Production Rates
Careers

The cornerstone to accurate estimating is in the calculation of true cost and an accurate production rate.

PM Documentation

Unit Cost = (Fixed Cost / Output) + Variable Cost

ASCE Online
Free search 60
pages All area
engineering
www.ascelibrary.o

Features

Production Rates Repository


Affiliates

eCompanyLive
Serious Projects
Gush Consulting
ServeULive.com
DownloadGEMS
Kiwi Plastics

UPLOAD

Date
< BACK 2 of 4 NEXT >

Plumbing and Drainage


Task / Description

Prod-Rates
ALL

96

Architectural Builders

24

Bridge Works
Concrete Works
Crainage
Demolition
Design Works

7
17
5
15
5

Electrical Installations

14

Excavation

23

Mechanical

Mining

Piling

Railway Works

Road Works

19

Roof Structures

13

Scaffolds

Structural Frames

Tunneling

Water Engineering

Wet Trades

Sponsors

Railway Station 1st Fix


Railway Station 2nd Fix
Railway Station T&C
Cast Iron TimeSaver 100mm Pipes
Cast Iron TimeSaver 100mm Bends
Cast Iron TimeSaver 100mm Branches
Cast Iron TimeSaver 100mm Double Branches
Cast Iron Spigot Joint Pipes, 100mm
Cast Iron Spigot Joint Pipes, 150mm
Cast Iron Spigot Joint Pipes, 225mm
Cast Iron Spigot Joint Pipes, 300mm
Water Mains, 50-100mm dia
Water Mains, 150-200mm dia
Water Mains, 1,050mm dia
Gas Mains, 200mm dia
Gas Mains, 300mm dia
Gas Mains, 400mm dia

Slow

Ave

Fast

30.0
6.0
8.0
1.2
1.3
2.2
2.5
1.1
0.8
0.5
0.4
2.7
2.1
0.4
1.8
1.2
1.1

Slow

Ave

Fast

2.2
2.1
9.9
5.2
3.3
6.1
5.5
12.6
7.7
4.5
3.2
1.1
2.7

2.8
2.6
10.0
5.4
3.6
5.0
6.7
6.1
13.8
8.3
5.0
4.5
1.7
3.2

3.1
2.8
10.1
6.4
3.9
7.3
6.7
15.4
9.8
5.5
5.5
2.4
5.4

Units

wks
wks
wks
m/hr
hrs/no
hrs/no
hrs/no
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr

Scaffoldings
accessories
Your scaffoldin
towers and
accessories dir
from factory
www.axmann.fr

Egypt Based
Contactor
Polished Concr
Factory Floorin
Green with Pro
Systems
www.deltamisr.net

Construction
Companies J
Apply Free To
Jobs Send you
updated resum
NaukriGulf.com

Posted @ 6/22/2006 2:46:56 AM by gush@win.co.nz | COMMENTS (0)

Plastering
Task / Description

Browning (undercoat), Internal Walls under 2.5m high


Browning (undercoat), Internal Walls over 2.5m high
Browning (undercoat), Reveals and Columns less than 100mm wide
Browning (undercoat), Reveals and Columns 100-200mm wide
Browning (undercoat), Reveals and Columns 200-300mm wide
Covings
Skimming (topcoat), Internal Walls under 2.5m high
Skimming (topcoat), Internal Walls over 2.5m high
Skimming (topcoat), Reveals and Columns less than 100mm wide
Skimming (topcoat), Reveals and Columns 100-200mm wide
Skimming (topcoat), Reveals and Columns 200-300mm wide
Plaster Board to Ceilings
Plastering Ceilings, 1 Bonding, 1 Skimming
Plastering Ceilings, Topcoat Skimming

Units

m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr

Posted @ 6/22/2006 2:43:35 AM by gush@win.co.nz | COMMENTS (0)

Plasterboard
Slow

Ave

Fast

Boarding to Plaster dabs

Task / Description

3.6

4.0

5.5

Units

m2/hr

Boarding to Stud-work/Metal Lathes

4.0

5.0

6.7

m2/hr

Boarding 12mm nailed to studding

12.5

m2/hr

Boarding 19mm nailed to studding

16.5

m2/hr

Tape, Jointing and Sanding

0.1

hrs/m

Posted @ 6/22/2006 2:38:04 AM by gush@win.co.nz | COMMENTS (0)

8/24/2010

Page 2 of 2

Partitioning
Construction Expert
Litigation consulting
and expert testimony
for construction
disputes

www.interface-consulting.com

Shotcrete &
Grouting Eqpt
Delta manufactures
shotcrete & Grouting
equipment & spare
parts
www.shotcreter.com

Piranha Pumps &


Dredges
Industrial & Portable
Dredges 20 to 400
cubic yards per hour
www.piranhapump.com

Pile Testing
Equipment
Testing & Monitoring
Systems for Piles,
Shafts & Deep
Foundation
www.piletest.com

Chip Sealer
Specialized in road
construction Road
Maintenance Expert

Task / Description

Timber Studding
Metalwork System (MF) Studding
Tape, Joint Sand and Top Coat Plasterboard
Skimming to Plasterboards
5mm Hardboard Paneling, excluding studding time
100mm Pine Paneling, excluding studding time
Quality Hardwood Paneling, excluding studding time
Fix 50mm Rocksil Insulation to cavities
Fix Timber Studding and Paramount Partitions
Fix Timber Studding and Demountable Partitions
Fix Timber Studding and Hills Duraboard Partitions
Fix Timber Studding and Gyproc Laminated Partitions
Stud Partitions, Butt Jointed, nailed
Stud Partitions, Butt Jointed, screwed
Stud Partitions, T&G Jointed, nailed
Stud Partitions, T&G Jointed, screwed
Stud Partitions, Fix Sole Plates
Stud Partitions, Fix Noggins
Stud Partitions, Drill 25-40mm Holes
Fix Toilet Partition System, Separation panels
Fix Toilet Partition System, Wall Front Panels
Fix Toilet Partition System, Separation Front Panels
Fix Toilet Partition System, End Front Panels
Fix Toilet Partition System, Hang Door to Panel
Fix Toilet Partition System, Hand Door plugged to wall
Fix Toilet Partition System, Fix Head Rails

Slow

Ave

Fast

5.9
1.6
1.1
5.5
0.8
0.3
2.6
0.8
3.0
2.2
5.9
3.5
2.9
2.1
-

6.2
2.0
1.5
6.1
3.2
1.1
0.5
17.8
3.0
1.1
3.5
2.6
7.3
4.6
3.6
2.8
11.1
16.6
28.5
0.8
0.7
0.6
0.6
0.4
0.6
0.1

6.8
2.5
2.1
6.7
3.6
1.4
0.6
20.2
3.4
1.6
3.9
2.9
9.1
5.8
4.8
3.7
-

Slow

Ave

Fast

1.3
0.9
-

14.2
12.5
25.0
1.1
6.7
20.0
1.7
3.1
3.3
2.2
3.6
2.4
1.5
2.0
4.0
2.0
8.0
6.0
6.0
4.5
2.3
20.0
16.5
7.1
6.2
2.5
2.0
2.0
1.7
2.9
6.1
5.0
4.2
4.1
2.4
1.7
2.5

2.1
3.8
-

Units

m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr
m/hr
m/hr
m/hr
m/hr
m/hr
no/hr
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no
hrs/no

Posted @ 6/22/2006 2:35:25 AM by gush@win.co.nz | COMMENTS (0)

en.gaoyuansg.com

Painting
Task / Description

Prepare Walls
Prepare Doors
Prepare Door Frames
Burn Off / Heat Strip Paintwork
Internal Timber, 1 coat primer before fixing, generally
Internal Timber, 1 coat primer before fixing, timber lengths
Internal Timber, knot, 1 primer, stop, 1 undercoat, 1 gloss
Internal Timber, touchup primer, 1 undercoat, 1 coat gloss
Internal Timber, polyurethane varnish, 2 coats
Internal Timber, polyurethane varnish, 3 coats
Internal Timber, linseed oil to hardwood, 2 coats
External Timber, windows and frames
External Timber, knot, 1 primer, 2 undercoats, 1 coat gloss,
External Timber, touchup primer, 2 undercoats, 1 coat gloss,
External Timber, 2 coats wood preservative
External Timber, 3 coats polyurethane varnish
Internal Walls, 2 coats emulsion to plaster
Internal Walls, 2 coats emulsion to brick/blockwork
Internal Walls, 1 mist, 2 coats emulsion to plaster
Internal Walls, 1 mist, 2 coats emulsion to brick/blockwork
Internal Walls, 1 primer, 1 undercoat, 1 gloss to plaster
Internal Walls, undercoat to door frame
Internal Walls, gloss to door frame
Internal Walls, undercoat to door
Internal Walls, gloss to door
External Walls, 2 coats sandtex to render/concrete
External Walls, 2 coats sandtex to brick/blockwork
External Walls, 1 sealer, 2 emulsion to render/concrete
External Walls, 1 sealer, 2 emulsion to brick/blockwork
Floors, epoxy paint
Ceilings, emulsion paint, 2 coats
Ceilings, emulsion paint, 3 coats
Ceilings, textured paint
Ceilings, artex finish
Internal Steelwork, 1 primer, 1 undercoat, 1 gloss
External Steelwork, 1 primer, 2 undercoats, 1 gloss
Guttering Steelwork, 1 coat primer, 2 undercoats, 1 gloss

Units

m2/hr
m2/hr
m/hr
m2/hr
m2/hr
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr
m/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m2/hr
m/hr

Posted @ 6/22/2006 2:33:10 AM by gush@win.co.nz | COMMENTS (0)

< BACK 2 of 4 NEXT >

Home

eConstruction

Products

Construction Articles

Support

Download Page

Production Rates

Copyright 2005 by Methvin

Careers

PM Docu

| Privacy Statement | Ter

8/24/2010

You might also like