You are on page 1of 85

SCS A world

of possibilities

Introduction

SCS SYSTEM
Unique pre-engineered custom-made lost-in-place
formwork system consisting of Modular Wall Formwork
Panels.
Components of SCS System
Fiber Cement Board
PVC / Light Gauge Galvanized Steel / EPS Spacer
blocks
Reinforced Concrete

The Evolution of Building Technology

APPLICATIONS
Apartments
Villas
Hotels
Commercial Buildings
Malls
Highrise buildings

What are our USPs..?


PROVEN SYSTEM : Tried and tested, established in several
countries for decades.
SPEED : Atleast 3 times faster than conventional construction
QUALITY: Plumb, line and level, proper edges, no cracks or
defects
DURABILITY: Earthquake resistant
NO BRICKWORK : No worry about brickwork quality, soaking
in water, mortar, shortage of good masons
NO PLASTERING : No messy mixing at site, workmanship
issues, curing, repairing cracks
TECHNICAL SUPPORT : Full back-up engineering and
structural design support

USP

Construction
Methodology

Earthwork is
generally
shallow.
Foundations
are of strip or
raft type.
Foundation
depth varies
from 450 mm to
1000 mm
depending on
the SBC.
Earthwork can
be carried out
manually or
mechanically.

FOUNDATION

Reinforcement
steel along with
plumbing lines
are laid and
concrete is
poured till the
plinth level.

FOUNDATION

A completed
foundation
ready for wall
panel erection.

FOUNDATION

Bottom track is
laid in position
on the
foundation at
the desired wall
location.

WALL PANEL ERECTION

Wall panels are


pre fabricated at
site factory.
Erection of wall
panel is done
on the bottom
track fixed on
the foundation.

WALL PANEL ERECTION

Wall panel can


be of 3 typesPVC spacer
panels
panels.

WALL PANEL

Or
Galvanized
steel studs
panel.

WALL PANEL

Or
EPS Spacer
Panels.
Wall panels
thickness can
be of100 mm
125 mm
150 mm
175mm
200mm

WALL PANEL

Door and
Window frames
are installed at
the desired
location prior to
wall concreting.
All concealed
services are
installed before
concreting of
wall panels.
Supports are
provided to wall
panels at
desired
locations.

WALL PANEL ERECTION

Wall concreting
can be done
manually /
crane bucket.

WALL PANEL CONCRETING

Or
By pumping

WALL PANEL CONCRETING

Deck sheet are


laid as slab
sheathing.
Reinforcement
can be either
welded mesh or
normal rebar.
Concreting of
slab is generally
done by
pumping.

DECK SHEET FOR SLAB

After
completion of
slab concreting
again bottom
tracks are fixed
on the slab for
wall panel
erection.

COMPLETED SLAB

AND THE WORK CONTINUES.

SCS A world
of possibilities
System
Capabilities Images

Township
projects

TANAJI MALUSARE CITY, INDIA

TANAJI MALUSARE CITY, INDIA

TANAJI MALUSARE CITY, INDIA

TANAJI MALUSARE CITY, INDIA

TANAJI MALUSARE CITY, INDIA

High rise
Buildings

High rise Buildings

High rise Buildings

Apartments

BEST WESTERN HOTELS, INDIA

BEST WESTERN HOTELS, INDIA

Villas

WARAI WOODS CHALET, INDIA

WARAI WOODS CHALET, INDIA

Sterling in the Middle East - Qatar

Sterling in the Middle East - Qatar

Sterling in the Middle East - Qatar

Interiors

Affordable Housing
Projects

Sterling Affordable housing in the Philippines

Sterling Affordable housing in the Philippines

SCS Modular
System

SCS MODULAR Systems Cost Effective, Relocatable, Flat-Pack System

SCS MODULAR Systems Cost Effective, Relocatable, Flat-Pack System

Infrastructure
Projects

Other Features

Trellis

Trellis

Wood grained elevation features

Wood grained elevation features

Boundary Wall

Boundary Wall

Boundary Wall

Manufacturing
Facilities

Manufacturing Facility in India

SCS A world
of possibilities
System
Advantages &
Benefits

Advantages & Benefits:


1.

Speedier Design
Execution phase in project
execution

A.

Faster return on capital


invested

2.

Elimination of tedious, timeconsuming manpower


intensive processes

B.

Lower dependency on
unorganized labor &
increased reliability on
completion schedules

3.

High quality James Hardie


fibre cement boards
guarantee long life of the
structure

C.

Reduced maintenance /
repairs

Advantages & Benefits:


4.

Inlaid plumbing & electrical


lines, superior quality finish
surface eliminates plastering

D.

Faster availability of super


structure for finishing & other
value addition works

5.

Bill of quantities defined


before start of work

E.

Better predictability of costs


& hence better control

6.

Thinner walls but as strong


as those made from
conventional methods

F.

Increased floor area

Global Operations

ARMENIA

QATAR

INDIA

VIETNAM
PHILIPPINES

INDONESIA

AUSTRALIA

You might also like