Professional Documents
Culture Documents
Introduction
G P.
G.
P Zachariades
Z h i d iis jjustly
tl proud
d off th
the reputation
t ti ffor quality
lit and
d professionalism
f
i
li
it has enjoyed for over 50 years in the construction industry.
The company takes its name from the founder George P. Zachariades,
whose initials GPZ have become synonymous with the company name.
Key Facts
E
Excellent
ll t ttrack
k record
d iin the
th Kingdom
Ki d
off B
Bahrain
h i for
f 35 years
Has established a unique reputation for high quality and timely completions
A
Approved
d credit
dit and
d bonding
b di ffacilities
iliti with
ith major
j iinternational
t
ti
l and
d llocall b
banks
k
BD. 42 million
2008 I
BD. 52 million
2007 I
BD. 35 million
M
Management
t and
d Staff
St ff
Managerial
I 42
T h i l & Fi
Technical
Field
ld
I 267
Administrative
I 143
______
Subtotal
I 452
______
Staff Accommodation
Budaiya No. 1
B d i N
Budaiya
No. 2
Sitra (various)
Budaiya (rented villas)
I Senior staff
I Staff,
St ff foremen,
f
supervisors
i
and
d skilled
kill d ttradesmen
d
I Skilled & unskilled labour
I Senior staff
Bank Facilities
HSBC Bank Middle East
P.O. Box 57
Manama Bahrain
Manama,
United Bank
P.O. Box 546
Manama Bahrain
Manama,
Major Clients
1. The Kingdom of Bahrain
Major Clients
4. Industry and Telecommunications
Aluminium Bahrain
B h i P
Bahrain
Petroleum
t l
Bahrain Telecommunications Company
Asry Ship Repair Yard
In-House Manufacturing
Standard and Bespoke
Joinery
Aluminium Factory
Rebar Cut & Bend
Structural Steel & Metal
Fabrications
Electro-Mechanical Works
Low Voltage and Low Current
S t
Systems
High Voltage Substations &
Switchyards (upto 11 KV)
Plumbing & Waste Disposal
S
Systems
Heating, Ventilation & Air
Conditioning (HVAC)
Systems
Building Management
Systems
Emergency Power & UPS
Systems
Capability
5. Experienced personnel
Retained on a long term basis providing ability to respond quickly and effectively to
Client's requirements.
M&L Facilities
GPZ in-house Manufacturing and Logistics departments play a key role in the operations of the company.
M&L facilities in Bahrain are established at the following three locations:
Reinforcement Factory
Joinery Factory
Marble & Gypsum Workshop
Plant & Logistics Department
Plant Maintenance
Systems Development
Planning Department
Q
Quantity
tit Surveying
S
i Department
D
t
t
M&L Capability
GPZ in-house M&L facilities have:
Comprehensively equipped factories and workshops with modern machinery, equipment and tools
Allowed the company to be self sufficient in all disciplines of the building and civil engineering
industries ensuring high quality and timely completions as a result of better control and co-ordination
between the various trades
Achieved excellence in all manufacturing variables, which is well substantiated by significant growth
patterns in quality, dependability, flexibility and competitiveness
A coordinated approach to value engineering and technological innovation to accept any challenge
Aluminium Factory
FACILITY I 1,800 m - Main Factory
Lay-down area & Storage
CAPACITY I
360 tons / year aluminium profiles
43,000 m / year ACP paneling
43 000 m
43,000
m / year curtain walling
FABRICATION I
Curtain walls
ACP Cladding
Frameless and structural glazing
Partition walls
Domestic and industrial partitions
Doors
D
and
d windows
i d
((allll ttypes))
Power columns
Skylights, louvers, etc.
Aluminium Factory
MAJOR PROJECTS I
Reinforcement Factory
FACILITY I 3,700 m - Main Factory
Lay-down area & Storage
CAPACITY I
18,000 tons / year cutting and bending of steel
FABRICATION I
Conventional and specialized
constructions
Factory is equipped with the latest
y and equipment
q p
utilizing
g hi-tech
machinery
design software and technology for
bending schedules
Two production lines for reinforcing steel
up to 40mm diameter
Joinery Factory
FACILITY I 4,500 m - Main Factory
Lay-down area & Storage
CAPACITY I
96,000 m / year veneer
62,000 m / year boards
720 m3 / year timber
FABRICATION I
Doors, frames, windows, louvers (all types)
Bespoke furniture (all types)
Receptions,
Receptions counters,
counters sideboards
sideboards,
bookshelves
Cabinet work, wardrobes, kitchens and
other interior fitted items
Kiosks, fixed partitions, wall panels
Hand carved features, decorative
mouldings & ceilings
Staircases, handrails
Wooden flooring & skirting
Acoustic panels
panels, auditorium seating
Joinery Factory
MAJOR PROJECTS I
Regency Inter
Inter-Continental
Continental Hotel
Ritz Carlton Hotel and Spa
Mvenpick Hotel
Bushido Restaurant
Medical University of Bahrain
Royal University for Women
Al Jawhara Center
Unicorn Investment Bank
T i Residential
Twin
R id ti l T
Towers
350 Villas at Riffa Views
Al Dur Water Desalination Plant
Accomplished Projects
A.
Building Projects
Hotels and Hospitality Buildings
P l
Palaces
Banks and Financial Institutions
Offices and Commercial Buildings
Hospitals and Medical Buildings
Government Building
Academic Buildings
Residential Buildings
US$ 38,200,000
Contract Period I
US$ 23,000,000
23 000 000
Contract Period I
Global Express
Consultant I
US$ 101,860,000
101 860 000
Contract Period I
P i t Client
Private
Cli t
Consultant I
US$ 10,750,000
Contract Period I
International Hotels
Consultant I
US$ 13,100,000
13 100 000
Contract Period I
US$ 10,170,000
10 170 000
Contract Period I
Private Client
Consultant I
US$ 9,300,000
Contract Period I
Almoayyed Engineering
Description I
Extensions, extensive modification and decoration works
to the hotel for the 1988 Conference of the GCC Heads of
States, completed in only 8 months.
Construction of hotel bar, majlis, meeting room, royal
suites, associated corridors, renovation of reception and 3
conference rooms, Conversion of main hall of existing
cinema into high specification GCC Conference Hall.
Complete interior decoration work to the highest
specification and quality. The hotel was completely
repainted externally.
Complete electrical and mechanical works, air-conditioning
air conditioning
and sprinkler systems.
US$ 4,066,000
4 066 000
Contract Period I
Private Client
Consultant I
US$ 8,000,000
8 000 000
Contract Period I
M h
Mohammed
d Jassim
J
i A Zayani
Z
i
Consultant I
Palaces
Palaces
Gudaibiya Palace
Value of Contract I
US$ 28,650,000
28 650 000
Contract Period I
S
Ministry off Works & Housing, Special
Projects Directorate
Consultant I
US$ 13,250,000
Contract Period I
US$ 12,600,000
Contract Period I
US$ 10,132,000
Contract Period I
US$ 9,900,000
Contract Period I
US$ 13,200,000
Contract Period I
US$ 6,500,000
Contract Period I
Woods Bagot
Description I
Turn key fit-out project for BNP Paribas HQ (6 floors) at
Bahrain Financial Harbour. Total area of 5,650 m2.
Fit-out works: Demolitions & alterations for new layouts,
high quality floor, wall and ceiling finishes, metalwork,
joinery and carpentry works.
Mechanical, electrical and plumbing installations included
conduits, electrical power and data cable trays, wiring,
supply and installation of light fixtures, fire protection and
fighting systems, public address system, sanitaryware,
fittings & accessories, air-conditioning system, access door
control system, etc.
US$ 5,970,000
Contract Period I
US$ 3,000,000
Contract Period I
US$ 8,200,000
Contract Period I
US$ 28,975,000
Contract Period I
Private Client
Consultant I
US$ 13,800,000
13 800 000
Contract Period I
US$ 23,900,000
23 900 000
Contract Period I
US$ 9,926,000
Contract Period I
US$ 33,000,000
33 000 000
Contract Period I
US$ 18,100,000
18 100 000
Contract Period I
US$ 8,500,000
8 500 000
Contract Period I
US$ 3,600,000
Contract Period I
Europtima ME
Description I
Refurbishment and conversion works in the Commercial
Complex, including all MEP installation works.
Refurbishment of all shop fronts and circulation areas,
modification to mall entrances, new floor finishes, special
effect painting to walls, new central skylight, 3 simulated
fl
flower
ponds,
d 57 individually
i di id ll d
decorated,
t d b
backlit,
klit suspended
d d
ceiling features, toilets complete with sanitary-ware, fittings
and accessories.
Conversion of existing Ballroom into new shops. Strip-out
of all internal finishes and partitions and formation of new
shops with reinforced concrete footings, columns, beams
and arches
arches, complete with blockwork party walls
walls.
US$ 10,995,700
Contract Period I
US$ 11,059,600
11 059 600
Contract Period I
US$ 15,650,000
15 650 000
Contract Period I
US$ 32,282,000
32 282 000
Contract Period I
US$ 3,110,000
3 110 000
Contract Period I
US$ 4,650,000
4 650 000
Contract Period I
Government Buildings
Government Buildings
Bahrain Monument at Sakhir
Value of Contract I
US$ 15,900,000
15 900 000
Contract Period I
Government Buildings
Ministry of Labour & Social Affairs
Headquarter Building
Value of Contract I
US$ 8,620,000
Contract Period I
Government Buildings
Ministry of Interior
Headquarter Building
Value of Contract I
Ministry of Interior
Consultant I
Government Buildings
Ministry of Justice & Islamic Affairs
Minors Building
Value of Contract I
US$ 5,610,000
Contract Period I
Government Buildings
Electricity Directorate
System Control Centre
Value of Contract I
US$ 4,960,000
Contract Period I
Electricity Directorate
Consultant I
Academic Buildings
Academic Buildings
Royal University for Women
Value of Contract I
US$ 11,500,000
11 500 000
Contract Period I
Academic Buildings
St. Christophers Junior School
Value of Contract I
US$ 8,000,000
8 000 000
Contract Period I
Tebodin
Description I
Construction of an educational development comprising of
6 two storey teaching wings and a Library. The wings are
interconnected by covered walkways at ground and first
floor. The total floor area is approximately 11,500 m2.
Main accommodation: classrooms, assembly hall,
gymnasium,, administration office and associated facilities.
gy
External areas: swimming pool, tennis court , all-weather
artificial playing surface, caretaker and security building.
The services include external chiller and transformer
rooms, a maintenance yard with four stores switch and
pump rooms.
Academic Buildings
Al-Ruwad School
Value of Contract I
US$ 3,907,000
Contract Period I
Residential Buildings
Residential Buildings
Riffa Views
Lagoon Estate Package
Value of Contract I
US$ 114,000,000
Contract Period I
Cli t I
Client
Residential Buildings
Durrat Al Bahrain
Atoll 3 & 4 Villas
Value of Contract I
US$ 130,400,000
Contract Period I
Residential Buildings
Jasrah Villas
Value of Contract I
US$ 13,500,000
Contract Period I
Private Client
Consultant I
Residential Buildings
Residential Towers in Seef
Value of Contract I
US$ 10,350,000
Contract Period I
Private Client
Consultant I
Industrial Projects
Industrial Projects
Al Dur Water & Power Project
Southern Power Plant (Building & Civil Works)
and R.O. Plant (Building Works)
Value of Contract I
US$ 43,284,770
Contract Period I
Description I
Building works comprise of construction of: Gas & Stream
Turbine Building, Chiller Plant HVAC Control Building, Local
Electrical Building, Demineralization Building, Fire Fighting
B ildi
Building,
C
Central
t lC
Control
t lB
Building,
ildi
F
Fuell G
Gas R
Reducing
d i
Building, N2 Bottle Shade, Switchgear Building for Cooling
Tower, LP CO2 Tank Shade, Chemical Dosing Shade.
Civil Works comprise of construction of foundation for
Power Plant, civil works for Services and for Drainage &
Sewerage.
Industrial Projects
Hidd Power Station
Desalination Plant (Civil Works)
Value of Contract I
US$ 22,675,000
Contract Period I
Description I
Foundations for 10 Desalination Units & Steam Transformers,
foundations for 3 Auxiliary Boiler and 3 Black Start Generators,
Switchgear Building, Central Chemical Area and Storage,
D
Dump
C d
Condenser
ffoundations,
d ti
G
Gas R
Reducing
d i St
Station
ti
Extension, 3 Months Lime Storage Area, Lime Stone Filters
and Mineralization, CO2 Generation, Potable Laboratory and
LV Switchgear Buildings, Hypo-Chlorination Building, Sea
Water Supply Lines, Seawater and Brine Discharge System,
Steam System and Pipe Rack, Drainage systems, Fire
Fighting & Protection system,
system external areas.
areas
Industrial Projects
ALBA Potline 5 Expansion Project
Casthouse Building
Value of Contract I
US$ 17,270,000
Contract Period I
Industrial Projects
Reverse Osmosis Desalination Plant
Value of Contract I
US$ 14,600,000
Contract Period I
SWECO, Sweden
Description I
A 46,000 m/day R.O. Desalination Plant at Ras Abu Jarjur.
Extensive earthworks, including cofferdam for outfall to sea,
nine major buildings, concrete foundations for equipment,
trenches and ducts for drainage and other services, roads,
parking areas, shelters, boundary wall and fencing, 15 wellhead foundations and 5 km of cable trench.
Building construction comprising concrete piled foundations,
structural steel frames with blockwork and coated steel
profiled roofing and cladding..
Industrial Projects
Al Ezzel Power Plant
Main Civil Works
Value of Contract I
US$ 14,480,000
Contract Period I
Description I
Demolition of existing buildings, dismantling of electrical
sub-stations, removal of all roads and service installations.
Main civil works for combined cycle power plant comprising
construction of: Steam and Gas Turbine Building, Admin.
Building incorporating Control Room, Demineralisation
Plant, structures for Emergency Power Generation,
structures for Transformers, foundations for Power Control
Centre, sleeper ways and bridge structures, concrete
troughs for HV Cables, Gate House, Workshop and Store,
external works (roads,
(roads parking),
parking) drainage systems
systems.
Industrial Projects
ALBA Potline 4
Air Compressor Facility
Value of Contract I
US$ 8,865,000
Contract Period I
Industrial Projects
ALBA Potline 5 Expansion Project
Air Compressor Plant
Value of Contract I
US$ 7,515,000
Contract Period I
Industrial Projects
Manama - Muharraq Bridge
Strengthening Works
Value of Contract I
US $ 6,325,000
Contract Period I
Industrial Projects
ALBA Potline 5 Expansion Project
Anode Baking Furnace & Storage Building
Value of Contract I
US$ 6,290,000
Contract Period I
Industrial Projects
Tubli Water Pollution Control Centre
Tertiary Treatment Plant Expansion
Value of Contract I
US$ 2,800,000
Contract Period I
Consultant I
Industrial Projects
ALBA Potline 4
Green Anode Paste Plant
Value of Contract I
US$ 1,989,000
Contract Period I
Industrial Projects
Awali Sewage Treatment Scheme
Value of Contract I
US$ 1,973,500
Contract Period I
Watson - Khonji
Description I
Design-and-construct contract for treatment of sewage
waste and pumping of treated effluent to new location.
Construction of STP (activated sludge process) consisting
of 5 glass coated steel tanks, floating aerators, half bridge
clarifier scrapers, sludge and filtrate pumping stations,
electrical sub-station, control building, sampling room, office
and staff facilities. Installation of all MEP services.
Construction of concrete effluent storage tank and pumping
station, 800 m of 200 mm diameter GRP pipeline with road,
gas and
d oilil pipe
i crossings.
i
Industrial Projects
Bahrain Flour Mills
Additional Silos
Value of Contract I
US$ 10,200,000
Contract Period I
Industrial Projects
Bahrain Flour Mills
Repair & Rehabilitation
Value of Contract I
US$ 600,000
Contract Period I
The company constantly targets for zero lost time injuries and operates their Safety,
Health and Environment (HSE) procedures in accordance with the latest international
standards.
Major international and Bahrain based industrial organisations have recognised the
safety record of GPZ and have regularly awarded certificates of achievement to the
company.
Safety Certificates
Safety Certificates
Safety Certificates
Safety Certificates
Safety Certificates
Appreciation Certificates
Appreciation Certificates
Appreciation Certificates
Appreciation Certificates
Appreciation Certificates
Appreciation Certificates