An Overview of the Electricity Industry in

Myanmar

Vikas Sharma, PMP


Associate Director,
Public Sector & Government Practice, Frost & Sullivan
December, 2013

Vikas Sharma, PMP

Page 1

Section 1 Introduction
Myanmar is the second-largest country in South East Asia, with a strategic geographic location bordering India,
China, Thailand, Laos and Bangladesh. 70% of its 60-million strong population is rural. At USD 715,
Myanmars GDP/capita is among the lowest in the region. Myanmar is ranked near the bottom on the UN
Human Development Index too. The economy is predominantly agrarian and agriculture accounts for >70% of
employment.
Myanmar was riddled with deep economic sanctions for nearly three decades as the international community
reacted to oppression of democratic liberties in the country. With restrictions on foreign investment and lack of
assistance from multilateral organizations, Myanmars economy lagged behind its potential. With a new
government taking office in 2011, Myanmars foreign relations have improved. Sanctions are increasingly
being lifted and assistance has started pouring in from ADB and World Bank.
As Myanmar embarks upon reversing the damage and realizing its potential, availability of electricity is crucial
in all spheres economic, health-related and educational. However, nowhere is the immensity of the task at
hand more apparent than in the electricity sector. Less than 30% of households are connected to the electricgrid. Per capita consumption of power is lowest in ASEAN. There is over-reliance on hydropower and erratic
demand-side management, especially in summer months. Current supply is almost 30% below demand,
manifested in sweeping load-shedding. Planning is centralized, haphazard and seemingly untouched by market
dynamics. Power plants have numerous breakdowns and abysmal efficiency. Transmission and distribution
networks are antiquated and omit large expanses. Highly-subsidized electricity tariffs and resulting fiscal
deficits have crippled public investment in infrastructure. Skepticism over political stability, heavy-handed
government terms, and deficient financing ecosystem discourage private entrants.
This paper attempts to provide a comprehensive current-state assessment of Myanmars electricity sector, and
goes on to offer some policy recommendations to tackle the key issues at hand.
Vikas Sharma, PMP

Page 2

Section 2 Current-State Assessment


This section aims to provide a comprehensive discussion on Myanmars electricity industry, touching upon industry structure, generation, transmission & distribution, pricing, consumption highlighting key trends and
issues for each, and also future plans.

a) Industry Structure
The regulatory framework is laid down by the Electricity Act of 1948, the Myanmar Electricity Law (1984),
and the Electricity Rules (1985). The power sector is centralized; and is primarily under the control and
management of government enterprises.
Key Entities Involved:
Ministry of Electric Power (MOEP) was formed in September 2012 with the merger of two erstwhile ministries
MOEP1 and MOEP2. Before the merger:
1) MOEP1 was responsible for developing, implementing, operating and maintaining all large
hydropower and coal-fired thermal power plants
2) MOEP2 was responsible for a) developing, operating and maintaining the transmission and
distribution systems, b) operating and maintaining gas-fired thermal power plants, and c) planning,
implementing and operating mini-hydropower plants
Post-merger, MOEP comprises seven distinct department-level organizations:
1) Department of Hydropower Planning (DHPP): plans hydropower projects to be implemented by
MOEP itself, by local enterprises, or by joint ventures with foreign investors
2) Department of Hydropower Implementation (DHPI): has four institutes dedicated to design and
investigation; and seven construction companies capable of undertaking large hydropower projects
Vikas Sharma, PMP

Page 3

3)

Hydropower Generation Enterprise (HPGE): participates in operation and maintenance of


hydropower and coal-fired plants owned by MOEP and under joint ventures

4) Myanmar Electric Power Enterprise (MEPE): develops, operates and maintains transmission
networks and gas-fired power plants
5) Department of Electric Planning (DEP): carries out power-system strategic planning
6) Yangon City Electricity Supply Board (YESB): distributes power to consumers in Yangon
7) Electric Supply Enterprise (ESE): distributes power to rest of Myanmar, including off-grid
generation and distribution; and plans, implements and operates mini-hydropower and diesel stations
Other relevant ministries include
a) Ministry of Energy in charge of oil and gas management
b) Ministry of Mines in charge of coal
c) Ministry of Forestry responsible for biomass and fuelwood
d) Ministry of Science and Technology responsible for renewable energy
Other than joint-ventures, the government has also been encouraging private investment in electricity
generation with its Independent Power Producer (IPP) system, especially in areas off the national grid.
Industry Value Chain:
The Myanmar power industry can be explained using the standard 3-part power-sector value chain as below:
1) Generation: Power is generated by three entities
a. HPGE and its joint ventures with foreign investors - coal-fired thermal power and hydropower
b. Independent Power Producers (IPPs) mostly mini-hydropower and diesel power stations
c. ESE mini-hydropower and diesel power stations
d. MEPE gas-fired power

Vikas Sharma, PMP

Page 4

2) Transmission: All power generated is passed on to MEPE that then transmits it over its networks
3) Distribution: Power is then distributed to local end-customers by YESB and ESE. A significant
amount is also exported to Thailand and China

Generation

HPGE

MEPE

JV/IPP

ESE

Transmission

MEPE

End
Customers

Distribution

ESE

YESB

b) Power Generation
Overview:
Total power generated on the Myanmar grid in 2012 was 10,800 GWh, an impressive 58% increase on the 2009
number. Hydropower accounted for 71%, followed by gas-fired thermal power and coal-fired thermal power.
The mix has changed considerably from 1995 when 50% of total power generated was gas-fired.

Total Power Generation


(GWh)
10,034

Total Power Generation


(by Type)

Gas
26%

10,804

7,810

Coal
2%

6,830
Hydro
71%

2009

Vikas Sharma, PMP

2010

2011

2012

Page 5

Total installed capacity for Myanmar stood at 3896 MW in 2012, split among the 3 sources in a similar ratio as
that for generated power. If operating at full capacity, the grid should be able to generate close to 34,100 GWh.
However, actual generated power in 2012 was just 10,800 GWh. Several issues contribute to this inefficiency:
1) Plants across the three types have several operational issues and need to be shut down frequently for
maintenance. This is especially severe for gas-powered plants that also suffer from lack of compression
in pipelines
2) Due to lack of water, hydropower plants are unable to operate at full capacity during the dry season.
With hydropower being the chief power source, this leads to major fluctuations in total generation. For
instance, monthly output in May 2012 (peak dry season) was 792 GWh, almost 20% less than in
October 2012 (peak wet season) at 981 GWh
To manage shortfalls, frequent rolling blackouts (lasting 12-16 hours a day in some regions) are implemented
across the country, especially during summer months when demand for electricity far outstrips supply.
The following sub-sections provide an overview of key power generation sources, touching upon existing
installed capacities, issues and future plans.
1) Hydropower:
Myanmar has 20 grid-connected hydropower plants; all operated by HPGE. Their installed capacity of 2,780
MW accounts for 71% of national capacity. Off-grid supply from mini-hydropower stations is provided by ESE
and IPPs, but is miniscule at just 33MW.

Vikas Sharma, PMP

Page 6

Existing Hydropower Plants in Mynamar (>50MW)


Station
Yeywa
Shweli-1
Paunglaung
Dapein-1
Baluchaung-2
Thauk-ye-khat
Mone
Shwegyin
Kyeeon Kyeewa
Kun
Kinda
Keng Taung
All others
Total

Installed Capacity (MW)


790.0
600.0
280.0
240.0
168.0
120.0
75.0
75.0
74.0
60.0
56.0
54.0
188.0
2,780.0

During the wet season (June-September), the stations are able to generate at optimum capacity. However, in the
dry season, insufficient water storage leads to production drops that necessitate significant load-shedding.
Going forward, MOEP is developing 20 hydropower projects, 14 of which involve investments from China
and Japan. The China Power Investment Corporation (CPI) has invested USD 25.6 billion to build 7 stations in
the upper reaches of Irrawady River. Loans worth USD 1.7 billion have been agreed from the Export-Import
Bank of China and China Development Bank.
2) Gas-fired
Myanmar has 10 gas-fired power plants; all operated by MEPE. Their installed capacity of 996 MW accounts
for 26% of national grid capacity. Ahlone is the biggest plant with 275 MW capacity. These plants use gas
produced in the offshore fields of Yadana and Yetagun, and from the onshore fields operated by Ministry of
Energy. Output from these plants has been below expectations owing to low calorific value of local gas (high
Nitrogen content) and low pressure without compression.

Vikas Sharma, PMP

Page 7

Existing Gas-fired Plants in Mynamar


Station
Kyungchaung
Mann
Shwedaung
Mawlamyaing
Myanaung
Hilawga
Ywama
Ahlone
Thaketa
Thaton
Total

Installed Capacity (MW)


54.3
36.9
55.3
12.0
34.7
208.7
122.3
275.2
145.6
51.0
996.0

Going forward, MOEP intends to focus on gas-power to reduce reliance on hydropower. In its official fiveyear-plan, MOEP has set an ambitious target to add >2500MW capacity by 2015-16. One key upcoming
development is a 500MW plant set to complete end-2014. It will supply power to the Thilawa Special
Economic Zone (SEZ) that is being jointly developed by Myanmar and Japan. Also, the World Bank lent USD
140 million in September 2013 to upgrade and add 125MW capacity to Thaton station.
3) Coal-fired
Currently, Mynamar has one coal-fired thermal power plant Tigyit with an installed capacity of 120 MW. It
suffers from severe efficiency issues, generating power at an average capacity factor of just around 30%.
Going forward, MOEP aims to add 300 MW capacity by 2015-16. In a key development, World Bank
sanctioned a USD 165 million loan in early 2013 to develop coal-fired plants.
4) Non-hydro renewable sources
Using non-hydro renewable sources for power generation is still in its infancy in Myanmar and constitutes a
small percentage of total installed capacity and generation. While Myanmar is rich in renewable resources,
development remains severely hampered by limited availability of funds to support R&D; lack of a clear
renewable energy policy; and lack of talented manpower.
Vikas Sharma, PMP

Page 8

Bio-mass: There are 174 MW of biogas power projects operational


Geothermal: Close to 90 geothermal locations have been identified to date. Of these, 43 are being tested by
MOEP along with Electrical Power Development Company of Japan, as well as Union Oil Company of
California
Wind Energy: Wind-power projects are either in experimental phase or undergoing feasibility determination.
There are some very small operational projects off the grid (Dattaw Mountain in Kyaukse, and Government
Technical High School in Ahmar, Ayeyarwaddy). Gunkul Engineering Public Company Limited and China
Three Gorges Corporation, both foreign, signed a MOU with MOEP in 2011 to conduct feasibility studies for
the development of 4,032 MW of wind energy in Myanmar
Solar Energy: Some pilot PV cell projects financed by MOEP and university reseach departments are underway
in rural areas; being used to charge batteries and pump water for irrigation. Another example is the installation
of 3KW PV systems in remote schools by Mandalay Technological University. Overall, however, at current
costs, solar energy is unaffordable.
Overall Assessment
Given Myanmars fiscal condition, upgrading and expansion of generation infrastructure depend heavily on
securing foreign investments and loans. With the lifting of sanctions, loans from multi-lateral organizations
have started coming in. Significant investments have been promised by Japan and China. However, continued
progress on both grounds relies on how soon Myanmar can convince the international community of its political
stability and of its efforts to introduce clear policies and institutional frameworks.

Vikas Sharma, PMP

Page 9

f) Power Transmission and Distribution


The transmission network is the responsibility of the MEPE. Major power stations feed electricity into the
national grid using 230kV, 132kV, and 66kV overhead transmission lines. These lines are predominantly single,
with very few double lines. As of 2012, the total network length was almost 9,000km. The figure below shows
the networks composition by voltage types.

Existing Transmission Lines (2012)


Voltage (kV)
230
132
66
Total

Num of Lines
51
40
137
228

Length (km)
2,983
2,289
3,614
8,886

Over long distances, 230kV transmission systems suffer from high voltage drops, sometimes exceeding 10%.
To remedy this situation, MOEP has announced plans to build a 500kV system under its five-year plan from
2011-12 to 2015-16. This new system aims to connect Myanmars power generation plants in the north to main
load centers in the south. Addition to other capacity lines is also being planned to improve the electrification
ratio. Details are given below:

Planned expansion - Transmission Lines


Voltage (kV)
500
230
132
66
Total

Num of Lines
3
28
3
58
92

Length (km)
313
2,227
64
1,900
4,504

Planned expansion - Substations


Voltage (kV)
500
230
132
66
Total

Vikas Sharma, PMP

Num of Lines Capacity (MVA)


3
1,500
30
3,420
10
1,030
73
748
116
6,698

Page 10

The distribution network is primarily controlled by YESB and ESE:


1) YESB supplies to all customers in Yangon City
2) ESE supplies electricity (including that produced in off-grid generation) to rest of Myanmar,
comprising 13 states and regions
The distribution system consists of low-voltage levels like 33kV, 11kV, 6.6kV, and 0.4kV. Lines connect to
distribution transformers that supply both single-phase and three-phase 400/230V power.

Existing Distribution Lines (2012)


Voltage (kV)
33
11
6.6
0.4

Capacity (MVA)
3,697
3,719
1,593
NA

Length (km)
6,743
12,781
1,435
15,469

Total

9,009

36,428

While distribution losses have shown improvement recently, losses incurred are still high due to outdated and
dilapidated infrastructure, and its insufficient cross-section for present-day loads.
22.3%

Distribution Losses (%)

21.6%
19.6%
19.2%
19.4%
18.2%

2007

2008

2009

2010

2011

2012

In view of this, ESE is planning infrastructure upgrades:


a) Several 6.6kV systems are to be converted to 11kV systems to reduce losses and improve efficiency,
b) Over 2013-14, ESE plans to expand the 33kV network by 400km, 11kV network by 360km, and 6.6kV
network by 250km

Vikas Sharma, PMP

Page 11

Running low on available funds, the government is actively soliciting private sector participation in these
upgrading exercises for transmission and distribution networks.

Update November 2013: Asian

Development Bank (ADB) offered Myanmar a cheap long-term loan of USD 60 million to build new
transmission infrastructure outside Yangon and Mandalay, which should significantly reduce electricity losses.
The loan term is 24 years at 1.5%/annum interest.

g) Power Pricing
Tariffs in Myanmar are among lowest in the ASEAN region. Traditionally, they have followed this structure:
1) The two power distributors YESB and ESE purchase grid-electricity from MOEP and supply it to
end-customers at two broad tariffs: 1) 35 Kyats (~3 US cents)/kWh for households 2) 75 Kyats (~7 US
cents)/kWh for businesses. Foreigners are charged a premium rate of 12 US cents/kWh.
2) Tariffs for off-grid power vary widely depending on cost of generation (by means such as diesel, minihydropower, solar etc.) from anywhere between 100 Kyats (~9 US cents) to 300 Kyats (~27 US cents).
Sellers have to pay a royalty of 20-25 Kyats (2-2.5 US cents) per kWh to ESE.

2011 Electricity Prices by Country (US cents/kWh)


Country
Indonesia
Malaysia
Myanmar
Singapore
Thailand
Vietnam

Residential
4.60-11.74
7.26-11.46
3.09
19.76
5.98-9.90
2.91-9.17

Commercial
5.93-12.19
9.67-11.10
6.17
10.95-18.05
5.55-5.75
4.38-15.49

Industrial
5.38-10.14
7.83-10.88
6.17
10.95-18.05
8.67-9.43
2.30-8.32

In essence, power is being provided at highly subsidized prices (lower than average cost which is estimated at
125 Kyats/kWh). MOEP estimates the size of annual subsidy at 185 billion Kyats (~USD 170 million). With
MOEP making losses, available public funds to expand power generation and distribution infrastructure have
seen severe downward pressure. Consequently, increase in power generation capacity has not been able to keep
Vikas Sharma, PMP

Page 12

up with increasing demand. MOEP minister Khin Maung Soe, in November 2013, said that MOEPs inability to
recover costs has directly contributed to its failure to build 7 hydropower, 3 thermal, and 2 coal-fired plants that
had been originally planned. Needless to say, low prices have also deterred IPPs from entering the power
generation market. The net effect has been that Myanmar has cheap power but not enough of it available,
manifested in low electrification ratios and frequent load-shedding blackouts.
Update - Revision to Pricing (October, 2013)
On 29th October, 2013, YESB announced price hikes for both households and businesses, effective 1st
November. MOEP explained that the decision was made to better cover rising costs of electricity production, to
encourage private investment, and to fund an expansion of the national grid. Under the revised structure:
1) Households consuming more than 100 kWh/month will pay 50 Kyats/kWh, up from 35 Kyats/kWh
2) Businesses consuming up to 5000 kWh/month will see their rates increased to 100 Kyats/kWh, up from
75 Kyats/kWh previously. Those consuming more than 5000 kWh/month will pay 150 Kyats/kWh, a
100% increase over the previous tariff
This price hike met with strong criticism from lawmakers, manufacturers and public alike, with several
businesses under the threat of closing down due to increased costs. Analysts have warned of higher operating
costs translating into higher prices for consumer goods. Following the controversial arrests of six activists and a
parliamentary plea to review the hike, authorities have postponed it to fiscal year 2014-15. MOEP has also
commissioned a public opinion survey on the proposed hike, with results to be reported to the parliament.

Vikas Sharma, PMP

Page 13

g) Power Consumption
Over 2001-2011, total power consumption almost doubled from 3,270GWh in 2001 to 6,300GWh in 2011, at an
average annual growth rate of around 6.8%. Over the same period, per capita consumption rose from around
72kWh to 130kWh, at an average annual growth rate of 6%.
6,300
GWh

Total Power Consumption

3,270
GWh

Power Consumption by User Segments (2011)


Others
2%
Commerce
20%

2001

2011

Residential
42%
130 kWh

Industry

Per Capita Power Consumption

36%

72 kWh

2001

2011

The biggest end-user segment is Residential, accounting for around 42% of total consumption, followed by the
Industry (36%) and Commerce (20%). By region, Yangon City accounts for around 45% of total electricity
consumption from the grid, followed by Mandalay City at 16%.
Per capita consumption in Myanmar, while improving, is still lowest among all ASEAN countries. As discussed
elsewhere in this paper, this is primarily due to low degree of electrification. Myanmars electrification ratio is
around 30%, with rural areas at an abysmal 16%. Even in relatively developed urban areas of Yangon City, Nay
Pyi Taw and Mandalay, the ratio ranges from 30% to 65%.

Vikas Sharma, PMP

Page 14

The central planning approach used by Myanmar essentially bases demand and supply estimates on how many
new power development projects can be implemented in the years of focus; and seems to overlook linkages to
resource availability, technical specifications and changing customer dynamics. This approach is based entirely
on supply availability and the assumption that all power generated will be consumed or exported. Governmentled forecasts of power demand have been criticized for being too infrequent, overly simplistic in their scenario
building, and not cognizant of changing energy needs. The last projection exercise was done in 2001 and
included 3 scenarios 1) low scenario where demand doubles every 10 years 2) base scenario where demand
growth follows Thailands and 3) high scenario based on GDP growth of 7% per annum. Not surprisingly, these
forecasts have proven unreliable and severely underestimated actual demand.

Vikas Sharma, PMP

Page 15

Section 3 Policy Recommendations


Having assessed various aspects of Myanmars electricity sector, and their associated issues in Section 2, this
section provides some policy recommendations for consideration. Given the number and severity of issues, it is
tempting to throw the proverbial kitchen sink of policy measures at them. However, a conscious attempt has
been made to keep suggested measures rooted in pragmatism and cognizant of Myanmars ground realities.

1) Facilitate private-sector investment


Long-term health of this sector depends on the new administrations success in attracting private investment
domestically and from overseas. While there are several precedents of governments handling power generation
and distribution exclusively, the model may not be useful in Myanmars context, with the administration
lacking the resources to make needed investments for expansion and upgrading. Some initiatives to consider:
a) Allow for long-term contracts to be granted. Currently IPPs have to renew contracts with regional
governments yearly; this uncertainty leading to subdued scale of investment
b) Review revenue-sharing terms of JV projects in favor of better terms for private investors. Currently,
JV partners are obliged to provide hefty royalties (in the form of free/subsidized power) to MOEP, in
addition to commercial/income taxes
c) Study successful FDI-attraction campaigns by other nations and accordingly tailor incentive packages
comprising measures such as tax shelters, profit repatriation, relaxed foreign employment rules etc.
Investment promotion is fast becoming a competitive activity with nations vying for limited capital
d) Focus on developing a sound business ecosystem (business incorporation, availability of financing,
legal enforcement etc.). Myanmar is rated 182nd (out of 189) by World Bank on ease of doing
business. It takes 72 days to start a business compared to 3 days in nearby Singapore. Enforcement of
contracts is 2nd worst worldwide. These statistics do not engender investor confidence
e) Reducing subsidy on electricity prices (discussed in C) should also encourage private investment
Vikas Sharma, PMP

Page 16

2) Work on maintaining improved foreign relations


With the international community finally warming to Myanmar and inflow of investment and assistance
starting, it is imperative that the government take measures to maintain this vote of confidence. In 2013 itself,
Myanmar received low-interest loans worth hundreds of millions of dollars from World Bank and ADB to
upgrade its electricity sector. Built into these loans are stipulations on performance and governance.
Government should monitor projects closely to ensure they adhere to all stipulations, and share progress
updates and plans regularly with aid-agencies and other international organizations to engender enduring trust.

3) Gather and implement best practices


Myanmar should study and learn from development experiences of other countries in the region. For instance,
neighboring Thailand has per capita electricity consumption of 2300kWh, an astounding 18 times that of
Myanmar. The Electricity Generating Authority of Thailand (EGAT) that initially operated on a model similar
to MOEPs, is now exploring complete privatization. Other areas where Myanmar should actively seek
expertise and best practices are capacity planning and demand forecasting. This will add rigor to MOEPs
current approach that has been criticized for being simplistic and non-cognizant of market realities.

4) Reduce over-reliance on hydropower


Myanmars over-reliance on hydropower is problematic, especially during the dry season when insufficient
water-levels reduce hydropower production, leading to severe supply shortfalls and blackouts. With
increasingly fluctuating rainfall patterns, production planning is going to only become more difficult going
forward. Myanmar needs to diversify into other power sources. While wind/solar are currently too nascent and
cost-prohibitive to serve as credible alternatives, gas-fired power is promising. Government should actively
solicit and direct more investments/loans into gas-fired projects. It should invest in exploring Myanmars
Vikas Sharma, PMP

Page 17

abundant natural-gas reserves to provide easy access to gas, and encourage setting up of gas-fired plants. It
could also consider importing gas-turbines and engines from overseas, and promoting small-scale private gasplants; to help meet short-term demand during dry season.

5) Raise electricity tariffs prudently and decisively


Myanmars electricity tariffs are among the lowest in ASEAN and worldwide. Providing heavily subsidized
electricity has debilitated MOEPs fiscal situation, and rendered it unable to invest in increasing capacity and
upgrading distribution networks. The attempt to keep electricity affordable has inadvertently led to severe
shortfalls and dismal electrification levels. Myanmar has to act decisively and raise tariffs if the situation is to
improve. While increases may lead to widespread protests (like the backlash against proposed hikes in 2013),
government should prioritize long-term benefits of increased investment funds over short-term populist
pressure. A progressive tier-based tariff system that charges a lower price up to a threshold usage-level and a
higher price above that would be ideal (MOEP proposed a similar system in 2013). Such a system would be
equitable to poorer segments that have low-usage. Also, a phased-approach should be used whereby tariffs are
increased incrementally over a number of years as opposed to suddenly. To further increase chances of success,
a concerted campaign should be run to educate households/businesses on the rationale behind the hike, and on
the benefits (higher electrification, reliable supply) that the hike would enable.

Section 4 Conclusion
After decades of stagnation, Myanmar has started its arduous journey towards socio-economic development.
With power such a necessary ingredient towards this aim, it is imperative that the electricity sector take massive
steps forward from its current state. Renewed flow of assistance and increasing overseas investor interest are
positive signs and need to be encouraged. At the same time, institutional improvements in price structures,
planning frameworks and revenue-sharing are needed as well to set the sector on the right course.
Vikas Sharma, PMP

Page 18

Section 5 Reference Sources


The key sources referred to for developing this paper are listed below:
1. October 2012. Myanmar Energy Sector Initial Assessment Asian Development Bank
2. May 2013. Infrastructure in Myanmar KPMG Advisory
3. Subha Krishnan, July 2013. Analysis of Emerging Opportunities in Myanmars Electricity Industry
Frost & Sullivan, Energy & Power Systems Practice
4. U Maung Maung, Chief Engineer, Myanmar Electric Power Enterprise (MEPE), February 2013.
Power System Development Scheme of MEPE.
http://www.ubifrance.com/medias/press/mepe_9_7_2013_29_31.pdf
5. Statistics from Ministry of Electric Power (MOEP), Myanmar
http://www.energy.gov.mm/
6. David Dapice, December 2012. Electricity Demand and Supply in Myanmar ASH Center for
Democratic Governance and Innovation at the John F. Kennedy School of Government, Harvard
University
7. David Dapice, May 2012. Electricity in Myanmar: The Missing Prerequisite for Development ASH
Center for Democratic Governance and Innovation at the John F. Kennedy School of Government,
Harvard University
8. Win Naung Toe and Rachel Vandenbrink, November 2013. Myanmars Parliament Calls for Freeze on
Higher Electricity Rates Radio Free Asia.
http://www.rfa.org/english/news/myanmar/electricity-11082013175742.html
9. Soe Than Lynn, November 2013. ADB grants $60m loan for power Myanmar Times.
http://www.mmtimes.com/index.php/business/8653-adb-grants-60m-loan-for-power.html

Vikas Sharma, PMP

Page 19

10. Zaw Win Than, February 2013. World Bank to support electricity access Myanmar Times.
http://www.mmtimes.com/index.php/business/4062-world-bank-to-support-electricity-access.html
11. Kyaw Soe Lynn, February 2013. World Bank Group to Support Myanmars Plan to Improve Peoples
Access to Electricity The World Bank
http://www.worldbank.org/en/news/press-release/2013/02/05/World-Bank-Group-to-SupportMyanmar-8217-s-Plan-to-Improve-People-8217-s-Access-to-Electricity