The liquefaction of saturated sand deposits is caused by the temporary loss of shear strength
of loose sand due to a rise of excess pore water pressure during cyclic loading, such as
seismic events.
Vibrations induce a rapid volume decrease of loose sands. If the sand is saturated, this
produces an increase of pore pressure in partially undrained conditions. If the increase of pore
pressure balances the total volumetric stress, the effective stress vanishes and the sand loses
its capacity to sustain shear stresses.
Grain size distributions of soil prone to liquefaction:
8-2
Effects of liquefaction.
8-3
Sand boils
8-4
Cohesive Granular
soils
soils
Preloading
X
Dynamic compaction
X
Vibro-compaction
X
Soil-cement columns
(x)
X
Stone columns
X
X
Compaction grouting
(x)
X
Permeation grouting
X
Jet grouting
(x)
X
Electro-osmosis
X
In general, the methods that aim at increasing the density of soil (e.g. vibration, compaction) and
those that aim at permeating it with grouting injections (e.g. permeation grouting) are not
effective in cohesive soils.
The methods that mix the soil with cement (e.g. soil-cement columns, jet-grouting) and
compaction grouting are suited for granular soils. They could be used also in cohesive soils
depending on their time dependent behaviour.
8-6
8.2 Preloading
- Preloading is performed by placing a fill over the soft clay deposit.
- It improves the foundation soil for buildings, embankments, runways, bridge abutments.
- Type of preloads: earth fill, water tanks.
- Sand drains or prefabricated vertical drains (or wick drains) are used to reduce preloading time.
= time factor;
8-7
Remarks.
- Wick drains: plastic core wrapped in geotextile (about 10-20 cm wide and 1-2 cm thick).
- Typical wick drain spacing is 1 to 2 m, depending on soil permeability and time available.
- Typical preloading period is 3 to 6 months, depending on soil permeability and degree of
consolidation to be achieved.
- Construction monitoring: settlement (settlement plates/probes); pore water pressure
(piezometerers); lateral movement (inclinometers)
Wick drains:
8-8
8-9
8-10
Log scale
= pre-loading
.
. ..
(1)
(3)
(2)
(4)
(1)
(2)
(3)
(4)
8-11
where:
D = improvement depth in m
W = pounder weight in ton
H = drop height in m
8-12
- Construction monitoring: induced settlement; ground vibration; ground heave; pore water
pressure increase; verification testing (SPT, CPT).
8-13
8-14
8-15
8-16
8-17
8-18
To be effective, the probe should vibrate at a frequency close to the resonant frequency
the soil into which it penetrates. Hertwig (1933) and Lorenz (1934) studied the effect of
vibration on soils using a vibrator placed at the ground surface.
of
8-19
8-20
8-21
Stone columns can be also constructed using an auger to drilling the borehole
8-22
8-23
8-24
8-25
- When the grout-mix column is completed, a steel beam can be inserted into it, thus obtaining a
foundation pile.
8-26
- Soil grouting is carried out with medium-low pressure of the grouting fluid. This includes:
Compaction grouting; Permeation grouting; Claquage (or hydrofracturing).
- Jet grouting requires much higher pressures with respect to the previous ones.
8-27
Compaction grouting
- Compaction grouting is used to compact loose granular soil or to underpin existing
foundations or to produce controlled heave of structures.
- It involves injection of viscous grout (soil-cement mixture) which does not enter the soil pores
but remain in a homogeneous mass. As a results a series of bulbs is formed around the
injection pipe.
- Compaction grouting is not typically used for excavation support. However, compensation
grouting, a variant of this technique, is increasingly used to control the settlements induced by
tunnelling.
- Grout material may consist of fine sand mixed with 12% cement and water to produce stiff,
mortar-like mixture.
- Grout pipe is installed to maximum treatment depth and grout is injected as the pipe is
withdrawn incrementally, forming a column of interconnected grout bulbs.
- Construction monitoring: injected grout volume; pressure loss; ground surface heave;
verification testing pre- and post-grouting (SPT/CPT)
8-28
8-29
Compensation grouting
By means of compensation grouting it is possible to compensate settlements caused by the
excavation of shallow tunnels which could damage existing buildings.
Grouting occurs through steel sleeved pipes who are installed in horizontal holes starting from a
shaft. By this way, a net of grouting points is created between the foundations and the tunnel.
Grouting of every point can be precisely controlled in order to compensate settlement with the
injection of cement grouts. Building movements are continuously controlled by means of a net
of displacement measuring devices.
8-30
Permeation grouting
- The scope of this technique is to increase the shear resistance of granular soil (providing a
cohesion to them), and to improve their stiffness, by filling their voids with grout without
changing their original structure and volume. It is the oldest grouting technique: the first
documented applications date back to the early 1800s.
- Permeation grouting is frequently adopted for the temporary support of shallow and deep
excavations in granular (pervious) soils and for underpinning existing foundations.
8-31
8-32
- Grouts of fine and ultra-fine cement, with particle size ranging from 1 to 10 microns that can
penetrate fine sands, are used in most cases.
- Chemical solutions (which are appreciably less viscous than cement grouts) can be employed
for increasing the mechanical characteristics of fine soils or to produce impervious
underground barriers in order to control the water flow towards excavations and subterranean
structures.
- Cement based suspension grouts are only suitable for the grouting of soils with a coefficient of
hydraulic conductivity k in excess of 0.08 cm/s.
8-33
Microfine cement based grouts are typically suitable to permeate soils with k greater than
0.001 cm/s, provided the silt content is less than 12%.
Both cement grouts produce hydrofracturing when k is one order of magnitude lower.
Solution grouts can typically be used for permeation grouting as long as k is greater than .0005
cm/s. The layer thickness and the silt percentage also play an important role in the injectability
of the soils and the permeability limits are therefore only indicative.
- Permeation can be achieved in a single pass, while withdrawing the probe from the borehole,
or in multiple passes (through pre-installed tubes-a-manchette) alternating between solution
grout (typically sodium silicate solutions) and cement based grout or suspension grout.
8-34
- During the first pass (solution grouting), grout will predominantly permeate the most pervious
layers in the pressurized grout zones. In addition, once the first pass is finished, the solution
sags under gravity and migrates in the most pervious soils. Becoming a gel, it reduces their
permeability.
The solution grout does not appreciably improve the mechanical characteristics of the
permeated soil. Hence a second pass of suspension grouting (cement) is necessary to this
purpose.
Due to the grouting pressure, the suspension could flow within pervious layers reaching zones
far beyond the one that was intended to be treated. The previous reduction of the permeability
tends to limit, by some extent, this negative affect.
By alternating solution grouts with suspension grouts, the suspension grouts will hydrofracture
through the treated zone close to the tube-a-manchette, thus extending the diameter of the
grouted zone.
A proper treatment could require 3-4 grout passes. As a result, grout cylinders with a
predictable size are formed around the injection pipe.
Their elastic modulus and shear strength parameters are higher, and the permeability is lower,
than those of the original granular soil.
8-35
The grout spread (or radius of the treated soil) can be estimated with the equation of CambefortNaudts
8-36
8-37
Jet grouting
- Jet grouting is an in-situ injection technique employing specialized equipment that includes
grout pumps, grout mixer, drill rig, drill rods and injection monitor with horizontal radial
nozzles delivering high velocity fluids to erode, mix, and stabilize in-situ soils using an
engineered grout slurry.
- The treatment is effective in granular soils, while it is not appropriate for clays.
- The pressure of the fluids can reach 500 bars.
8-38
8-39
8-40
- The Monitor (adjusted for single, double, and triple systems) is a drill pipe attached to the end
of a drilling string and designed to deliver one to three fluids of the jet grouting process
through one or more injection points (nozzles).
- Jet grouted columns could form panels (vertical structures), slabs (horizontal structures) or
canopies (sub horizontal structures within
from the horizontal plane).
(plane view of a
jet grouting slab)
8-41
8-42
- Jet grouting parameters are: pressure of the fluid(s) within the jet grouting string; flow rate of
the fluid(s); grout composition; rotational speed of the jet grouting string; rate of withdrawal
or insertion of the jet grouting string. Their choice depends on the characteristics of soil.
- In layered cohesive-granular soils, the diameter of jet grouted columns tends to be quite
variable with depth.
8-43
- Particular care must be adopted when using jet grouting for underpinning. In fact, if the high
pressure injection reaches the foundations it could cause large heave, severe damages and even
collapse of the building.
8-44
8.8 Electro-osmosis
Electro-osmosis is a method sometime used for the stabilization of silts, silty clays and soft
sensitive clays. It is also used for the remediation of contaminated soils.
It can be described as follows.
When an electric potential gradient is applied across a mass of fine grained soil, the cations
(positive ions) belonging to the double layer of water surrounding its particles are attracted to
the cathode while anions (negative ions) are attracted to the anode. As ions migrate, they drag
water molecules with them.
Because there are more cations than anions in a soil containing negatively charged particles
(such as clay), there is a net flow of water towards the cathode.
This flow, called electro-osmosis, induces a progressive decrease in water content and a
corresponding progressive consolidation of the clay starting at the cathode. As a consequence,
the soil undrained strength tends to increase.
If the double layer is much smaller than the characteristic length dimension of the channels
between the particles, electro-osmotic velocities are independent of conduit size. This makes the
treatment applicable also to clays and silts where standard drainage methods would not be
affective because of their low permeability.
8-45
Drawbacks of this method are its cost and the time required for completing the treatment.
The electro-osmotic flow rate is primarily a function of the applied voltage. It could be increased
by injecting saline solutions at the anode, however it is typically in the range of few millimeters
per second.
8-46
8-47