You are on page 1of 43

OptiX iManager T2000

Operation Manual for SDH

Contents

Contents

8 Configuring Service at Single Station

8-1

8.1 Configuring SDH Service at Single Station

8-2

8.1.1 Creating Common Service

8-2

8.1.2 Creating SNCP Service

8-3

8.1.3 Transfering SNCP Service to Common Service

8-6

8.1.4 Transfering Common Service to SNCP Service

8-7

8.2 Configuring ATM Service at Single Station

8-10

8.3 Configuring Ethernet Service at Single Station

8-17

8.3.1 Creating Transparently Transmitted Ethernet Service

8-17

8.3.2 Creating Layer 2 Switching Ethernet Service

8-21

8.3.3 Creating EPL Service

8-26

8.3.4 Creating EVPL Service

8-30

8.3.5 Creating EPLn Service

8-33

8.3.6 Creating EVPLn Service

8-38

Huawei Technologies Proprietary

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Configuring Service at Single Station


This chapter introduces how to configure service at single station.
The following tasks are described:

Configuring SDH Service at Single Station

Configuring ATM Service at Single Station

Configuring Ethernet Service at Single Station

Huawei Technologies Proprietary

8-1

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

8.1 Configuring SDH Service at Single Station


8.1.1 Creating Common Service
Purpose
Configuring single station SDH service is to directly configure service on the
cross-connect unit of respective units.
With the service configuration on respective stations completed, the service
configuration for the whole network is finished accordingly.

Prerequisites

NM user with the authority of "system operator" or above.

A protection subnet has been created.

Procedure
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Query> to query the SDH service information from the NE.

Click <Create>. The Create SDH Service dialog box is displayed.

Huawei Technologies Proprietary

8-2

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure the parameters of the source and the sink. Click <OK>.

Note:
If the protection subnetwork to be used is a unidirectional ring, select
the service direction to be unidirectional, and select bidirectional for the
protection subnetwork being a bidirectional ring.

8.1.2 Creating SNCP Service


Purpose
To create SNC services, create two unidirectional services respectively from the
tributary unit to two direction of the ring (dual-fed services) first, and then create SNC
services (selectively received services) from the east and west line units to the
tributary unit.

Prerequisites

NM user with the authority of "system operator" or above.

A protection subnet has been created.

Huawei Technologies Proprietary

8-3

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Procedure
1. Configuring dual-fed service
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Query> to query the SDH service information from the NE.

Click <Create>. The Create SDH Service dialog box is displayed.

Configure the service to the east line unit. Click <Apply>.

Note:
The service is unidirectional.

Huawei Technologies Proprietary

8-4

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure the service to the west line unit. Click <OK>.

2. Create selectively received services


Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Query> to query the SDH service information from the NE.

Click <Create SNC>. The Create SNC Service dialog box is


displayed.

Huawei Technologies Proprietary

8-5

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure the working and protection service. Click <OK>.

Note:
The service from the west line should be the working service.

8.1.3 Transfering SNCP Service to Common Service


Purpose
Use this procedure to transfer SNCP service to common service.

Prerequisites

NM user with the authority of "system operator" or above.

SNCP service has been created.

Procedure
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Huawei Technologies Proprietary

8-6

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Click <Query> to query the SDH service information from the NE.

Click <Unfold> to display the service one by one. Right-click the


SNCP service and select Convert to Common Service. The
protection service will be deleted.

Right-click one of the dual-fed services and select <Deactivate>.


The Confirm dialog box is displayed. Click <OK>.

Right-click the deactivated service and select <Delete>. The


Confirm dialog box is displayed. Click <OK>.

8.1.4 Transfering Common Service to SNCP Service


Purpose
Use this procedure to transfer common service to SNCP service.

Prerequisites

NM user with the authority of "system operator" or above.

Service has been created.

Huawei Technologies Proprietary

8-7

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Procedure
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Query> to query the SDH service information from the NE.

Click <Unfold> to display the service one by one. Right-click the


service to be transferred and select Convert to SNC. The dialog
box Specify the service to be protected is displayed.

Huawei Technologies Proprietary

8-8

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure the protection service and click <OK>.

Click <Create>. The Create SDH Service dialog box is displayed.

Configure the dual-fed service from the tributary unit to the line unit.
Click <OK>.

Huawei Technologies Proprietary

8-9

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

8.2 Configuring ATM Service at Single Station


Purpose
Use this procedure to configure the ATM service. Then the ATM service can be
transmitted over SDH.

Prerequisites

NM user with the authority of "system operator" or above.

Supported by OptiX 2500+(Metro 3000) and OptiX Metro 3100.

Fibers and protection subnet have been created at the service layer.

ATM board has been installed.

Procedure
1. Setting the VC4 ports of ATM board as SDH NNI
Step

Action

Set the VC4 ports of ATM board as SDH NNI. The detailed
operations are described in 9.4.1 Setting the VC4 Ports of ATM
Board as SDH NNI.

Huawei Technologies Proprietary

8-10

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

2. Installing the ATM interface board at NM side


Step

Action

Install the ATM interface board at NM side. The detailed operations


are described in 9.4.2 Installing the ATM Interface Board at NM
Side.

3. Creating the corresponding VC4 crossconnection between the ATM and


the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create> and the Create SDH Service dialog box is


displayed.

Create the cross-connection between the ATM board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

Huawei Technologies Proprietary

8-11

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

4. Configuring the port attributes of ATM board


Step

Action

Configure the port attributes of ATM board. The detailed operations


are described in 9.4.3 Configuring the Port Attributes.

5. Configuring the ATM traffic


Step

Action

Select [Configuration/ATM Configuration/ATM Traffic Descriptor]


from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Query the traffic information of an ATM board. Click <Query> to


display the information from the NE side and overwrite that at the
NM side with it.

Right-click in the ATM Traffic Descriptor and select [Create]. The


Create Traffic Descriptor dialog box is displayed.

Huawei Technologies Proprietary

8-12

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Set the flow parameters. Such as Type, Service Type,


Clp01Pcr, Clp0Pcr, Clp01Scr, Clp0Scr, MCR and MBS.

Click <Apply> or <OK>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to configure as many traffic descriptors as


necessary.

6. Configuring the cross-connect of ATM service


Step

Action

Select [Configuration/ATM Configuration/ATM Service


Management] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Right-click in the Cross-Connect and select [Add Connection].


The Add ATM Cross-Connection dialog box is displayed.

Huawei Technologies Proprietary

8-13

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Set the Connection ID, Protection Type, Spread Type, Set


Port, VPI, VCI, Positive/Reverse Traffic Descriptor of
Source/Sink Board, and so on, as required.
Note:
The positive/negative traffic descriptor can only be selected in the flow
descriptor creation during the ATM traffic configuration. Otherwise, a
message prompting error is displayed.

Click <Apply> or <OK>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to configure as many cross-connections of


ATM service as necessary.

7. Configuring the protection group and protection pair of ATM service


(Optional)

Note:
If the No protection is selected for "Protection Type, the protection group and
protection pair of the ATM service do not need configuration.

Huawei Technologies Proprietary

8-14

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Create multiple cross-connections of ATM service with "Protection


Type being 1+1.
Note:
1) Currently, the equipment does not support ATM 1: 1 protection.
2) The PVP and p2p type must be adopted for ATM 1+1 protection.

Activate the cross connections. Select the record and right-click it,
select [Activate Connection].

Create protection group. Right-click in the Protection Group and


select [Add Protection Group]. The Add Protection Group dialog
box is displayed.

Set the Protection Type, Switching Direction, Switching Type,


Revertive Mode, and Pause Time of the protection group.
Note:
1) Currently, the equipment does not support dual-ended switching.
2) If switching type is the source end, the protection pair is required to
be set as the one with the same sink but different sources.
3) If switching type is the sink end, the protection pair is required to be
set as the one with the same source but different sinks.

Click <Apply> or <OK>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Huawei Technologies Proprietary

8-15

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Add a pair of cross-connections into the protection group.


Right-click in the Cross-Connect and select [Add into Protection
Group]. The Add Connection into Protection Group dialog box is
displayed.

Select Working Connection ID, Protection Connection ID and


Protection Group ID.

Click <Apply> or <OK>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to configure as many protection groups and


protection pairs as necessary.

Huawei Technologies Proprietary

8-16

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

8.3 Configuring Ethernet Service at Single Station


8.3.1 Creating Transparently Transmitted Ethernet Service
Purpose
The transparent transmission of Ethernet service is implemented through setting
static routes by:

Port

Port + VLAN.

The port here can be either the MAC (media access control) port or VCTRUNK port
of the Ethernet board. Usually, the transparent transmitted Ethernet service is
applied to point-to-point or point-to-multipoint connection.
The transparent transmission of Ethernet service enables each set-up route to have
a fixed bandwidth and performance. When one more service is created, connections
must be created between the nodes on the trail.
The transparent transmission of Ethernet service is applicable to simple networks.
The network performance can be improved through reasonable settings and the use
of static route. Moreover, bandwidth can be reserved for important services.

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.

Supported by the some Ethernet boards (except EFS/EGS/EMS);

The Ethernet board has been installed.

Huawei Technologies Proprietary

8-17

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Procedure
1. Setting the VC4 port of Ethernet board as SDH NNI (Optional)

Note:
Only the following equipments Ethernet boards need SDH NNI configuration:
z

OptiX Metro 3100

OptiX 2500+(Metro 3000).

OptiX 155/622H(Metro 1000)

Step

Action

Set the VC4 port of Ethernet board as SDH NNI. The detailed
operations are described in 9.3.1 Setting the VC4 Ports of Ethernet
Board as SDH NNI.

2. Installing the Ethernet interface board at NM side (Optional)

Note:
The Ethernet interface unit of some equipment such as the OptiX 155/622H(Metro1000)
integrates the Ethernet board and interface board on itself. So, no independent
Ethernet interface board configuration is needed, and this step can be omitted.
For other equipment such as the OptiX 2500+(Metro3000) and OptiX Metro 3100, their
Ethernet boards and interface boards are separated; the configuration of Ethernet
interface board is needed. Then, this step is mandatory.

Step

Action

Install the Ethernet interface board at NM side. The detailed


operations are described in 9.3.2 Installing the Ethernet Interface
Board at NM Side.

Huawei Technologies Proprietary

8-18

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

3. Configuring the port attributes and binding paths of Ethernet board


Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

4. Creating the corresponding VC12 cross-connection between the Ethernet


and the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Huawei Technologies Proprietary

8-19

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Create the cross-connection between the Ethernet board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

5. Configuring the static Ethernet route


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Transparent


Transmit/Static Route Management] from the Main Menu.

In the lower-left pane, select appropriate NE and click


double-right-arrow button(red).

Query the static route information of the selected Ethernet board


from the NE side. Click <Query> to display it

Click <Create>, or right-click in the Static Route and select


[Create]. The Create Route is displayed.

Huawei Technologies Proprietary

8-20

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Set the parameters of static route. Set the Index and select the
Type, Direction, Source Port Type, Source Port, Source
VLAN, Sink Port Type, Sink Port and Sink VLAN.
Note:
If the value of Type is Port Route, the Source VLAN and Sink
VLAN can not be edited.

Click <Apply> or <OK>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many static routes as necessary.

8.3.2 Creating Layer 2 Switching Ethernet Service


Purpose
The most distinctive difference between the Layer 2 switching and transparent
transmission of the Ethernet service is that the former makes the Ethernet network
something like a LAN. Adding only a connection to this LAN can create a service and
ensure the multipoint connection in the whole network. Moreover, the bandwidth can
be allocated flexibly and the network utility can be improved.

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.
Huawei Technologies Proprietary

8-21

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Supported by the some Ethernet boards (except EFS/EGS/EMS).

The Ethernet board has been installed.

Procedure
1. Setting the VC4 port of Ethernet board as SDH NNI (Optional)

Note:
Only the following equipments Ethernet boards need SDH NNI configuration:
z

OptiX Metro 3100

OptiX 2500+(Metro 3000).

OptiX 155/622H(Metro 1000)

Step

Action

Set the VC4 port of Ethernet board as SDH NNI. The detailed
operations are described in 9.3.1 Setting the VC4 Ports of Ethernet
Board as SDH NNI.

2. Installing the Ethernet interface board at NM side (Optional)

Note:
The Ethernet interface unit of some equipment such as the OptiX 155/622H(Metro1000)
integrates the Ethernet board and interface board on itself. So, no independent
Ethernet interface board configuration is needed, and this step can be omitted.
For other equipment such as the OptiX 2500+(Metro3000) and OptiX Metro 3100, their
Ethernet boards and interface boards are separated; the configuration of Ethernet
interface board is needed. Then, this step is mandatory.

Step

Action

Install the Ethernet interface board at NM side. The detailed


operations are described in 9.3.2 Installing the Ethernet Interface
Board at NM Side.

Huawei Technologies Proprietary

8-22

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

3. Creating the corresponding VC12 cross-connection between the Ethernet


and the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Create the cross-connection between the Ethernet board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

4. Creating Ethernet user


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Layer 2


Switching/Ethernet User Management] from the Main Menu.

In lower-left pane, select the appropriate NE and click the


double-right-arrow (red).

Click <Create>, or right-click in the Ethernet User Management


and select [Create]. The Create User dialog box is displayed.

Huawei Technologies Proprietary

8-23

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Enter the User Name and User ID in the Create User.

Click <OK>. The Operation Result dialog box is displayed and


indicates that the operation succeeded.

Repeat this procedure to create as many users as necessary.

5. Configuring the port attributes and binding paths of Ethernet board


Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.
Note:
During the internal port attribute configuration for the Ethernet interface,
it should be noted that the IDs of users created must be typed in the
corresponding list in the Port Attributes tab for internal ports and
external ports, thus to associate the users with the ports, as shown in
the diagram below.

Huawei Technologies Proprietary

8-24

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.
Note:
During the internal port attribute configuration for the Ethernet interface,
it should be noted that the IDs of users created must be typed in the
corresponding list in the Port Attributes tab for internal ports and
external ports, thus to associate the users with the ports, as shown in
the diagram below.

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

6. Creating VLAN
Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Layer 2


Switching/Forwarding Filter Table Management] from the Main Menu.
Select the tab VLAN.

In lower-left pane, select the appropriate Ethernet board and click the
double-right-arrow (red).

Click <Create>. The Create VLAN dialog box is displayed.

Huawei Technologies Proprietary

8-25

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Enter the information of this VLAN. Select the User, specify the
VLAN ID, and select the appropriate ports as forwarding ports.

Click <OK> or <Apply>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many VLANs as necessary.

8.3.3 Creating EPL Service


Purpose
Use this procedure to configure the EPL service at single station.

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.

Supported by the some Ethernet boards (including EFS/EGS/EMS).

The Ethernet process board and the corresponding interface board have been
installed.

Huawei Technologies Proprietary

8-26

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Procedure
1. Configuring the port attributes and binding paths of Ethernet board
Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.
Note:
The value of Port Type must be PE.

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.
Note:
The value of Port Type must be PE.

Huawei Technologies Proprietary

8-27

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

2. Creating the corresponding VC3 cross-connection between the Ethernet


and the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Create the cross-connection between the Ethernet board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

Huawei Technologies Proprietary

8-28

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

3. Creating EPL service


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Service] from


the Main Menu. Select the tab Ethernet Leased Line Service.

In the lower-left pane, select appropriate Ethernet board and click


the double-right-arrow button (red).

Click <New>. The Create Ethernet Leased Line Service dialog box
is displayed.

Enter the information of the EPL service. Select Service Direction,


Source Port, Source Port VLAN ID, Sink Port, Sink Port VLAN
ID.
Note:
1) The value of Enable Port in the Port Attribute can be modified.
However, if the port attribute has been configured, keep the default
values.
2) If there are no appropriate binding paths in the Binding Path, Click
<Configure Binding Path> to bind new path. The detailed operations
are described in 9.3.3 Configuring Binding Path.

Click <OK> or <Apply>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many EPLs as necessary.

Huawei Technologies Proprietary

8-29

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

8.3.4 Creating EVPL Service


Purpose
Use this procedure to configure the EVPL service at single station.

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.

Supported by the some Ethernet boards (including EFS/EGS/EMS).

The Ethernet process board and the corresponding interface board have been
installed.

Procedure
1. Configuring the port attributes and binding paths of Ethernet board
Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.

Huawei Technologies Proprietary

8-30

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

2. Creating the corresponding VC3 cross-connection between the Ethernet

and the line board


Step

Action

Select [Configuration/SDH Configuration/SDH Service Configuration]


from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Create the cross-connection between the Ethernet board and line


board.

Huawei Technologies Proprietary

8-31

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

3. Creating EVPL service


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Service] from


the Main Menu. Select the tab Ethernet Leased Line Service.

In the lower-left pane, select appropriate Ethernet board and click


the double-right-arrow button (red).

Select Display Shared Service.

Click <New>. The Create Ethernet Leased Line Service dialog box
is displayed.

Huawei Technologies Proprietary

8-32

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Enter the information of the EVPL service. Select Service


Direction, Source Port, Source Port VLAN ID, Sink Port, Sink
Port VLAN ID.
Note:
1) The value of Enable Port in the Port Attribute can be modified.
However, if the port attribute has been configured, keep the default
values.
2) If there are no appropriate binding paths in the Binding Path, Click
<Configure Binding Path> to bind new path. The detailed operations
are described in 9.3.3 Configuring Binding Path.

Click <OK> or <Apply>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many EVPLs as necessary.

8.3.5 Creating EPLn Service


Purpose
Use this procedure to configure the EPLn service at single station.

Huawei Technologies Proprietary

8-33

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.

Supported by the some Ethernet boards (including EFS/EGS/EMS).

The Ethernet process board and the corresponding interface board have been
installed.

Procedure
1. Configuring the port attributes and binding paths of Ethernet board
Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.
Note:
The value of Port Type must be PE.

Huawei Technologies Proprietary

8-34

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.
Note:
The value of Port Type must be PE.

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

2. Creating the corresponding VC3 cross-connection between the Ethernet


and the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Huawei Technologies Proprietary

8-35

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Create the cross-connection between the Ethernet board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

3. Creating EPLn service


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Service] from


the Main Menu. Select the tab Ethernet LAN Service.

In the lower-left pane, select appropriate Ethernet board and click


the double-right-arrow button (red).

Click <New>. The Create Ethernet LAN Service dialog box is


displayed.

Set the information of the EPLn service. Enter VB ID, VB Name.

Huawei Technologies Proprietary

8-36

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Click <Configure Mount Port>. The VB Mount Port Configuration


dialog box is displayed. Select appropriate port in the Available
Mounted Ports and click

Click <OK>.

If there are no appropriate binding paths in the Binding Path, Click


<Configure Binding Path> to bind path. The detailed operations
are described in 9.3.3 Configuring Binding Path.

Repeat this procedure to create as many VBs as necessary.

4. Creating VLAN
Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Layer 2


Switching/Forwarding Filter Table Management] from the Main Menu.
Select the tab VLAN.

In lower-left pane, select the appropriate Ethernet board and click the
double-right-arrow (red).

Click <Create>. The Create VLAN dialog box is displayed.

Huawei Technologies Proprietary

8-37

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Enter the information of this VLAN. Select the VB, specify the
VLAN ID, and select the appropriate ports as forwarding ports.

Click <OK> or <Apply>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many VLANs as necessary.

8.3.6 Creating EVPLn Service


Purpose
Use this procedure to configure the EVPLn service at single station.

Prerequisites

NM user with the authority of "system operator" or above.

Fibers and protection subnet have been created at the service layer.

Supported by the some Ethernet boards (including EFS/EGS/EMS).

The Ethernet process board and the corresponding interface board have been
installed.

Huawei Technologies Proprietary

8-38

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Procedure
1. Configuring the port attributes and binding paths of Ethernet board
Step

Action

Configure internal port attributes. The detailed operations are


described in 9.3.3 Configuring Internal Port.

Configure external port attributes. The detailed operations are


described in 9.3.4 Configuring External Port.

Configure binding path. The detailed operations are described in


9.3.3 Configuring Binding Path.

Huawei Technologies Proprietary

8-39

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

2. Creating the corresponding VC3 cross-connection between the Ethernet


and the line board
Step

Action

Select [Configuration/SDH Configuration/SDH Service


Configuration] from the Main Menu.

In the lower-left pane, select the appropriate NE and click the


double-right-arrow button (red).

Click <Create>, the Create SDH Service dialog box is displayed.

Create the cross-connection between the Ethernet board and line


board.

Click <Apply> or <OK>.

Repeat this procedure to create as many cross-connections as


necessary.

3. Creating EVPLn service


Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Service] from


the Main Menu. Select the tab Ethernet LAN Service.

In the lower-left pane, select appropriate Ethernet board and click


the double-right-arrow button (red).

Click <New>. The Create Ethernet LAN Service dialog box is


displayed.

Huawei Technologies Proprietary

8-40

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Set the information of the EPLn service. Enter VB ID, VB Name.

Click <Configure Mount Port>. The VB Mount Port Configuration


dialog box is displayed. Select appropriate port in the Available
Mounted Ports and click

Click <OK>.

If there are no appropriate binding paths in the Binding Path, Click


<Configure Binding Path> to bind path. The detailed operations
are described in 9.3.3 Configuring Binding Path.

Repeat this procedure to create as many VBs as necessary.

4. Creating VLAN
Step

Action

Select [Configuration/Ethernet Configuration/Ethernet Layer 2


Switching/Forwarding Filter Table Management] from the Main Menu.
Select the tab VLAN.

In lower-left pane, select the appropriate Ethernet board and click the
double-right-arrow (red).

Click <Create>. The Create VLAN dialog box is displayed.

Huawei Technologies Proprietary

8-41

OptiX iManager T2000


Operation Manual for SDH

8 Configuring Service at Single Station

Step

Action

Enter the information of this VLAN. Select the VB, specify the
VLAN ID, and select the appropriate ports as forwarding ports.

Click <OK> or <Apply>. The Operation Result dialog box is


displayed and indicates that the operation succeeded.

Repeat this procedure to create as many VLANs as necessary.

Huawei Technologies Proprietary

8-42

You might also like