Vol. 73, No.

34 / Wednesday, February 20, 2008 / Notices 9313

Energy To Be Made Available not serve to make protestants parties to Any person desiring to intervene or to
The Customer will receive a ratable the proceeding. Any person wishing to protest this filing must file in
share of the energy made available by become a party must file a notice of accordance with Rules 211 and 214 of
the Nashville District of the U.S. Army intervention or motion to intervene, as the Commission’s Rules of Practice and
Corps of Engineers. appropriate. The Respondent’s answer Procedure (18 CFR 385.211, 385.214).
and all interventions, or protests must Protests will be considered by the
Billing Month be filed on or before the comment date. Commission in determining the
The billing month for capacity and The Respondent’s answer, motions to appropriate action to be taken, but will
energy sold under this schedule shall intervene, and protests must be served not serve to make protestants parties to
end at 2400 hours CDT or CST, on the Complainants. the proceeding. Any person wishing to
whichever is currently effective, on the The Commission encourages become a party must file a notice of
last day of each calendar month. electronic submission of protests and intervention or motion to intervene, as
interventions in lieu of paper using the appropriate. The Respondent’s answer
Power Factor ‘‘eFiling’’ link at http://www.ferc.gov. and all interventions, or protests must
TVA shall take capacity and energy Persons unable to file electronically be filed on or before the comment date.
from the Department of Energy at such should submit an original and 14 copies The Respondent’s answer, motions to
power factor as will best serve TVA’s of the protest or intervention to the intervene, and protests must be served
system from time to time; provided, that Federal Energy Regulatory Commission, on the Complainants.
TVA shall not impose a power factor of 888 First Street, NE., Washington, DC The Commission encourages
less than .85 lagging on the Department 20426. electronic submission of protests and
of Energy’s facilities which requires This filing is accessible on-line at interventions in lieu of paper using the
operation contrary to good operating http://www.ferc.gov, using the ‘‘eFiling’’ link at http://www.ferc.gov.
practice or results in overload or ‘‘eLibrary’’ link and is available for Persons unable to file electronically
impairment of such facilities. review in the Commission’s Public should submit an original and 14 copies
Reference Room in Washington, DC. of the protest or intervention to the
[FR Doc. E8–3108 Filed 2–19–08; 8:45 am] Federal Energy Regulatory Commission,
There is an ‘‘eSubscription’’ link on the
BILLING CODE 6450–01–P 888 First Street, NE., Washington, DC
Web site that enables subscribers to
receive e-mail notification when a 20426.
document is added to a subscribed This filing is accessible on-line at
DEPARTMENT OF ENERGY http://www.ferc.gov, using the
docket(s). For assistance with any FERC
Federal Energy Regulatory Online service, please e-mail ‘‘eLibrary’’ link and is available for
Commission FERCOnlineSupport@ferc.gov, or call review in the Commission’s Public
(866) 208–3676 (toll free). For TTY, call Reference Room in Washington, DC.
[Docket No. OR07–22–000] (202) 502–8659. There is an ‘‘eSubscription’’ link on the
Comment Date: 5 p.m. Eastern Time Web site that enables subscribers to
BP West Coast Products LLC, receive e-mail notification when a
on March 3, 2008.
Complainant, v. Calnev Pipe Line LLC, document is added to a subscribed
Respondent; Notice of Amended Kimberly D. Bose, docket(s). For assistance with any FERC
Complaint Secretary. Online service, please e-mail
[FR Doc. E8–3121 Filed 2–19–08; 8:45 am] FERCOnlineSupport@ferc.gov, or call
February 13, 2008.
Take notice that on February 11, 2008, BILLING CODE 6717–01–P (866) 208–3676 (toll free). For TTY, call
BP West Coast Products LLC (BP) (202) 502–8659.
tendered for filing its First Amended Comment Date: 5 p.m. Eastern Time
DEPARTMENT OF ENERGY on March 3, 2008.
Second Original complaint against
Calnev Pipe Line LLC (Calnev), Federal Energy Regulatory Kimberly D. Bose,
challenging all of Calnev’s Commission Secretary.
transportation and terminalling rates as [FR Doc. E8–3120 Filed 2–19–08; 8:45 am]
unjust and unreasonable. BP requests
[Docket No. OR07–19–000] BILLING CODE 6717–01–P
that the Commission review and
investigate Calnev’s rates; set the ConocoPhillips Company,
proceeding for an evidentiary hearing to Complainant, v. Calnev Pipe Line, DEPARTMENT OF ENERGY
determine just and reasonable rates for L.L.C. Respondent; Notice of Amended
Calnev; require the payment of refunds Complaint Federal Energy Regulatory
and reparations starting two years before Commission
the date of complaint for all rates; and February 13, 2008.
[Docket Nos. CP08–69–000]
award such other relief as is necessary Take notice that on February 11, 2008,
and appropriate under the Interstate ConocoPhillips Company CenterPoint Energy Gas Transmission
Commerce Act. (ConocoPhillips), tendered for filing an Company; Notice of Amendment
BP states that copies the complaint amendment to its complaint filed on Application
were served on Calnev. August 20, 2007 against Calnev Pipe
Any person desiring to intervene or to Line, L.L.C. ConocoPhillips states that, February 12, 2008.
protest this filing must file in except as modified and supplemented On February 4, 2008, in Docket No.
accordance with Rules 211 and 214 of by this amendment, the allegations and CP08–69–000, CenterPoint Energy Gas
rwilkins on PROD1PC63 with NOTICES

the Commission’s Rules of Practice and supporting evidence contained in the Transmission Company (CEGT)
Procedure (18 CFR 385.211, 385.214). original complaint remain unchanged. pursuant to section 7(c) of the Natural
Protests will be considered by the In the instant filing, ConcoPhillips Gas Act, as amended, and section 157
Commission in determining the amends its complaint to include Subparts A and C of the Federal Energy
appropriate action to be taken, but will supplemental analysis. Regulatory Commission’s (Commission)

VerDate Aug<31>2005 16:47 Feb 19, 2008 Jkt 214001 PO 00000 Frm 00041 Fmt 4703 Sfmt 4703 E:\FR\FM\20FEN1.SGM 20FEN1

You might also like