Program of Works Example

0
Preliminary's

Preliminary's

Pour Concrete #2

F10 submission
CDM consultation

Bricky's

Shuttering

Foundation Blocks

Bricky's
Start from DPC

Architect consultations

Engineer consultations

brickwork to DPC

Start Blockwork

Drawings

Appoint NHBC

Commons Delivery

Start Stonework

Order Stone/Blocks etc


Order Dec Cills/Lintols
Order Steel Mesh & Bar

Spoil removal

Start Steel Fixing


Reinforcement
(Cages)
Extra Shuttering

Wall ties Delivery

Fit DPC Membrane

Book Scaffold

contact Services

Heave protection
Inspections
Order kicker blocks
Order Floor I-Beams+Hangers

Order Service Boxes


Order Sand/Cement/Febmix
Order Regularised Joist #1&2
Order Hockey Stick/Box
Order Insulation

Blocks/Stone Delivery

Oversite Concrete
Radon barrier
Insulation Delivery
Order Floor 2 I-Beams
Order Lintols (struc)

Mark Out, Check Position

Order Wall Ties

I-beams delivery

Order Ridge Beams

for reinforced strip footings

Soil pipes positioned

Radon Protection DPC's

Excavate Footings

Inspections

NHBC notification

Program Schedule

Fencing?
Order drainage
Excavate for drainage
Fit Drainage

General
Site
Program Schedule

Tree removal

Shuttering

Week Starting Mon


8-Sep-09
Week
2

1st Conc pour

Input Start Date

Attached House

Week Starting Mon


1-Sep-09
Week
1
Materials Delivered

Week Starting Mon


15-Sep-09
Week
3

Sand/Cement Del

Drainage layout
Order Templates

Soil pipes in place

Program of Works Example


0
Week Starting Mon
22-Sep-09
Week
4

0
Week Starting Mon
29-Sep-09
Week
5
Scaffold Start
1st lift, Window sills

0
Week Starting Mon
6-Oct-09
Week
6

0
Week Starting Mon
13-Oct-09
Week
7

Week Starting Mon


20-Oct-09
Week
8
Fit Ridge Beam

0
Week Starting Mon
27-Oct-09
Week
9
NHBC&REGS Inspected Roo

2nd lift, Lintol hight

Lintols
4th lift,

Roof Structure Started


Fit Roof Restraint Straps

Fit Roof insulation


dormer boarding

Fit Grnd Floor Joist/Beams Trestle Hight internal

Fit Padstones

Brickwork

Fit Cut ups Cav Closers

Fit Roof Boarding

Block Infilling

Fit Service Boxes

Fit Lintols

Set Purlins if any

Valley's constructed

Temporary Flr Boards

Fit Hockey Stick

Fit 1st Floor Joist

Fit 1st floor Restraint straps Underside netting

Fit Soil roof vents

Fit Door Templates

Fit Decorative Sills

Internal wall build

Block Infilling

Purlin Positions if any

Inspections

Fit Wall Insulation


Fit Floor Insulation
Inspections DPC

Fit Window Templates


Mullions?

Inspections

restraint straps
Cavity Closers Delivery
Roof Materials Del
Order Patio Doors
5th lift Gables cut ups

Fit Rafters in place


Slates Delivered
Drainage Delivery
Valley sets
Cut up's complete

Order Roof Materials


Order Slates

Fit Restraint Straps


Order Plumbing Mat's

Pan fitted

Velux positioned

Lintols (Struc) Delivery


Dcor Cills Lintols Del
Service box Deliivery

Floor Joist Delivery #2


Order Ridge beam
Order PAN Timber

3rd lift,
Order Cavity Closers
Order Windows onsite

Seal all Cavity's

Program of Works Example

Week Starting Mon


3-Nov-09
Week
10
ooFit Facia Boards
Fire stops (Party wall)
Fit Barge Boards

Week Starting Mon


Week Starting Mon
10-Nov-09
17-Nov-09
Week
Week
11
12
Fit Slates to Rear Roof Fan Holes Cut

Week Starting Mon


24-Nov-09
Week
13
Order Plasterboards

Week Starting Mon


1-Dec-09
Week
14
Elec& Plumb finish 1st fix

Fit Down Pipes


Fit soil & Vent Pipes

Fit Plumbing Tails


Fit Floor Insulation

Plaster boards Del


PlasterBoard Ceilings

Ceiling Plaster Skim

Fit Internal stud work

Glass Delivery

Path Materials Delivery

Fit Window Frames

Fit Glazing

Plumb 1st fix


Fit Flooring (Both Flrs)

Order Floor Insulation Bat Fit Slates to Front Roof

Week Starting Mon


8-Dec-09
Week
15

Heating pipes B.Boxs

Elec Materials Delivered Fit initial Pipe runs

Fit Door Frames

Tile or slate dormers

Elec first fix

Fit Drainage outlets

Patios Delivered

Fit Chimney Vent

Fit initial Cable runs

Stairs Delivery

Window Frames del

Fit Stairs

Order Skirts/Architrave

Fit Rainware
Aerial fitted
Fit Lat & Felt

Fit Alarm Cables/Video/TV


Order Decking for Floors Fit Door Cav Closers
Flooring Materials del
Order for Paths etc
Order Stud Timber
Order Stairs
Paint Facias

Noggs for Pendants


1st Paint Windows
Plumb Preasure Test
Order Doors+ Front dr+Fr
Order Door Frames

Fit Glazing
Boxing Pipework
Start Access Court Prep
Window Sills Delivery

Mark out Drive/paths


Clear Base around hs
Fit Window Sills
Fit Front Door
Footpath Prep

Back boxes mounted


Fit Soffits (enclosed)

Fit Patio Cav Closers

Final paint Windows


Remove Scaffold

Landscaping Front
Order Kitchen

Fit Patio Doors

Stone Delivery

Order Boiler & RADS

Fit Lead work


Order Stairs

Lead work complete


Finish all under floor work

Garage Construction

Order Sewer & M.Holes pi Dropped Curbs Delivery


Order Electrical, Cable, Boxes
Order Dropped Curbs
Sewer Pipes Materials Del Water pipes layed

Garage Prep

Sewerage Connection start


Lay Cross Drainage
Sevice trenches dug
Storm trench dug
Inspections
Sewerage trench dug
Drives and Paths Marked Sewerage Pipe layed
Storm pipe layed
Inspections

Gas Sleaves layed


Electric Sleave layed
Bt Sleave Layed
Inspections
Services to Detached
Order Turf
Order Paving/Drive Materia
Fit Drop Curbs

s Example
Week Starting Mon
15-Dec-09
Week
16

Week Starting Mon


22-Dec-09
Week
17

Week Starting Mon


29-Dec-09
Week
18
Tiling

Week Starting Mon


5-Jan-10
Week
19

Week Starting Mon


12-Jan-10
Week
20

Fit Wall Plaster Boards Plaster boarding snags


Gas/Water/Elec/BT
Fit Internal Doors

Elec & Plumbing 2nd


Fit Baths/Showers cub

Appliances
Fixtures & Fittings

Decorating snags
Landscaping Completed

Joinery 2nd fix

Decorating

WC/sinks fitted

Fit/Test Boiler

Fit Curtain rails

Order Garage Door

Fit Skirts/Architraves

Radiators mounted

Tiling Completed

Footpaths finished

Lay Rear Paths

Fit lights/switches/Soc

Fit Taps,toilet seats

Fit Garden Fences

Fit Worktops

Garage Doors Fitted

Cleaning

Fit Laminate Flooring


Heating Tested
Electrical Testing complete

Dressing
Final Checks
Skip for clearance

n Book Painters

Wall Plasterboard SkImOrder Tiling


Landscape Rear
Inspections
Skirt/Architrave Delivery
Lay Front Paths
Order WC's/Sinks/Bath

Fit Kitchen Units


Laminate Delivery

Fit Door Hardware


Rear Fences mounted
Inspections
WC's/Sinks/Bath DeliveryTurfing Rear
Elec 2nd fix Mat Del.
Garage Doors Delivery

Lay Outdoor Cables forRads Delivered


Order Laminate
Turf Delivery

Boiler Delivery
Turfing Front Lawn

Kitchen Delivery

oxes
Sewer connection

Driveways Started

Services Connected
Elec/Water/BT/Gas?

Access Court detail


Landscaping

Garden Fence Delivery Sand Bed


Bndry Fence Delivery Hardcore Court
Paint Delivered
Whacker Hardcore
Driveway Materials Del Order Bndry Fence
a Lower Cables in Footpat Order Garden Fence
Order for Paths etc

Lay Block Paving


Landscaping
Driveways Complete
Bndry Fence Erection

Inspections
Regs/NHBC Final Inspection