INSPECTION AND TEST PLAN

Date:

Consultant: Tabanlioglu

Project: Al Fattan Crystal Towers


Item

Activity/Description
Material
Reinforcement Bar

Tensile Strength

Concrete

Compressive strength
RCP
Water Absorption
Water Permeability
ISAT

Parameter to be
verified

Reinforcement work

Shuttering Material

Shuttering Works

Surfaces Preparation
before Concreting

Inspection
Frequency

Acceptance Criteria

Every batch

As per Structural Specification

One Time during


Trial Mix

As per Each Grade


2000 Coul.
2.5 %
0.30 Ml/M2/S

Lab Reports

Page No: 1 of 1

Control Method /
Reference

Format/
Records

Mill Test Certificate

MIR
Mix
Design
Approval

Diameters & No. of Bars

Each Section

As per Structural Drawings

Structural Drawings

Spacing

Each Section

25mm

Structural Drawings

Lap Length / Anchorage


Length

Each Section

Min. 50 dia.

Structural Drawings

Cover

Each Section

Min. 2 no. Cover blocks per m2

Structural Specification

Surface Finish

Each Section

Structural Specification

MEP Fixtures

Each Section

Approved Shop Drawings

IR

Dimensions

Each Section

3mm

Structural Drawings/
Specification

Verticality

Each Section

3mm

Structural Drawings/
Specification

Level

Each Section

3mm

Structural Drawings

Stability

Each Section

Rigid

Approved Shop Drawings

Cleanliness

Each Section

Free from waste / foreign materials

IR

IR

Inspection
Authority
SECL

TA

INSPECTION AND TEST PLAN


Date:

Consultant: Tabanlioglu

Project: Al Fattan Crystal Towers


Item

Activity/Description

Parameter to be
verified

Inspection
Frequency

Acceptance Criteria

Mix Proportion (Concrete


Grade)

Each truck on
Arrival

Workability (Slump test)


Temperature

Control Method /
Reference

Format/
Records

As per Specification

Structural Specification

Delivery
Order

Each truck on
Arrival

As per Approved Mix Design

Structural Specification

Each truck on
Arrival

Max. 32C

Structural Specification

Each location

Not less than the specified values

Structural Specification

Cube test
results

Each truck

Delivery less than 2 hours from


batching time

As per Approved Method


Statement

Delivery
Tickets

Compaction

Each Section

Usage of vibrator in all areas

Structural Specification

Finish Level

Each Section

Uniform & 4mm

Structural Specification

Protection from direct


sunlight

Each Section

Fully covered with hessian cloth and


polythene

Structural Specification

Curing

Each Section

Watering for 7 days or use of


approved curing compound

Structural Specification

Concrete

Compression Strength
(Cube test at 7 & 28 days)
Concrete Duration

Placing

LEGEND :

Page No: 1 of 1

LA - LOCAL AUTHORITY

H - HOLD

W- WITNESS INSPECTION

S - SURVEILLANCE INSPECTION

R - REVIEW

A - PPROVAL

Inspection
Authority
SECL

TA