REV 3
SATR NUMBER
SATR-S-4001
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
PLUMB
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
REFERENCE
PASS
FAIL
N/A
RE-TEST DATE
PASS
FAIL
N/A
RE-TEST DATE
Sanitary sewer lines shall be hydrotested with potable water, well water
or seawater.
SAES-S-070
Para 18.2
A2
SAES-S-070
Para 18.7
A3
SAES-S-070
Para 18.8 e.
A4
The required test pressure shall be maintained for 24 hours for lines
whose joints have backfilled and 4 hours for lines whose joints have not
been backfilled or are above grounds
SAES-S-070 Para
18.8
B. TEST RESULTS
Head of water recorded at the start of the test _____________ft
Head of water recorded at the end of the test _____________ft
C. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA
No.
C1
REFERENCE
Test results are acceptable (no leak detected) and in accordance with
Saudi Aramco Engineering Standards and contractual requirements.
N/A
REMARKS:
REFERENCE DOCUMENTS:
2-SAES-S-070 -- Installation of Utility Piping Systems, 13 November 2007
Contractor / Third-Party
Technician Performing Test*
Name, Title, Department,
Company, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Witnessed Test
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 1 of 1
N = NO F = FAILED