Final Battery
Voltage (Volts)
Type of Loading
(Motor vs. Static)
Equal
More Static Load
(22% vs. 77%)
More Motor Load
(77% vs. 22%)
Page 3 of 8
Stage
1
2
3
4
5
6
7
8
Active
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Duration(sec)
7140
1
1
4
4
4
4
4
Enter duty cycle for DCMtr1 It starts at t=0 second as a constant Z load at 300% of its rated
current and runs for 116 second as a constant power load at 100% load.
Stage
1
2
Active
Yes
Yes
Duration(sec)
4
116
Page 4 of 8
Page 5 of 8
Sizing Page
Page 6 of 8
Discharge Page
Adjustment Page Apply individual wire/Cable Temperature Correction. Uncheck all other
adjustment.
3. Study 1 Calculation Methods on Battery Sizing
Run Battery Sizing Calculation with Load Summation method, check plots and report. Pay
attention to
Battery voltage and current plots.
Duty cycle plots and handling of random load. Where is the random load placed in the
combined duty-cycle.
Battery Sizing report section for IEEE-485 calculation table and summary page.
Run Battery Sizing Calculation with Load Flow Calculation method, check plots and report.
Compare the two methods Which one provides more conservative results? Which one is more
accurate?
ETAP Workshop Notes
Page 7 of 8
Page 8 of 8