You are on page 1of 1

Federal Register / Vol. 73, No.

55 / Thursday, March 20, 2008 / Notices 14981

which allows you to keep track of all Russian River in Lake and Mendocino DEPARTMENT OF ENERGY
formal issuances and submittals in Counties, California.
specific dockets. This can reduce the Pacific Gas and Electric Company Federal Energy Regulatory
amount of time you spend researching (licensee for the Potter Valley Project) Commission
proceedings by automatically providing requested approval to allow the
you with notification of these filings, diversion of additional water from the Sunshine Act Meeting Notice
document summaries and direct links to Eel River through the Potter Valley March 13, 2008.
the documents. Go to http:// powerhouse for use by Potter Valley
www.ferc.gov/esubscribenow.htm. Irrigation District (PVID) for frost The following notice of meeting is
Finally, public meetings or site visits protection of commercial crops. The published pursuant to section 3(a) of the
will be posted on the Commission’s additional water would be provided to government in the Sunshine Act (Pub.
calendar located at http://www.ferc.gov/ PVID between March 15 and April 14, L. No. 94–409), 5 U.S.C. 552b:
EventCalendar/EventsList.aspx along 2008. The licensee would restore in AGENCY HOLDING MEETING:Federal
with other related information. Lake Pillsbury all additional water Energy Regulatory Commission.
diverted for frost protection, starting on
Kimberly D. Bose, DATE AND TIME: March 20, 2008, 10 a.m.
April 15, 2008, resulting in a water-
Secretary. neutral situation. PLACE:Room 2C, 888 First Street, NE.,
[FR Doc. E8–5596 Filed 3–19–08; 8:45 am] An environmental assessment (EA), Washington, DC 20426.
BILLING CODE 6717–01–P prepared by Commission staff in the STATUS: Open.
Office of Energy Projects, analyzed the
probable environmental effects of the MATTERS TO BE CONSIDERED: Agenda.
DEPARTMENT OF ENERGY proposed amendment and has Note—Items listed on the agenda may
concluded that approval would not be deleted without further notice.
Federal Energy Regulatory
constitute a major federal action CONTACT PERSON FOR MORE INFORMATION:
Commission
significantly affecting the quality of the Kimberly D. Bose, Secretary, Telephone
[Project No. 77–187] human environment. (202) 502–8400. For a recorded message
A copy of the EA is available for listing items struck from or added to the
Pacific Gas and Electric Company; review at the Commission or may be meeting, call (202) 502–8627.
Notice of Availability of Environmental viewed on the Commission’s Web site at This is a list of matters to be
Assessment http://www.ferc.gov using the considered by the Commission. It does
‘‘eLibrary’’ link. Enter the docket not include a listing of all documents
March 13, 2008. number excluding the last three digits in relevant to the items on the agenda. All
In accordance with the National the docket number field to access public documents, however, may be
Environmental Policy Act of 1969, as documents. For assistance, contact viewed on line at the Commission’s
amended, and the Federal Energy FERC Online Support at website at http://www.ferc.gov using the
Regulatory Commission’s regulations, ferconlinesupport@ferc.gov or toll-free eLibrary link, or may be examined in
18 CFR part 380 (Order No. 486, 52 FR at 1–866–208–3676, or for TTY, (202) the Commission’s Public Reference
47879), the Commission has reviewed 502–8659. Room.
an application, filed January 31, 2008,
requesting approval to temporarily Kimberly D. Bose, 931th—Meeting
amend article 52 of the Potter Valley Secretary.
[FR Doc. E8–5595 Filed 3–19–08; 8:45 am]
Regular Meeting
Project license. The project is located on
the Eel River and the East Branch BILLING CODE 6717–01–P March 20, 2008, 10 a.m.

Item No. Docket No. Company

ADMINISTRATIVE

A–1 .................................................. AD02–1–000 .................................. Agency Administrative Matters.


A–2 .................................................. AD02–7–000 .................................. Customer Matters, Reliability, Security and Market Operations.
A–3 .................................................. AD06–3–000 .................................. Energy Market Update.

ELECTRIC

E–1 .................................................. OMITTED.


E–2 .................................................. RM08–3–000 ................................. Mandatory Reliability Standard for Nuclear Plant Interface Coordina-
tion.
E–3 .................................................. AD07–12–000 ................................ Reliability Standard Compliance and Enforcement in Regions with
Regional Transmission Organizations or Independent System Op-
erators.
E–4 .................................................. RR06–1–012 .................................. North American Electric Reliability Council, North American Electric
Reliability Corporation.
RR07–1–002 .................................. Delegation Agreement Between the North American Electric Reli-
ability Corporation and Texas Regional Entity, a division of
ERCOT.
mstockstill on PROD1PC66 with NOTICES

RR07–2–002 .................................. Delegation Agreement Between the North American Electric Reli-
ability Corporation and Midwest Reliability Organization.
RR07–3–002 .................................. Delegation Agreement Between the North American Electric Reli-
ability Corporation and Northeast Power Coordinating Council, Inc.
RR07–4–002 .................................. Delegation Agreement Between the North American Electric Reli-
ability Corporation and ReliabilityFirst Corporation.

VerDate Aug<31>2005 16:44 Mar 19, 2008 Jkt 214001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\20MRN1.SGM 20MRN1

You might also like