SCHEDULE OF SPECIFICATIONS
Owner:
Project:
Location:
Architect:
A.
B.
C.
D.
E.
F
G.
H.
I.
J
K.
L.
M.
N.
O.
P.
DIVISION
General Conditions
Site Works
Schedule of Concrete Work & Flooring
Roofing
Waterproofing
Schedule of Metalwork
Schedule of Carpentry
Schedule of Walls & Partitions
Schedule of
Schedule of
Schedule of
Schedule of
Schedule of
Schedule of
Plumbing
Schedule of
Ceiling
Doors
Glass and Glazing
Hardware
Finishes
Furnishings
Electrical Work
PAGE
2
5
5
6
6
7
7
7
8
8
9
9
10
10
10
11
SCHEDULE OF SPECIFICATIONS
SCHEDULE OF SPECIFICATIONS: DOC. NO. 001-05152015-01
GENERAL CONDITIONS
Page
A.
1.0
GENERAL
1.1
for carefully examining, comparing and verifying the data furnished by the
Plans and Specifications. In case of obscurity or discrepancy in the Plans
and Specifications, the Contractor shall submit the matter to the Architect
or his authorized representative for the proper explanation or necessary
correction, before any adjustment shall be made. Any adjustment by the
Contractor without such determination shall be at his risk and expense.
Omitted or wrongly described details of work, which are manifestly
necessary to carry out the true intent of the drawings and specifications,
shall be performed as if fully and correctly set forth and described in the
drawings and specifications.
The Owner may, from time to time, make changes in the specifications
and construction drawings. However, if the cost to the Contractor shall be
materially increased by such change, the Owner shall pay the Contractor
for the reasonable cost in accordance with the changes.
1.3
Page
2.0
MATERIALS
2.1
the Specifications, or when called for by the Architect, the Contractor shall
furnish, for approval, full Information and satisfactory evidence as to the
kind and quality of materials or articles he will incorporate in the work.
The Contractor shall furnish, for Architects and Owners approval, all
samples when so directed. The work shall be in accordance with approved
samples. Materials and articles installed or used without such approval
shall be at the risk of subsequent rejection.
Any failure on the part of the Contractor to conform or use materials that
are not specified herein shall be under subsequent rejection. Any
alteration or revision of material usage without approval from the
Architect shall make the Contractor responsible and liable in terms of
guarantee, workmanship and defects.
3.0
WORKMANSHIP
SCHEDULE OF SPECIFICATIONS
3.1
Page
REPRESENTATIVE:
AUTHORIZED
Whenever
the
Page
4.1
Contractor is not at the site, orders maybe given by the Owner to his
authorized representative and shall be accepted and complied with by the
superintendent or foreman of the Contractor.
4.2
CONSTANT SUPERVISION.
CLEAN UP: The Contractor, prior to the turnover of the work to the
Owner, shall remove any excess materials, waste, debris, rubbish, and all
construction and installation equipment and tools from the premises.
B. SITEWORKS
1. SOIL TREATMENT shall be with Lentrek TC Termiticide or approved equal
by the Architect.
SCHEDULE
OF SPECIFICATIONS
2. FOUNDATION shall be in Reinforced Concrete
(Class
A mixture, 1:2:4);
SCHEDULE OF SPECIFICATIONS: DOC. NO. 001-05152015-01
Page
Page
Page
9
Page
6 pairs
b. Deadbolt
c. Entrance Door Handle
d. Concealed Bolt
1 set
1 set
2 sets
or approved equal
Hafele satin finish
Hafele satin finish
Brass
Finish
approved
by
Architect
2. For Single Leaf Doors
a. Ball-Bearing Hinges
b. Lockset
2 pairs
1 set
1 set
Aluminum track rail
SCHEDULE
OFsatin
SPECIFICATIONS
1 pc per
Smooth
finish
Handle
door
10
Page
4. Wood Cabinets and utility cabinet shall be concealed heavy duty hinges.
M. SCHEDULE OF FINISHES
1. All Interior CHB Walls shall be Odorless latex paint, Boysen brand,
three-coats, matte finish, as shown in plan.
2. All Exterior Walls shall be Latex paint, Boysen brand, three-coats, Semigloss finish for walls where no accent is present.
3. All Woodwork or Cabinetry shall be maple varnish or stain unless
otherwise indicated in plan.
4. For wood Door Frames and Jambs shall be Maple Wood Stain finish,
unless otherwise indicated in plans.
5. For Dry Wall Partitions shall be Marine Plywood or Hardiflex, 10 mm THK
painted finish.
6. For all Ceilings shall be Gypsum board or Hardiflex, 8 mm THK, painted in
matte enamel finish, except in Bathrooms, ceilings shall be painted in
smooth, semi-gloss enamel finish.
7. Latex paint, three coats, semi-gloss, shall be applied for metal columns
at carport.
N. SCHEDULE OF FURNISHINGS (With Furniture Specifications to follow)
1. For Kitchen cabinets shall be 10 mm THK Marine Plywood painted in Matte
enamel finish.
O. PLUMBING
1. All water closets shall be American Standard or Architects approved
equal, with white color and with built-in economical flush system.
2. Lavatories for Powder Room and Maids T&B shall be counter-mounted
type.
3. Lavatory for Masters Bedroom shall be reinforced concrete in mosaic tile
finish, installed cleanly and sloped towards drain.
SCHEDULE
SPECIFICATIONS
4. Unless otherwise specified, all plumbing
fittings OF
shall
be local in satin
SCHEDULE OF SPECIFICATIONS: DOC. NO. 001-05152015-01
Page
11
12
Page
END OF SPECIFICATIONS