You are on page 1of 9

Soal Latihan Semester 1

Daisy Yani

1. Let x = 8 and y =15, the result of operation - (x - y) is . . . .

A. 7
B. -7
C. 23
D. -23
2. Six hours ago ,the air temperature was -10C. Now, the temperature decreases 7C, the

current temperature is . . . .
A. 17C
B.

3C

C. - 3C
D. -17C
3. The value of b from (6 b) (-15) = 6 [5 (-15)] is . . . .

A. -15
B. 5
C. 6
D. 11
4. Given a = (-156) : (-3) : 4. The value of a is . . . .

A. 208
B. 13
C. -13
D. -208
5. The result of operation [-12 - (-60)] : [8+(-10)] is . . . .

A. -36
B. -24
C. 24
D. 36
6. The estimation of 142 275 to nearest hundreds digit is . . . .

A. 20.000
B. 30.000
C. 40.000
D. 60.000
http://mathematicssss.blogspot.com

Page 1

Soal Latihan Semester 1

Daisy Yani

7. The simple form of (4 5) (3 7)5 : (6 7) is . . . .

A. 2.35.7
B. 2.3.5.7
C. 2.3.5.7
D. 2.3.5.7
5
4
8. The result of (-2) : 2

is . . . .

A. 10
B. 6.25
C. -6.25
D. -10
9. Write 2

A.

12
100

B.

3
125

C.

6
250

D.

25
100

2
% as fractions in simplest form .
5

10. If the fractions of

A.

2 4 7
, ,
3 5 10

B.

2 7 4
, ,
3 10 5

C.

4 7 2
, ,
5 10 3

D.

7 2 4
, ,
10 3 5

2 4
7
are arranged by increasing order, then ....
, and
3 5
10

11. The expression 6.51 (5.34 + 2.17) 2.21 is closest to .

A. 46.7
B. 46.6
http://mathematicssss.blogspot.com

Page 2

Soal Latihan Semester 1

Daisy Yani

C. 34.7
D. 34.5
12. 3

3
2
1
1 1 = .
4
3
2

A. 3

11
12

7
12

B.

11
12

7
12

C.

D.
13. 0,075 x 60.000 = .
A. 45000
B. 4500
C. 450
D. 45
14. The scientific notation form of 0,0004566 is .

A. 45.66 x 10-5
B. 4.566 x 10-4
C. 4.566 x 104
D. 45.66 x 105
15. The width and the length of a rectangle are 3

1
1
cm and 5 cm, then the perimeter of it is
3
4

3
A. 18 cm
8

B. 17 16 cm
C. 8

7
cm
12

D. 6

3
cm
4

http://mathematicssss.blogspot.com

Page 3

Soal Latihan Semester 1

Daisy Yani

16. A half of the totals of marble in a box are yellow, of those are red and the rests are black.

If the total of marbles in that box is 36, then there are black marbles.
A. 8
B. 9
C. 16
D. 18
17. In the algebraic form 3a2-2ab-b+b2, then the coefficient of b is .

A. 2
B. 1
C. -1
D. -2
18. The simplest form of 7a2- 3ab+2a+4ab- 5a is .

A. 7a2 + ab - 5a
B. 7a2 - 8a2b+6a2b
C. 7a2 - 3a + ab
D. 7a2 ab + ab
19. The sum of -2(3p - q) and 3(2p - 4q) is .

A. -12p-14q
B. -12p-10q
C. 10q
D. -10q
20. If p = -3, then the value of 2p3 4 is .

A. 50
B. 14
C. -22
D. -58

http://mathematicssss.blogspot.com

Page 4

Soal Latihan Semester 1

21. Determine

A.

2x 4
6

B.

2x 4
6

C.

5x 8
6

D.

5x 8
6

Daisy Yani

x x 4
= ....

2
3

22. Nanis father buys a car at price Rp. 65,000,000.00. Later, he sells it. In fact, he is suffering

loss 15%. The selling price for his motorcycle is .


A. Rp 9,750,000.00
B. Rp 55,250,000.00
C. Rp 59,475,000.00
D. Rp 74,750,000.00

23. Rifka sold a television for Rp.1,650,000.00. For the selling, he got a profit 10%. The buying

price of the television is .


A. Rp 1,485,000.00
B. Rp 1,500,000.00
C. Rp 1,800,000.00
D. Rp 1,815,000.00

24. Velyn bought a math book for Rp 25,000.00, a science book for Rp 31,200.00, an english

book for Rp 26,500.00. The store will give discount for 20% if the price of the book more
than Rp 25,000.00. What should Velyn pay to the cashier?
A.

Rp 66,160.00

B. Rp 71,160.00
C. Rp 77,700.00
D. Rp 82,700.00
http://mathematicssss.blogspot.com

Page 5

Soal Latihan Semester 1

Daisy Yani

25. A fruit seller bought 5 boxes of oranges for Rp 2,500,000,00. Written in box :

Gross 50 kg
Tare 8%
The seller sold the oranges for Rp 12,500.00 per kg, then the profit is .
A.

Rp 375,000.00

B.

Rp 500,000.00

C.

Rp 575,000.00

D.

Rp 625,000.00

26. A farmer has a loan of Rp 6.000.000 from KUD with the interest rate of 1% monthly. If he

wants to pay it back 15 times, how much does he pay each month?
A.

Rp 400,000.00

B.

Rp 460,000.00

C.

Rp 490,000.00

D.

Rp 600,000.00

27. Given mathematic sentences on the bellow

i.

2x + y = 30

ii. x 12 = 2x + 20
iii. y + 15 = 27
iv. 6a 12 = a2 + 20
The form of linear equation with one variable are . . . .
A. (i) and (iii)
B. (i) and (iv)
C. (ii) and (iii)
D. (iii) and (iv)
28. Given : 7k + 27 = 4k 66 , the value of k is . . . .

A. 31
B. 13
http://mathematicssss.blogspot.com

Page 6

Soal Latihan Semester 1

Daisy Yani

C. -13
D. -31
29. The solution of

2
4
( x 6) ( x 2) is . . . .
3
5

A. x = -17
B. x = -2
C. x = 4
D. x = 42

30. Andi is two years older than Budi and Budi is 6 years older than Chinta. The sum of their

ages when Andi is twice than Chintas age is . . . .


A. 16
B. 28
C. 30
D. 38

31. Given statements on the bellow:

(i) 2x - 16

12 + n

(ii) 6x 15

12 + 3x

(iii)4x

+5

(iv)

The form of linear inequalities with one variable are . . . .


A. (i) and (ii)
B. (ii) and ( iii)
C. (i) and (iii)
D. (ii) and (iv)

http://mathematicssss.blogspot.com

Page 7

Soal Latihan Semester 1

Daisy Yani

32. The solution of: x +19 < 3x + 7 is . . . .

A. x < 13
B. x < 6
C. x > 13
D. x > 6

33. The result of

A. x

-32

B. x

28

C. x

-32

D. x

28

( x 6) (3x 1)
is . . . .

2
5

34. The length of a rectangle is 6 cm greater than the side of a square. The width of rectangle is

equal to the side of square. If the area of the rectangle is subtracted by 24 greater than the
area of the square, so the minimum value of width and the length of rectangle are . . . .
A. 3 cm and 9 cm
B. 4 cm and 10 cm
C. 6 cm and 12 cm
D. 8 cm and 14 cm
35. If A : B = 2 : 3 and B : C = 4 : 5 so A : C ...

A. 2 : 15
B. 8 : 15
C. 3 : 5
D. 3 : 4
36. The value of y if

1 1
: y : 6 is.
2 3

A. 9
B. 6
C. 3
D. 1
http://mathematicssss.blogspot.com

Page 8

Soal Latihan Semester 1

Daisy Yani

37. The length of Gatot Subroto street is 4.8 km. in a map, the length of Gatot Subroto street is 8

cm. If in the same map, the length of Sudirman street is 6 cm, then the length of Sudirman
street is .
A. 6.4 km
B. 4.6 km
C. 3.6 km
D. 2.4 km

3
5

38. Fiona takes 24 minutes to wash 48 dishes. The number of dishes can she wash in 1 hour is .

...
A. 65
B. 72
C. 96
D. 192

39. A project can be finished by 20 workers in 36 days, if the project wants to be finished in 24

days, so the number of worker that must be added in the project is.
A. 10 people
B. 15 people
C. 20 people
D. 30 people

40. A project manager calculated a project can be finished by 30 workers in 75 days, but after
done for 10 days, 5 workers quit from the project. So the project will be finished in days .
A. 88
B. 85
C. 80
D. 78

http://mathematicssss.blogspot.com

Page 9

You might also like