You are on page 1of 6

National Load Despatch Centre

Total Transfer Capability for July 2015


Issue Date: 01/07/2015

Issue Time: 1100 hrs


Total
Time
Transfer Reliability
Period
Capability
Margin
(hrs)
(TTC)

Corridor

Date

NR-WR *

1st Jul 2015 to


31st Jul 2015

00-24

WR-NR*

1st Jul 2015 to


31st Jul 2015

00-17
23-24
17-23

NR-ER*

1st Jul 2015 to


31st Jul 2015

ER-NR*

1st Jul 2015 to


31st Jul 2015

W3-ER$
ER-W3

1st Jul 2015 to


31st Jul 2015
1st Jul 2015 to
31st Jul 2015

00-06
06-18'
18-24
00-17
23-24
17-23

1st Jul 2015 to


31st Jul 2015

NER-ER

S1-S2
(Rev - 0 )

Import of
Punjab
(Rev - 0 )
Import TTC
for DD &
DNH
(Rev - 0 )

1st Jul 2015 to


31st Jul 2015

1579

4600

5157

4600

200

300

4400

1800
1800
1800
4100

293
358
293
2431

4100

1507
1442
1507
1669
1669

No limit is being specified.


No Re-routing is allowed via W3-ER-NR.

2700
2300
2700

750

1950
1550
1950

1550

400
0
400

No limit is being Specified.

2650

2650

2650

2650

2100

550

2165

485

1657

993

1722

928

No limit is being Specified.

00-24
00-17
23-24
17-23
00-17
23-24
17-23

1270

45

1225

210

1205

1250

1015
995

1320

45

1275

1230

45

1185

00-24

3145

335

2810

2908

00-24

3145

335

2810

2709

101

00-24

3145

335

2810

2789

21

00-24

3145

335

2810

2878

00-24

2845

335

2510

2769

1st Jul 2015 to


31st Jul 2015

00-24

5700

300

5400

3790

1610

1st Jul 2015 to


31st Jul 2015

00-24

1200

1200

1st Jul 2015 to


9th Jul 2015
10th Jul 2015 to
11th Jul 2015
12th Jul 2015 to
19th Jul 2015
20th Jul 2015
21st Jul 2015 to
31st Jul 2015

Comments

00-06
18-24
06-18'
00-06
18-24
06-18'

Changes
in TTC
w.r.t.
Last
Revision

874

00-24

ER-NER

4400

421

700

1st Jul 2015 to


31st Jul 2015

SR-ER *

2000
2000
2000

2000

300

SR-WR *

1st Jul 2015 to


31st Jul 2015

5100

Margin
Available for
Short Term
Open Access
(STOA)

1000

00-05
05-22'
22-24'

3rd Jul 2015 to


31st Jul 2015

500

Long Term
Access (LTA)/
Medium Term
Open Access
(MTOA) #

00-24

1st Jul 2015 to


31st Jul 2015

ER-SR

5100

500

Available
Transfer
Capability
(ATC)

00-24

WR-SR

1st Jul 2015 to


2nd Jul 2015

2500

Revision No. 5

1275
1185

LTA and MTOA as per ex-pp


schedule

00-17
9400
9200
2106
200
7094
23-24
17-23
9900
9700
2606
* Fifty Percent (50 % ) Counter flow benefit on account of LTA/MTOA transactions in the reverse direction would be considered for advanced transactions (Bilateral &
First Come First Serve).
W3 zone
Injection

1st Jul 2015 to


31st Jul 2015

National Load Despatch Centre


Total Transfer Capability for July 2015
Issue Date: 01/07/2015

Corridor

Date

Issue Time: 1100 hrs


Total
Time
Transfer Reliability
Period
Capability
Margin
(hrs)
(TTC)

Available
Transfer
Capability
(ATC)

Revision No. 5
Long Term
Access (LTA)/
Medium Term
Open Access
(MTOA) #

Margin
Available for
Short Term
Open Access
(STOA)

Changes
in TTC
w.r.t.
Last
Revision

Comments

$ As per Simulations, predominant direction of flow is on West to North Corridor. Hence, in case injection point is in Western Region (W1,W2,W3), STOA/PX
transactions from West to North on West-East-North corridor shall not be allowed as such transaction increases congestion in the West to North Corridor.
1) S1 comprises of Telangana, AP and Karnataka: S2 comprises of Tamil Nadu, Kerala and Puducherry
2) W3 comprises of the following regional entities :
a) Chattisgarh Sell transaction, b) Jindal Power Limited (JPL) Stage-I & Stage-II, c) Jindal Steel and Power Limited (JSPL), d) ACBL, e) LANCO Amarkantak
f) BALCO, g) Sterlite (#1,3,4), h) NSPCL, i) Korba, j) Sipat, k) KSK Mahanadi, L)DB Power, m) KWPCL, n)Vandana Vidyut

# The figure is based on LTA/MTOA approved by CTU and Allocation figures as per RPCs RTA/REA. In actual Operation, due to Units being on Maintenance/
Fuel shortage/New units being commissionned the LTA/MTOA utilized would vary. RLDC/NLDC would factor this situation on day-ahead basis.
In the eventuality that net schedules exceed ATC, real time curtailments might be effected by RLDCs/NLDC.
In case of TTC Revision due to any shutdown :
1) The TTC value will be revised to normal values after restoration of shutdown.
2) The TTC value willl be revised to normal values if the shutdown is not being availed in real time.

Limiting Constraints
Corridor
NR-WR
WR-NR
NR-ER
ER-NR

Constraint
(n-1) contingency of 400kV Zerda-Bhinmal and (n-1) contingency of 220kV Badod-Modak.
High Loading of 400kV Singrauli-Anpara & High loading of 765 kV Agra-Gwalior (1250 MW SPS
setting on each circuit of 765 kV Gwalior-Agra) and Loop flows on 400kV Kankroli-Zerda and 400kV
Bhinmal-Zerda (power flowing from WR to NR on 765kV Gwalior-Agra D/C and from NR to WR on
400kV Kankroli-Zerda and 400kV Bhinmal-Zerda).
(n-1) contingency of 400 kV Saranath-Pusauli
(n-1) contingnecy of 400 kV Farakka-Malda D/C

1. n-1 of 400 kV Wardha Parli will lead to 30 degrees angular separation between Wardha and Parli.
2. (n-1) contingency of one circuit of 400kV Parli(PG)-Sholapur(PG)
1. n-1 of 400 kV Wardha Parli will lead to 30 degrees angular separation between Wardha and Parli.
2. (n-1) contingency of one circuit of 400kV Parli(PG)-Sholapur(PG)
WR-SR &
3. ER-SR TTC has been declared assuming more than 1100 MW generation at Talcher Stage-2. In case
ER-SR
Talcher Stage-2 generation goes below 1100 MW, then the ER-SR TTC would be revised downward as
constraints within ER would emerge.
ER-NER & (n-1) contingency of 400/220 kV, 2x315 MVA ICTs at Misa results in high loading of other 400/220 kV,
NER-ER 315 MVA ICT at Misa
S1-S2
(n-1) contingency of one circuit of 400 kV Kolar-Hosur D/C
Import of DD (n-1) contingency of 400/220KV 315MVA ICT at VAPI
& DNH
Import of
(n-1) contingency of ICT at Dhuri and (n-1) contingnecy of 220kV Moga(PG)-Moga(PSTCL)
Punjab
W3 zone 1. n-1 of 400 kV Wardha Parli will lead to 30 degrees angular separation between Wardha and Parli.
Injection 2. (n-1) contingency of one circuit of 400kV Parli(PG)-Sholapur(PG)
*Primary constraints
ER-W3

Simultaneous Import Capability

Corridor

Date

Long Term
Margin
Changes
Total
Available
Time
Access (LTA)/ Available for in TTC
Transfer Reliability Transfer
Period
Medium Term Short Term
w.r.t.
Capability Margin Capability
(hrs)
Open Access Open Access
Last
(TTC)
(ATC)
(MTOA)
(STOA)
Revision

Comments

ER
1st Jul 2015
NR*
2nd Jul 2015 to
31st Jul 2015

NER

1st Jul 2015 to


31st Jul 2015

00-17
23-24
17-23
00-05
08-24
05-08'
00-17
23-24
17-23

7300

800

6500

7588

7300

6500

7500

6700

200

700

800
8000
1270

7588
7200

45

1225

1250

1205

5350
4950
4950
4950
5350
5350
4950
4950
4950
5350

4600
4200
4200
4200
4600
4600
4200
4200
4200
4600

210

Revised considering present


WR-NR and ER-NR Interregional flow pattern flow in
the range 68:32.

1015
995

WR

1st Jul 2015 to


2nd Jul 2015

SR
3rd Jul 2015 to
31st Jul 2015

00-05
05-06'
06-18'
18-22
22-24
00-05
05-06'
06-18'
18-22
22-24

750

750

3650
3650
3715
3650
3650
3207
3207
3272
3207
3207

950
550
485
550
950
1393
993
928
993
1393

Simultaneous Export Capability

Corridor

NR*

NER

Date

1st Jul 2015 to


31st Jul 2015
1st Jul 2015 to
31st Jul 2015

Long Term
Margin
Changes
Total
Available
Time
Access (LTA)/ Available for in TTC
Transfer Reliability Transfer
Period
Medium Term Short Term
w.r.t.
Capability Margin Capability
(hrs)
Open Access Open Access
Last
(TTC)
(ATC)
(MTOA)
(STOA)
Revision
00-06
06-18'
18-24
00-17
23-24
17-23

700

3800
3800
3800

1320

45

1275

1230

45

1185

4500
4500

714
779
714
0

Comments

3086
3021
3086
1275
1185

WR
1st Jul 2015 to
No limit is being Specified.
00-24
31st Jul 2015
* Fifty Percent (50 % ) Counter flow benefit on account of LTA/MTOA transactions in the reverse direction would be considered for advanced
transactions (Bilateral & First Come First Serve).
SR *

Limiting Constraints
Import
NR
Export
NER

Import
Export

(n-1) contingnecy of 400 kV Farakka-Malda D/C


High loading of 765 kV Agra-Gwalior (1250 MW SPS setting on each circuit of 765 kV Gwalior-Agra) and high loop
flows on 400kV Kankroli-Zerda and 400kV Bhinmal-Zerda (power flowing from WR to NR on 765kV Gwalior-Agra
D/C and from NR to WR on 400kV Kankroli-Zerda and 400kV Bhinmal-Zerda).
(n-1) contingency of 400kV Zerda-Bhinmal and (n-1) contingency of 220kV Badod-Modak.
(n-1) contingency of 400 kV Saranath-Pusauli
(n-1) contingency of 400/220 kV, 2x315 MVA ICTs at Misa results in high loading of other ICT at Misa
1. n-1 of 400 kV Wardha Parli will lead to 30 degrees angular separation between Wardha and Parli.
2. (n-1) contingency of one circuit of 400kV Parli(PG)-Sholapur(PG)

SR

Import

3. ER-SR TTC has been declared assuming more than 1100 MW generation at Talcher Stage-2. In case Talcher Stage2 generation goes below 1100 MW, then the ER-SR TTC would be revised downward as constraints within ER would
emerge.
*Primary constraints

National Load Despatch Centre


Total Transfer Capability for July 2015
Revision
No

Date of
Revision

Period of
Revision

01-05-2015

Whole
Month

Counter flow benefit on account of LTA/MTOA transactions WR-NR/ ERin the reverse direction would be considered.
NR

16-06-2015

Whole
month

Revised considering skewed sharing of flows on WR-NR and


ER-NR corridor in the range 70:30

24-06-2015

30-06-2015

01-07-2015

Whole
Month

Reason for Revision

Corridor
Affected

Import of
NR

Revised considering the present Maharashtra Demand


WR-SR/ ERpattern & STOA Margin revised due to Talcher Stage-2
SR
Unit-3 Shut down and revised ISGS allocation.
Revised considering the present Maharashtra Demand
pattern & STOA Margin revised due to revised ISGS
allocation.
Revised on account of addition of new elements in NER Grid
and change in load-generation balance.

Whole
Month
02/07/15
Revised considering present WR-NR and ER-NR Interto
regional flow pattern flow in the range 68:32
31/07/15

NR-WR
ER-NER/
NER-ER
Import of
NR

ASSUMPTIONS IN BASECASE
S.No. Name of State/Area
I

Load
Peak Load (MW)

Off Peak Load (MW)

Month : July '15


Generation
Peak (MW)

Off Peak (MW)

NORTHERN REGION
Punjab
Haryana
Rajasthan
Delhi
Uttar Pradesh
Uttarakhand
Himachal Pradesh
Jammu & Kashmir
Chandigarh
ISGS/IPPs
Total NR

10648
8025
6824
5444
12767
1635
1250
2314
304
0
49210

10926
7057
7876
4642
13454
1274
1046
1814
264
0
48352

4850
3604
5172
1337
6515
931
1002
601
0
20522
44535

4895
3604
5172
1337
6511
901
1002
613
0
19131
43166

1
2
3
4
5
6
7
8

EASTERN REGION
Bihar
Jharkhand
Damodar Valley Corporation
Orissa
West Bengal
Sikkim
Bhutan
ISGS/IPPs
Total ER

2659
935
2552
4010
7444
86
105
582
18373

2094
796
2073
3139
5912
54
106
609
14784

220
580
3540
2851
4872
0
1360
10481
23903

160
300
3165
1994
3912
0
1200
9814
20545

1
2
3
4
5
6
7
8

WESTERN REGION
Maharashtra
Gujarat
Madhya Pradesh
Chattisgarh
Daman and Diu
Dadra and Nagar Haveli
Goa-WR
ISGS/IPPs
Total WR

18440
11496
6912
3419
284
667
468
1051
42736

12323
7898
4037
2255
249
473
297
1056
28588

13220
9424
4061
2252
0
0
0
21573
50531

6391
6038
1263
1036
0
0
0
20297
35025

1
2
3
4
5
6
7
8
9
10

II

III

IV
1
2
3
4
5
6
7
8

SOUTHERN REGION
Andhra Pradesh
Telangana
Karnataka
Tamil Nadu
Kerala
Pondy
Goa-SR
ISGS/IPPs
Total SR

1
2
3
4
5
6
7
8

NORTH-EASTERN REGION
Arunachal Pradesh
Assam
Manipur
Meghalaya
Mizoram
Nagaland
Tripura
ISGS/IPPs
Total NER

Total All India

5767
6344
7560
12916
3095
316
68
0
36066

5254
5779
6737
10915
2036
247
68
0
31036

5273
2341
7132
8695
1644
0
0
8410
33495

5055
1682
5372
7007
673
0
0
8410
28199

106
933
116
268
72
98
274
7
1874

95
873
100
185
44
98
172
7
1574

0
284
0
200
4
22
110
1338
1958

0
232
0
165
2
16
110
1281
1806

148259

124334

154422

128741

You might also like