This document is the sole property of TGE. It must not be copied or used without written consent of TGE.
Last update on 02.03.2015
TABLE OF CONTENT
A) REFERENCES IN LNG PROJECTS
05421// Shenzhen LNG Peak Shaving Terminal EPC Project ............................................................ 5
05389// Zhejiang Zhoushan LNG Receiving & Bunkering Terminal .................................................. 6
05290// 4 x 160.000 m Full Containment Storage LNG Tank facilities ........................................... 7
05093// 160.000 m Full Containment Storage LNG Tank ............................................................. 8
05170// 30.000 m LNG Storage Tank & Facilities ........................................................................ 9
05292// 50.000 m LNG Storage Tank & Loading Facilities .......................................................... 10
05344// 29,000 m LNG Storage and Distribution System Qinshui Coal Bed ................................. 11
05375// 29,000 m LNG Storage and Distribution System 400,000 t/a LNG Reserve Project .......... 12
05374// Piping Stress Calculation for Shenzhen LNG Receiving Terminal ........................................ 13
05338// Design of Process Tunnel Facility .................................................................................... 14
05308// Engineering Service for LNG Terminal Yuedong .............................................................. 15
05059// LNG Tank Ningbo - China ............................................................................................ 16
05063// Sines LNG Terminal Expansion Project ............................................................................ 17
05118// Ji Munai 1,500,000 Stdm3/d LNG Project ...................................................................... 18
02197// 1.2Mil t/a Methanol and 0.8Mil DME Project Naomaohu China for ............................... 19
02201// Concept Design for 20mmtpa LNG Production Facility ..................................................... 20
01548// 2 x 150,000 m LNG Receiving Terminal in Mugardos (La Corua) .................................. 21
01567// Snhvit LNG Export Terminal ......................................................................................... 22
01977// FEED for 2 x 160,000 m LNG Receiving Terminal, Calhoun - USA .................................. 23
01924// FEED for 2 x 160,000 m LNG Receiving Terminal, Kitimat - Canada ............................... 24
01454// 1,500,000 Stdm3/d LNG Project, Shan Shan - China ...................................................... 25
01431// 2 x 120,000 m3 Sines LNG Terminal, Portugal ................................................................ 26
Page 2 of 59
Page 3 of 59
A)
Page 4 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
LNG Regasification Terminal
- Unloading/Loading System: LNG
Unloading/Loading Arms (2) and Vapour
Return Arm (1)
- LNG Storage Tank (1) of 80,000 m3 Stora
Capacity (net)
- LP LNG Pumps (3)
- BOG Handling System: Desuperheater, BO
Suction Drum, and BOG Compressors (2)
TGE SCOPE:
-
Page 5 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Zhoushan, China
ENN (Zhoushan) LNG Co., Ltd
TGE/YPDI
2017
05389
PROJECT DESCRIPTION:
EPC Contract for Two (2) x 160,000 cum LNG Gas storage tanks
TGE SCOPE:
-
Procurement
Construction
Page 6 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Consortium under the lead of TGE Gas Engineering GmbH is contracted to build four full
containment LNG storage tanks, each with a capacity of 160,000 m3. The primary standard of LNG
Tanks shall be EN 14620-2006 for design, manufacturing, inspection and testing, purging and cool
down. Local codes and standards to be considered and applied where applicable.
Engineering is executed within several engineering entities of TGE and SNEC.
TGE SCOPE:
Page 7 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Consortium under the lead of TGE Gas Engineering GmbH is contracted to build the 4th Tank and
interconnecting piping to the existing operation unit with connections for EPC future expansions.
Engineering is executed within several engineering entities of TGE and SNEC.
TGE SCOPE:
-
Page 8 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
China
Inner Mongolia Huineng Coal Chemical Co., Ltd.
TGE
2014
05170
Project Description:
30,000 m3 LNG storage tank single containment (steel / steel)
Two submerged LNG in-tank pumps (320 m3/h; 130 mLC)
Eight truck loading facilities
TGE SCOPE:
-
Basic design
Procurement / delivery of main equipment
Supervision of Construction, PreCommissioning, Commissioning and
Performance tests
Page 9 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Zhongwei, China
Ningxia Zhongwei Guanghui Energy Development
Co., Ltd.
TGE
2014
05292
Project Description:
TGE SCOPE:
-
Basic design
Procurement / delivery of main equipment
Supervision of Construction, PreCommissioning, Commissioning and
Performance tests
Page 10 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
TGE SCOPE:
-
Basic and Detail Design for 29,000 m Full Containment LNG Storage Tank
Procurement Delivery of Special Material for Tank, Mechanical Equipment for Tank (Pumps and
Hoist) as well as Tank Instrumentation and Tank Safety Valves
Basic Design for LNG Send-Out and Distribution System (Truck Loading)
Site Supervision for Construction and Commissioning Support
Page 11 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 12 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 13 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Piping layout for a tunnel between Process area and Jetty (Basic- and Detail Engineering)
TGE SCOPE:
-
Page 14 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Yuedong, China
CNOOC Shandong Chemical Engineering Co.,
Ltd.
TGE Gas Engineering GmbH for SDCEC
Shangdong Design Chemical
Engineering Company
2012
05308
PROJECT DESCRIPTION:
Engineering Review Service Contract for Yuedong LNG Terminal Basic and Detail Engineering
developed by SDCEC
TGE SCOPE:
-
Page 15 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
LNG Storage Tank:
The scope of work defines three 160,000m3 full containment LNG storage tanks. The primary standard of
LNG Tanks shall be EN14620-2006 for design, manufacture, inspection and testing, drying, purging and
cool down.
TGE SCOPE:
EPC turn-key contractor:
- Authority Engineering
- Basic Engineering
- Procurement Off Shore
- Detail Engineering
- Construction
- Installation
Mechanical Completion
Commissioning
Start-up
Performance Guarantee Testing
Technical support during run test
Page 16 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Sines, Portugal
REN Atlntico
Projesines: Joint Venture Somague /TGE
2012
05063
PROJECT DESCRIPTION:
EPC contract for the extension of the existing receiving, storage and regasification facilities increasing
storage and send out capacity by 50%. Built o EN 1473 (facilities) and EN 14620 (Tank)
Provision of 1x150,000m3 (net) LNG (pre-stressed Concrete Outer wall) Full Containment Storage Tank
A new Sea Water System (Intake & Outfall) inclusive two (5000 m3/hr) SW Pumps
An additional send-out train consisting
- 4 Low Pressure LNG (500 m3/hr) In-Tank Pumps
- 1 LNG Boil of Gas Recondenser
- 2x High Pressure LNG Pumps
- 2x Open Rack Vaporizers (ORVs)
- Electrical Substation
- Fiscal metering train (450000 Nm3/hr) with tie-ins to existing metering facilities.
TGE SCOPE:
Full EPC in Joint Venture with Local Civil Partner Somague
-
Basic Engineering
Detail engineering
HAZOP and QRA
Procurement/delivery of main equipment
Supervision of construction, precommissioning, commissioning
Performance test
Storage Tank Detail Design
Operator Training
Page 17 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ji Munai, China
Xinjiang Ji Munai Guanghui LNG
Development Ltd. Co.
TGE
2012
05118
PROJECT DESCRIPTION:
TGE SCOPE:
-
Basic Engineering
Procurement/delivery of main
equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 18 of 59
02197// 1.2Mil t/a Methanol and 0.8Mil DME Project Naomaohu China
for
Xinjiang Guanghui New Energy Co. Ltd
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
1.2Mil t/a Methanol and 0.8Mil DME Plant
- Coal gasification
- Methane removal
- Methane liquefaction
- Methanol plant
- DME plant
LNG Storage and Distribution Plant
30,000 m3 LNG StorageTank, single containment
Two submerged intank pumps (320 m3/h; 120 mLC)
Ten truck loading facilities
TGE SCOPE:
-
Page 19 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Concept Design (Pre-FEED) study for an LNG Production and Export Facility with capacity of 20mmtpa in
Phase I, up to 30mmtpa for Phase II. Inclusive Gas Treatment, Liquefaction Process, LNG Storage & Transfer
facilities, Power Generation and Utilities.
Inclusive Process Optimisation, Value Engineering Studies and execution Turn-key cost estimate.
TGE SCOPE:
- Consortium Leader
- Concept Design Storage & Loading
HAZID Assessment
Turn-key Cost Estimate
Page 20 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
LNG Receiving Terminal (EN 1473)
- 2 x 150,000 m LNG Storage Tanks (BS 7777) Full Containment
- 3 x LNG ship loading arms, 1 x vapour return arm
- 2 x submerged LP pumps per storage tank
- 4 x HP send out pumps
- 1 x submerged combustion vaporizer
- 2 x open rack vaporizers
- NG distribution system to the local grid at 80 bar g
- Truck loading system
- Re-liquefaction system
TGE SCOPE:
EPC turn-key -Contractor
Main EPC Activities:
- Basic Engineering
- Construction
- Procurement
Authority Engineering
Detail Engineering
Commissioning
Page 21 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
The project involves the design, engineering, supply, pre-fabrication, installation/ construction and
commissioning/ start-up of Storage and Loading Package for LNG, LPG and Condensate (Export
Terminal).
The LNG export capacity is designed for 5,6 billion m / year.
The project includes 2 LNG storage tanks full-containment type of each 125,000 m net capacity, 1
LPG storage tank of 45,000 m net capacity and 1 condensate storage tank of 75,000 m plus
loading facilities for vessels of up to 160,000 m.
TGE SCOPE:
Consortium leader for the EPC turn-key Contract
Main EPC Activities:
-
Basic Engineering
Construction
Procurement
Authority Engineering
Detail Engineering
Commissioning
Page 22 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 23 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
LNG Receiving Terminal:
- 3 x 160,000 m LNG Storage Tanks
- Marine docking facilities with single berth
- Capable of mooring and unloading LNG Carriers in the class 75,000 m3 to 200,000 m
- Send-out capacity of 6 mtpa
TGE SCOPE:
-
Site selection
Front-end engineering and design services
(FEED)
Page 24 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Natural Gas Treatment and Liquefaction Plant for 1,500,000 Nm3/d
- Feed Gas Compression (8,5 MW)
- CO2 Wash Unit
- Dryer Station
- Feed Gas Liquefaction
- Refrigerant System
- Refrigerant Storage and Make-up
- Gas Turbine (20 MW) as driver for cycle compressor
- Fuel Gas System
LNG Storage and Distribution Plant
30,000 m LNG Storage Single Containment Tank according API 620
Two submerged in-tank pumps (320 m3/h; 120 mLC)
Four truck loading facilities
Six container loading facilities for railway transportation
TGE SCOPE:
-
Page 25 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Sines, Portugal
Transgs Atlntico, Portugal
TGE / Entrepose /Somague Consortium
2003
01431
PROJECT DESCRIPTION:
The terminal is designed for a turn-over of 5,2 109 Nm of natural gas per year equivalent to 600,000
Nm/h at a pipeline pressure of 77 to 80 barg at a high availability level.
Two full containment LNG storage tanks with a net capacity of 120,000 m designed according to BS
7777 and EN1473.
The NG send-out system is designed for a peak send-out of 900,000 Nm/h. The send-out system
consists of submerged in-tank pumps, high-pressure booster pump station, five open rack vaporizers
each with a capacity of 180 tons/h and a metering station.
LNG vaporization system incl. sea water intake equipped with sea water filtering runs, sea water
pumps and electro chlorination system.
LNG unloading facilities including jetty head, unloading berth, LNG ship unloading arms and a ship
gangway allowing to receive LNG carriers between 35,000 m up to 165,000 m.
LNG ship unloading line designed for a max. ship unloading rate of 10,000 m/h.
Truck loading facilities equipped with 2 bays designed to load 3,000 trucks per year. Extension to
6,000 trucks per year is foreseen.
General facilities including main service building, warehouse and utility station.
Design and construction in compliance with European Regulations, European Directives (PED) and
applicable HSE regulations.
TGE SCOPE:
Consortium leader for the EPC turn-key Contract
Main EPC Activities:
- Authority Engineering
- Detail Engineering
- Commissioning
TGE Gas Engineering GmbH Mildred-Scheel-Str. 1 53175 Bonn, Germany
Tel:+49 (0) 228 60448 0 / Fax:+49 (0) 228 60448 0
www.tge-gas.com / tge-service@tge-gas.com
Construction
Procurement
Page 26 of 59
B)
Page 27 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Grangemouth, Scotland
Ineos UK
TGE
2016
05422
PROJECT DESCRIPTION:
TGE SCOPE:
-
FEED
Basic and detailed engineering
Procurement and construction
Pre-commissioning
Commissioning and start-up
Page 28 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Shanghai, China
Shanghai Chlor Alkali Chemical Co., Ltd.
TGE
2014
05234
PROJECT DESCRIPTION:
30,000 m3 Ethylene storage tank full containment (steel/steel)
Cascade boil-off gas reliquefaction system with propylene cycle, with two stage oil free reciprocating
Compressor for Ethylene and skid mounted screw compressor system for propylene as refrigerant.
300 m3/h ship unloading and 200 m3/h ship loading system with 4,300 m ship unloading/loading line
Two send out in-tank pumps and one future ship loading in-tank pump
Send out system (27 t/h) with two Ethylene evaporator
Condensation of Chlorine vapours (40 t/h) against evaporating ethylene and sent out of Chlorine liquid
to downstream plant
TGE SCOPE:
-
Basic Design
Procurement / delivery of main equipment
Supervision of Construction. PreCommissioning, Commissioning and
Performance tests
Page 29 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
New full containment tank 35,000 m working capacity (T-4902) PC Outer/ 9 % Nickel Inner
New 12 loading arm at Jetty 1 with 16 unloading line to new tank and tie-in to existing tank.
New BOG compressor (K-4902) for new tank (T4902) discharging compressed gas to existing cracker
New BOG compressor (K-4903) for existing tank (T-4901) to increase the possible unloading rate and
discharging compressed gas to existing cracker
2 x 100% in-tank pumps (P-4904A/B) in new tank, plus spare column for future extension.
New flare system (X-9803) associated with T-4902.
TGE SCOPE:
-
Construction
Pre-commissioning, commissioning and
Performance test
Page 30 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ningbo, China
Ningbo Hai Yue New Material Co., Ltd.
TGE
2014
05265
PROJECT DESCRIPTION:
120,000 m3 Propane Storage Tank (full containment, steel/concrete) with tank bottom heating system.
Two propane re-liquefaction systems.
Two sent- out In-tank pumps.
One booster pump
Ship unloading system 1500 t/h with 4000 m ship unloading line.
Propane sent out system to PDH Plant.
Propane sent out system to spherical tanks via propane heater system.
TGE SCOPE:
-
Basic Design
Procurement / delivery of main equipment
Supervision of Construction, PreCommissioning, Commissioning and
Performance tests
Page 31 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
-
TGE SCOPE:
-
Page 32 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Samsun, Turkey
Toros Tarim Sanayi Ve Tricaret A. S.
Tekfen Engineering Co., Inc. Istanbul, Turkey
2013
05222
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 33 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
Basic Engineering for the tank farm, detail engineering for 50,000 m full containment Ethylene
Storage Tank
Procurement of complete steel materials for Ethylene storage tank both for inner and outer tank plus
internals and insulation materials
Procurement for rotating equipment including refrigerant compressor, compressor, vertical
reciprocating labyrinth, Ethylene in-tank LP pump, Ethylene HP pump
Ship loading/ unloading arm
Instrumentation and technical services of design supports, installation, training and commissioning
TGE SCOPE:
-
Engineering
Procurement
Construction Supervision
Operator Training & Start-up
Page 34 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Taixing, China
Singpu Chemical Industries Co. Ltd.
TGE
2013
05177
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 35 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
EPCS Contract including:
2 x 20.000 m3 Full Containment Tank (steel/steel)
Ship Loading system
Transfer Pipe rack to Jetty
Flare System
Product Chiller system
BOG handling system
TGE SCOPE:
-
Page 36 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
EPC Contract including:
TGE SCOPE:
-
Page 37 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ningbo, China
Ningbo Refrigerated Gas Storage &
Transportation Co. Ltd
TGE
2011
05074
PROJECT DESCRIPTION:
Ethylene Storage Tank:
- 1 x 20,000 m Ethylene Storage Tank full containment, PC outer/ inner steel tank
- Full containment type in accordance with EN 14620
- Composite storage system consisting of metallic steel part, concrete part, insulation part
- Inner tank is designed as a single wall flat bottom tank without a roof
- Outer tank is a flat bottom tank and a pre-stressed concrete wall with a steel liner of the
outer tank wall
- Roof is a domed steel roof supported on the outer tank wall with a suspended deck for the
insulation
TGE SCOPE:
-
Basic Engineering
Procurement/delivery of main
equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 38 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ningbo, China
SINOPEC Zhenhai Refining & Chemical
Company
TGE
2010
02180
PROJECT DESCRIPTION:
30,000 m3 Ethylene Storage single containment Tank acc. API 620 with submerged in-tank pumps
Ship unloading/loading system with 8 km long ship loading/unloading line
Ethylene receiving system from cracker
Ethylene high pressure pump system
Ethylene vapour sent out system (150 t/h) to down-stream plants
Ethylene BOG handling system
20,000 m3 Propylene Storage single containment Tank acc. API 620 with submerged in-tank pumps
Propylene receiving system from cracker
Propylene high pressure pump system
Propylene (heated) send- out system (75 t/h) to down-stream plants
Propylene BOG handling system
TGE SCOPE:
-
Basic Engineering
Procurement/delivery of main
equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 39 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
2009
02017
PROJECT DESCRIPTION:
Two 80,000 m3 double wall type LPG tanks, full containment according API 620
Equipment Details:
5 x BOG units oil flooded screw type
3 x BOG oil free reciprocating compressors
8 x send-out in-tank pumps
1 x LPG evaporator
2 LPG heater with steam as heat medium and ethanol as inter medium
Process facilities for BOG re-liquefaction and send-out heating for Propane and Butane
TGE SCOPE:
-
Page 40 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
20,000 m ethylene storage tank (single containment) according API 620
Cascade boil-off gas reliquefaction system with propylene cycle, with two-stage oil free reciprocating
compressors for ethylene and one skid mounted screw compressor system for propylene as refrigerant
Ship unloading system 350 m/h with 1,000 m ship unloading line
Two send-out pumps with a normal capacity of 16 t/h
One truck loading pump with a normal capacity of 22 t/h
Send out system with one ethylene evaporator of 16 t/h
Two truck loading bays
TGE SCOPE:
-
Basic Engineering
Procurement /delivery of main equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 41 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ningbo, China
Formosa Petrochemical Corporation, Taiwan
TGE
2007
01740
PROJECT DESCRIPTION:
Propylene Storage Tank:
- 1 x 80,000 m Propylene Storage Tank
- Full containment type in accordance with BS7777
Equipment Details:
- 3 x BOG oil free reciprocating compressors
- 2 x in-tank pumps
- 2 x condensate pumps
- 2 propylene heaters with steam as heat medium and n-butane as inter medium
TGE SCOPE:
Main EPC Turn-key contractor:
- Process design
- Project Management
- Construction supervision & training
Detail Engineering
Procurement
Start-up
Page 42 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Ningbo, China
Formosa Petrochemical Corporation, Taiwan
TGE
2007
01840
PROJECT DESCRIPTION:
Ethylene Storage Tank:
- 1 x 80,000 m Ethylene Storage Tank
- Full containment type in accordance with BS7777
Equipment Details:
- 2 x refrigeration units oil flooded screw type
- 3 x BOG oil free reciprocating compressors
- 2 x LP in-tank pumps
- 2 x HP booster pumps
- 2 ethylene evaporators with steam as heat medium and n-butane as inter medium
TGE SCOPE:
Main EPC Turn-key contractor:
- Process design
- Project Management
- Construction supervision & training
Detail Engineering
Procurement
Start-up
Page 43 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
20,000 m ethylene storage tank (single containment) according API 620
Cascade boil-off gas re-liquefaction system with propylene cycle, with two-stage oil free reciprocating
compressors for ethylene and one skid mounted screw compressor system for propylene as refrigerant
Ship unloading system 500 m/h with 1,000 m ship unloading line
Two send-out pumps with a normal capacity of 6 t/h
Two booster pumps with a normal capacity of 7 t/h
One condensate pump with a normal capacity of 2 t/h
One truck loading pump with a normal capacity of 22 t/h
Send out system with one ethylene evaporator of 6 t/h
One truck loading bay
TGE SCOPE:
-
Basic Engineering
Procurement /delivery of main equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 44 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
2006
01712A
PROJECT DESCRIPTION:
Two 80,000 m3 refrigerated ethylene storage and transfer system consisting of storage tanks as full containment
type as per BS 7777, T-025 A/B at OL-3 area and facilities for filling, re-liquefaction and send-out service
Equipment Details:
2 x refrigeration units oil flooded screw type
3 x BOG oil free reciprocating compressors
8 x in-tank pumps
1 x ethylene heater
2 ethylene evaporators with steam as heat medium and n-butane as inter medium
Process facilities for BOG re-liquefaction and send-out evaporation for Ethylene.
TGE SCOPE:
Main EPC Turn-key Contractor
Main EPC Activities:
-
Basic Engineering
Detail Engineering
Commissioning
Construction
Procurement
Operator Training
Page 45 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
2006
01712B
PROJECT DESCRIPTION:
One 80,000 m3 refrigerated propylene storage and transfer system consisting of storage tank T-880 at jetty
area and facilities for filling, re-liquefaction and send-out service
Tank design as full containment type as per BS 7777
Equipment Details:
3 x BOG oil free reciprocating compressors
5 x in-tank pumps
2 propylene heaters with steam as heat medium and ethanol as inter medium
Process facilities for BOG re-liquefaction and send-out heating for Propylene.
TGE SCOPE:
Main EPC Turn-key Contractor
Main EPC Activities:
- Basic Engineering
- Detail Engineering
- Commissioning
Construction
Procurement
Operator Training
Page 46 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Kallo, Belgium
Antwerp Gas Terminal N.V.
TGE
2005
01582
PROJECT DESCRIPTION:
4 earth covered cylindrical storage tanks with a total geometrical volume of 12,000 m design
pressure 17 bar g, material P355NL2
2 x 3,000 m Butadiene storage tanks
2 x send out pumps to pipeline
2 x circulation pumps
Tank rail car unloading station
Terminal extension / connection to jetties unloading
2 x 3,000 m Propylene Storage tanks
2 x transfer pumps
TGE SCOPE:
-
Procurement
Commissioning
Page 47 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Zapu, China
Jiaxing Sanjiang Chemical Co., Ltd.
TGE
2005
01754
PROJECT DESCRIPTION:
20,000 m ethylene storage tank (single containment) according API 620
Cascade boil-off gas re-liquefaction system with propylene cycle, with two-stage oil free reciprocating
compressors for ethylene and one skid mounted screw compressor system for propylene as refrigerant
Ship unloading system 300 m/h with 2,000 m ship unloading line
Two send-out pumps with a normal capacity of 28 t/h
One truck loading pump with a normal capacity of 22 t/h
Send out system with two ethylene evaporators of each 10 /h
Two truck loading bays
TGE SCOPE:
-
Basic Engineering
Procurement /delivery of main equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 48 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
PROJECT DESCRIPTION:
5 horizontal pressure vessels acc. to Chinese standard GB 150 made from 5% Ni steel (X12Ni19),
4,650 x 80,000 mm, design pressure -1 / 23 bar g, design temp.-104 / +55 C
Full flexibility for all tanks
Product import system for on-spec. and off-spec. ethylene from cracker as well as for on-spec.
Ethylene from cold storage
Product send-out system for liquid on-spec. Ethylene to downstream plants and to cold storage, liquid
off-spec Ethylene to cracker
Ethylene vaporiser and send out system to downstream plants
TGE SCOPE:
-
Procurement
Commissioning
Page 49 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Damietta, Egypt
United Gas Derivatives Company, UGDC
Consortium of TGE / ENPPI
2004
01518
PROJECT DESCRIPTION:
30,000 m Propane tank (full containment)
2 Feed Chilling Packages:
- 1st Stage Refrigeration Package (refrigerant: propane) for feed chilling and BOG
- Re-liquefaction comprising three oil-injected screw compressors (one spare) for required
refrigeration duty of 3,200 kW
- 2nd Stage Refrigeration Package (refrigerant: propane) for feed chilling comprising three oilinjected screw compressors (one spare) for required refrigeration duty of 1,000 kW
Propane BOG Re-liquefaction System comprising two oil-injected screw compressors (one spare) for
required refrigeration duty of 1,000 kW
Jetty for gas carriers, min. 15,000 m to 80,000 m
Ship loading system for 1,600 m/h comprising two in-tank pumps (one spare) of 1,600 m/h, one
metering skid for 3,200 m/h and one 12 loading arm for 1,600 m/h
TGE SCOPE:
-
Front-end engineering
Envid/ Hazid/ Hazop and Risk Assessment
Assisting in Pre-Commissioning,
Commissioning, Start-up and Performance
Tests
Detail engineering
Procurement
Construction management
Page 50 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Huludao, China
Huludao Jinfeng Ethylene Co., Ltd.
TGE
2002
01314
PROJECT DESCRIPTION:
10,000 m ethylene storage tank (single containment) according API 620
Cascade boil-off gas re-liquefaction system with propylene cycle, with two-stage oil free reciprocating
compressors for ethylene and one skid mounted screw compressor system for propylene as refrigerant
Ship unloading system 300 m/h with 4,500 m ship unloading line
Two truck loading bays
TGE SCOPE:
-
Basic Engineering
Procurement /delivery of main equipment
Supervision of detail engineering,
construction, pre-commissioning,
commissioning, performance tests
Page 51 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
2001
01114
PROJECT DESCRIPTION:
Three 80,000 m full-containment type tanks made of low temperature carbon steel for the inner tank
container and of pre-stressed concrete wall with steel liner for the outer tank, domed roof with
concrete cover and suspended deck installation, acc. to API 620 Appendix R.
Each tank : Three submerged motor in-tank pumps with send out capacities of 330 t/h each for
coastal tanker loading or to a distribution system for truck loading and one submerged motor in-tank
pump of 800 t/h for semi-refrigerated tanker loading
Ship unloading rate of 1,200 t/h
Boil-off gas reliquefaction systems with three two-stage screw compressor systems for LPG Propane
and three single stage screw compressor systems for LPG Butane service.
TGE SCOPE:
Consortium leader for the turn key contract
Main EPC Activities:
-
Basic Engineering
Construction
Procurement
Authority Engineering
Detail Engineering
Commissioning
Page 52 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Tarragona, Spain
BASF Espaola S.A.
TGE
2001
01097
PROJECT DESCRIPTION:
40,000 m LPG Storage tank (double containment) surrounded by a pre-stressed concrete wall.
Ship unloading system (1,300 t/h)
Sea water system
Two send-out pumps with a normal capacity of 57 t/h
Reliquefaction system (two oil injected screw compressors) for compression of BOG.
Send out pipeline of 5 km to PDH-Plant.
TGE SCOPE:
Main EPC Turn-key Contractor
-
Basic Engineering
Detail Engineering
Procurement
Authority Engineering
Construction
Commissioning
Page 53 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
1999
01067
PROJECT DESCRIPTION:
Two 30,000 m double wall, double roof tanks made of 9% Ni-steel for the inner tank and of prestressed concrete with steel liner for the outer tank acc. to API 620 Q
Nine submerged motor in-tank pumps with send out capacities between 56 and 180 t/h
Ship unloading rate of 250 - 300 t/h
Cascade boil-off gas re-liquefaction systems with propylene cycle, with three three-stage oil-free
reciprocating compressors for ethylene and two skid mounted screw compressor systems for propylene
as refrigerant
TGE SCOPE:
Main EPC Turn-key-Contractor:
- Basic Engineering
- Detail Engineering
- Construction
Authority Engineering
Procurement
Commissioning
Page 54 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao, Taiwan
Formosa Petrochemical Corporation, Taiwan
TGE
1995 - 1999
0941
PROJECT DESCRIPTION:
Storage tanks:
- 80 earth covered cylindrical storage tanks with a total capacity of 234,000 m
Tank capacities:
- 1,000 m - 4,000 m; design pressures: 6 18 bar g, design code: ASME Sec. VIII, Div. 2
Tank material:
- A 537 CI. 2, A 516 Gr. 70
Products:
- LPG / Propylene / VCM/ C4-mix/ Butane
TGE SCOPE:
-
Page 55 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Mailiao TAIWAN
Formosa Petrochemical Corporation
TGE
1998
0883
PROJECT DESCRIPTION:
TGE SCOPE:
-
Page 56 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Zapu, China
SINOPEC Shanghai Golden Conti Co. Ltd.
TGE
1999
0867
RROJECT DESCRIPTION
Primary Site:
- 2x 50,000 m3 Refrigerated double containment Tanks for Butane and Propane storage with In-tank
Pumps
- Ship Unloading facilities, -BOG Re-liquefaction facilities for Propane and Butane
- Propane Heating facilities; -Coastal Tanker Loading facilities;-Transfer Booster Pumps
- Send- out to Spherical Tanks (Secondary Site)
- Utility Plants: Instrument Plant, Nitrogen Plant, Cooling Water Plant and Fire Water Plant
Secondary Site:
- 4x 1,500 m3 Spherical LPG Tanks; Propane and Butane Pumping Facilities
- 8 Truck Loading Stations; -2 Bottle Filling Plants (one for 15 kg bottles and one for 50 kg bottles)
- Utility Plants: Instrument Plant and Fire Fighting Plant
Transfer Pipelines from Primary Site to Secondary Site:
- One 35 km long Pipeline for transferring pressurised liquid Butane
- One 35 km long Pipeline for transferring pressurised liquid Propane
- Blending (mixing of propane and butane) facilities located on secondary site
TGE SCOPE:
Main EPC Turn-key Contractor:
- Basic Engineering & Detail Engineering
- Construction
Procurement
Commissioning
Page 57 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Antwerp, Belgium
BASF - Antwerp N.V.
TGE
1995
0614
PROJECT DESCRIPTION:
One 50,000 m double containment storage tank acc. to DIN 4119 made of low temperature carbon
steel with a retaining wall of pre-stressed concrete
Two submerged motor in-tank pumps with a send out capacity of total 110 t/h
Ship unloading rate of 1,500 t/h
One direct boil-off gas reliquefaction system with two stage oil-free reciprocating compressors
TGE SCOPE:
Main EPC Turn-key Contractor:
-
Basic Engineering
Detail Engineering
Construction
Authority Engineering
Procurement
Commissioning
Page 58 of 59
PROJECT DATA:
Location:
Owner:
Contractor:
Year of Completion:
TGE Project Number:
Antwerp, Belgium
BASF - Antwerp N.V.
TGE
1992
0347
PROJECT DESCRIPTION:
One 15,000 m3 full containment storage tank acc. to DIN 4119; inner tank made of 9% Nickel steel;
outer tank made of pre-stressed concrete with a low temperature carbon steel liner
Two submerged motor in-tank pumps
Four suction vessel pumps (submerged motor type)
Ship unloading rate of 400 t/h
Three cascade boil-off gas reliquefaction systems with propane refrigeration cycle
Send out capacity: 37,5 t/h at 100 bar to ARG-network and 75 t/h at 25 bar to BASF-network
TGE SCOPE:
Main EPC Turn-key Contractor:
- Basic Engineering
- Authority Engineering
- Construction
Detail Engineering
Procurement
Commissioning
Page 59 of 59