16290 Federal Register / Vol. 73, No.

60 / Thursday, March 27, 2008 / Notices

t. Agency Comments—Federal, State, Please include the project number (P– competing development application
and local agencies are invited to file 13098–000) on any comments or must submit to the Commission, on or
comments on the described application. motions filed. before a specified comment date for the
A copy of the application may be The Commission’s Rules of Practice particular application, either a
obtained by agencies directly from the and Procedure require all intervenors competing development application or a
Applicant. If an agency does not file filing documents with the Commission notice of intent to file such an
comments within the time specified for to serve a copy of that document on application. Submission of a timely
filing comments, it will be presumed to each person in the official service list notice of intent to file a development
have no comments. One copy of an for the project. Further, if an intervenor application allows an interested person
agency’s comments must also be sent to files comments or documents with the to file the competing application no
the Applicant’s representatives. Commission relating to the merits of an later than 120 days after the specified
issue that may affect the responsibilities comment date for the particular
Kimberly D. Bose, of a particular resource agency, they application. A competing license
Secretary. must also serve a copy of the document application must conform with 18 CFR
[FR Doc. E8–6219 Filed 3–26–08; 8:45 am] on that resource agency. 4.30 and 4.36.
BILLING CODE 6717–01–P k. Description of Project: The p. Notice of Intent—A notice of intent
proposed project consists of: (1) 875 must specify the exact name, business
proposed 20 kilowatt Free Flow address, and telephone number of the
DEPARTMENT OF ENERGY generating units having a total installed prospective applicant, and must include
capacity of 17.5 megawatts, (2) a an unequivocal statement of intent to
Federal Energy Regulatory proposed transmission line, and (3) submit, if such an application may be
Commission appurtenant facilities. The FFP Niagara filed, either a preliminary permit
[Project No. 13098–000] Project 1, LLC, project would have an application or a development
average annual generation of 76.6 application (specify which type of
FFP Niagara Project 1, LLC; Notice of gigawatt-hours and be sold to a local application). A notice of intent must be
Application Accepted for Filing and utility. served on the applicant(s) named in this
Soliciting Motions to Intervene, l. Locations of Applications: A copy of public notice.
Protests, and Comments the application is available for q. Proposed Scope of Studies Under
inspection and reproduction at the Permit—A preliminary permit, if issued,
March 20, 2008. Commission in the Public Reference does not authorize construction. The
Take notice that the following Room, located at 888 First Street, NE., term of the proposed preliminary permit
hydroelectric application has been filed Room 2A, Washington DC 20426, or by would be 36 months. The work
with the Commission and is available calling (202) 502–8371. This filing may proposed under the preliminary permit
for public inspection: also be viewed on the Commission’s would include economic analysis,
a. Type of Application: Preliminary Web site at http://www.ferc.gov using preparation of preliminary engineering
Permit. the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental
b. Project No.: 13098–000. number excluding the last three digits in impacts. Based on the results of these
c. Date filed: January 18, 2008. the docket number field to access the studies, the Applicant would decide
d. Applicant: FFP Project 19, LLC. document. For assistance, call toll-free whether to proceed with the preparation
e. Name of Project: Niagara River 1–866–208–3676 or e-mail of a development application to
Project. FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
f. Location: The project would be call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to
located on the Niagara River in Erie and available for inspection and Intervene—Anyone may submit
Niagara Counties, New York. The reproduction at the address in item h comments, a protest, or a motion to
project uses no dam or impoundment. above. intervene in accordance with the
g. Filed Pursuant to: Federal Power m. Individuals desiring to be included requirements of Rules of Practice and
Act, 16 U.S.C. 791(a)–825(r). on the Commission’s mailing list should Procedure, 18 CFR 385.210, .211, .214.
h. Applicant Contact: Mr. Dan Irvin, so indicate by writing to the Secretary In determining the appropriate action to
FFP Niagara Project 1, LLC, 69 Bridge of the Commission. take, the Commission will consider all
Street, Manchester, MA 01944, phone n. Competing Preliminary Permit— protests or other comments filed, but
(978) 232–3536. Anyone desiring to file a competing only those who file a motion to
i. FERC Contact: Robert Bell, (202) application for preliminary permit for a intervene in accordance with the
502–6062. proposed project must submit the Commission’s Rules may become a
j. Deadline for filing comments, competing application itself, or a notice party to the proceeding. Any comments,
protests, and motions to intervene: 60 of intent to file such an application, to protests, or motions to intervene must
days from the issuance date of this the Commission on or before the be received on or before the specified
notice. specified comment date for the comment date for the particular
All documents (original and eight particular application (see 18 CFR 4.36). application.
copies) should be filed with: Kimberly Submission of a timely notice of intent Comments, protests and interventions
D. Bose, Secretary, Federal Energy allows an interested person to file the may be filed electronically via the
Regulatory Commission, 888 First competing preliminary permit Internet in lieu of paper. See 18 CFR
Street, NE., Washington, DC 20426. application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions
Comments, protests, and interventions the specified comment date for the on the Commission’s Web site under
may be filed electronically via the particular application. A competing ‘‘e-filing’’ link. The Commission
pwalker on PROD1PC71 with NOTICES

Internet in lieu of paper; see 18 CFR preliminary permit application must strongly encourages electronic filing.
385.2001(a)(1)(iii) and the instructions conform with 18 CFR 4.30 and 4.36. s. Filing and Service of Responsive
on the Commission’s Web site under the o. Competing Development Documents—Any filings must bear in
‘‘e-Filing’’ link. The Commission Application—Any qualified all capital letters the title
strongly encourages electronic filings. development applicant desiring to file a ‘‘COMMENTS’’, ‘‘COMPETING

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1
Federal Register / Vol. 73, No. 60 / Thursday, March 27, 2008 / Notices 16291

APPLICATION’’, j. Deadline for filing comments, the Commission on or before the


‘‘RECOMMENDATIONS FOR TERMS protests, and motions to intervene: 60 specified comment date for the
AND CONDITIONS’’, ‘‘PROTEST’’, OR days from the issuance date of this particular application (see 18 CFR 4.36).
‘‘MOTION TO INTERVENE’’, as notice. Submission of a timely notice of intent
applicable, and the Project Number of All documents (original and eight allows an interested person to file the
the particular application to which the copies) should be filed with: Kimberly competing preliminary permit
filing refers. Any of the above-named D. Bose, Secretary, Federal Energy application no later than 30 days after
documents must be filed by providing Regulatory Commission, 888 First the specified comment date for the
the original and the number of copies Street, NE., Washington, DC 20426. particular application. A competing
provided by the Commission’s Comments, protests, and interventions preliminary permit application must
regulations to: The Secretary, Federal may be filed electronically via the conform with 18 CFR 4.30 and 4.36.
Energy Regulatory Commission, 888 Internet in lieu of paper; see 18 CFR n. Competing Development
First Street, NE., Washington, DC 20426. 385.2001(a)(1)(iii) and the instructions Application—Any qualified
A copy of any motion to intervene must on the Commission’s Web site under the development applicant desiring to file a
also be served upon each representative ‘‘e-Filing’’ link. The Commission competing development application
of the Applicant specified in the strongly encourages electronic filings. must submit to the Commission, on or
particular application. Please include the project number before a specified comment date for the
t. Agency Comments—Federal, State, (P–13006–000) on any comments or particular application, either a
and local agencies are invited to file motions filed. competing development application or a
comments on the described application. The Commission’s Rules of Practice notice of intent to file such an
A copy of the application may be and Procedure require all intervenors application. Submission of a timely
obtained by agencies directly from the filing documents with the Commission notice of intent to file a development
Applicant. If an agency does not file to serve a copy of that document on application allows an interested person
comments within the time specified for each person in the official service list to file the competing application no
filing comments, it will be presumed to for the project. Further, if an intervenor later than 120 days after the specified
have no comments. One copy of an files comments or documents with the comment date for the particular
agency’s comments must also be sent to Commission relating to the merits of an application. A competing license
the Applicant’s representatives. issue that may affect the responsibilities application must conform with 18 CFR
of a particular resource agency, they 4.30 and 4.36.
Kimberly D. Bose, must also serve a copy of the document o. Notice of Intent—A notice of intent
Secretary. on that resource agency. must specify the exact name, business
[FR Doc. E8–6218 Filed 3–26–08; 8:45 am] k. Description of Project: The address, and telephone number of the
BILLING CODE 6717–01–P proposed project using the U.S. Army prospective applicant, and must include
Corps of Engineers’ Green River Lock an unequivocal statement of intent to
and Dam #5 and operated in a run-of- submit, if such an application may be
DEPARTMENT OF ENERGY river mode would consist of: (1) A new filed, either a preliminary permit
powerhouse and switchyard; (2) two application or a development
Federal Energy Regulatory turbine/generator units with a combined application (specify which type of
Commission installed capacity of 14 megawatts; (3) a application). A notice of intent must be
[Project No. 13006–000] new 0.25-mile-long above ground 25- served on the applicant(s) named in this
kilovolt transmission line extending public notice.
Green River 5 Hydro, LLC; Notice of from the switchyard to an p. Proposed Scope of Studies Under
Application Accepted for Filing and interconnection point with the local Permit—A preliminary permit, if issued,
Soliciting Motions to Intervene, utility’s distribution system; and (4) does not authorize construction. The
Protests, and Comments appurtenant facilities. The proposed term of the proposed preliminary permit
Green River Lock and Dam #5 Project would be 36 months. The work
March 20, 2008.
would have an average annual proposed under the preliminary permit
Take notice that the following generation of 40 gigawatt-hours. would include economic analysis,
hydroelectric application has been filed l. This filing is available for review at preparation of preliminary engineering
with the Commission and is available the Commission in the Public Reference plans, and a study of environmental
for public inspection: Room or may be viewed on the impacts. Based on the results of these
a. Type of Application: Preliminary Commission’s Web site at http:// studies, the Applicant would decide
Permit. www.ferc.gov using the ‘‘eLibrary’’ link. whether to proceed with the preparation
b. Project No.: 13006–000.
c. Date filed: September 7, 2007. Enter the docket number excluding the of a development application to
d. Applicant: Green River 5 Hydro, last three digits in the docket number construct and operate the project.
LLC. field to access the document. For q. Comments, Protests, or Motions to
e. Name of Project: Green River Lock assistance, call toll-free 1–866–208– Intervene—Anyone may submit
and Dam #5 Hydroelectric Project. 3676 or e-mail comments, a protest, or a motion to
f. Location: Green River in Warren FERCONLINESUPPORT@FERC.GOV. intervene in accordance with the
County, Kentucky. It would use the U.S. For TTY, call (202) 502–8659. A copy is requirements of Rules of Practice and
Army Corps of Engineers’ Green River also available for inspection and Procedure, 18 CFR 385.210, .211, .214.
Lock and Dam #5. reproduction at the address in item h In determining the appropriate action to
g. Filed Pursuant to: Federal Power above. take, the Commission will consider all
Act, 16 U.S.C. 791(a)–825(r). m. Competing Preliminary Permit— protests or other comments filed, but
pwalker on PROD1PC71 with NOTICES

h. Applicant Contact: Mr. Brent L. Anyone desiring to file a competing only those who file a motion to
Smith, COO, Symbiotics, LLC, P.O. Box application for preliminary permit for a intervene in accordance with the
535, Rigby, ID 83442, (208) 745–0834. proposed project must submit the Commission’s Rules may become a
i. FERC Contact: Robert Bell, (202) competing application itself, or a notice party to the proceeding. Any comments,
502–4126. of intent to file such an application, to protests, or motions to intervene must

VerDate Aug<31>2005 16:08 Mar 26, 2008 Jkt 214001 PO 00000 Frm 00047 Fmt 4703 Sfmt 4703 E:\FR\FM\27MRN1.SGM 27MRN1