Professional Documents
Culture Documents
Key
Note:
The clock parts are manufactured by CNC and the holes in the
parts are square to the part. The parts rely on a friction fit on
the shafts. If the shafts are not inserted carefully then the fit
may not be square. In this event the holes should be enlarged
slightly and the part reassembled on a jig as shown in Penguin0002.
The jig may not be required.
The assembly jig should be made from 19mm thick MDF or
plywood, cut to 200mm square. Three holes should be drilled
through in the centre of the jig as shown. It is very important
that these holes are drilled perfectly square to the jig body.
4 ,3 and
2 holes in the
centre of the jig.
200
200
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
Assembly jig
DRAWN
CHK'D
MATERIAL:
Penguin-0001
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Note:
Parts should be assembled generally as
shown left, for the relevant shaft size.
The jig ensures that parts are
constructed square to the shafts.
Before use a small piece of masking
tape should be placed over the hole
area being used. This ensures that the
parts do not stick to the jig if surplus glue
squeeezes out.
The jig should be supported such that
the shafts have clearance below.
When removing parts from the jig push
the shaft from beneath so that the part is
not pulled from the shaft.
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-0002
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
No.
No.
No.
PART NUMBER
Base top section
(penguin)
Base bottom section
(Penguin)
DESCRIPTION
QTY.
1
1
Note:
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
APPV'D
Penguin-0003
MFG
Q.A
A4
DWG NO.
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
1
2
No.
No.
No.
2
PART NUMBER
frame
Bearings 623
SECTION K-K
SCALE 1 : 3
Bearings should
be flush with
face.
SECTION G-G
SCALE 1 : 3
QTY.
1
10
Note:
DESCRIPTION
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
ITEM
PART NUMBER
NO.
1 Battery holder
Key
5
8
3
Ensure that wires
are soldered in the upward
orientation as shown
3
4
5
6
Base Cover_Penguin
Wood Screws
Self adhesive felt pad
Electrical wiring
DESCRIPTION
QTY.
1
Penguin-0003
1
4
4
1
10 Switch
11 Connectors
1
11
6
2
10
Assembled view
Note:
A towel or similar should be layed out to work on for this procedure. This will minimise the chances of
scratching the finished base.
Trial fit the battery box and switch. The battery box should be a tight fit and go to the bottom of the hole. The
switch should be thumb pressure only. Apply force to the outside edge only, not the rocker button as it may
damage it. Remove the battery box and switch. Refer to drawing Penguin-0025 for wire lengths.
Solder a red wire and a black wire to the battery box ensuring the orientation is as shown. Press the battery
box into place.
Solder two red wires to the switch and insert into the base as described above.
Route the wires along the appropriate channel. Masking tape helps keep the wires in the channel.
Connect the wires to the connector block as shown and insert into the round hole.
Four pads should be attached to the finished cover as shown and the cover screwed into place.
Trial fit the 6mm conduit into the 6mm hole in the base. Remove and set aside.
DWG NO.
SCALE:1:5
Base assembly
Base assembly-Penguin-0005
SHEET 1 OF 1
A4
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM
PART NUMBER
NO.
1 Base assembly_Penguin
No.
No.
No.
Wiring conduit
DESCRIPTION
QTY.
Penguin-0005
Penguin-0004
Note:
267
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
Frame assembly-Penguin
DRAWN
CHK'D
MATERIAL:
Penguin-0006
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM
NO.
1
2
3
4
5
6
7
No.
No.
No.
PART NUMBER
escape wheel
10mm diameter blank
10mm x 3mm diameter spacer
Escape wheel shaft
3
M3 washer
8 tooth wheel
2mm internal diameter O ring
3
3
QTY.
1
1
4
x 50 long brass rod(from 150 length) 1
2
1
1
Note:
The escape wheel should have already been
sanded smooth at this stage. Carefully radius the
trailing edge of the teeth as shown, ensuring that
you do not reduce the overall diameter of the
wheel. The faces of the escape wheel provide a
rotational force to the escapement, therefore
they need to be sanded very smooth (1000
grade) or the friction will be excessive and the
clock will not run.
2
6
DESCRIPTION
SECTION G-G
SCALE 1 : 1
12
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
APPV'D
Penguin-0008
MFG
Q.A
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM
PART NUMBER
NO.
1 60 tooth wheel
2 M3 washer
3 10mm x 3mm diameter spacer
4 8 tooth wheel
No.
No.
No.
1
DESCRIPTION/DRAWING
QTY.
1
2
12
1
1
Note:
Apply a small amount of white glue to the end of the shaft and
carefully tap the shaft squarely into the 60 tooth wheel until flush.
Check for squareness by fitting shaft to the clock frame and turning. A
maximum of 3mm of movement at the edge should be allowed.
Refer to drawings Penguin-0001 and 0002 to remedy.
Glue the remaining six spacers (red) into place with white glue. Set
aside to dry.
3 3 3 3 3 3 5
3 3
3 3 3
The 8 tooth wheel and spacers needs to be removable from the shaft
so should not be glued to the shaft.
Check the fit of the 8 tooth wheel on the shaft. If it is too tight to be
pushed on by hand then relieve the hole slightly with a 3mm drill. Tap
the drill bit into the hole, then whilst holding the drill bit with a pair of
pliers, turn the wheel a small amount and then remove. Repeat the
procedure until the wheel can be pushed onto the shaft by hand
whilst still retaining a good friction fit. Repeat for the spacers also as
these may be tight.
SECTION G-G
SCALE 1 : 1.5
G
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-0009
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
No.
No.
No.
PART NUMBER
2
3
30 tooth wheel
M3 washer
10mm x 3mm
diameter spacer
8 tooth wheel
4
5
QTY.
1
1
2
11
1
Note:
Apply a small amount of white glue to the end of the shaft and
carefully tap the shaft squarely into the 30 tooth wheel until flush.
Check for squareness by fitting shaft to the clock frame and turning.
A maximum of 3mm of movement at the edge should be allowed.
Refer to drawings Penguin-0001 and 0002 to remedy.
Glue the remaining two spacers (red) into place with white glue. Set
aside to dry.
2
5
4 4 4 4
4 4 4
Check the fit of the 8 tooth wheel on the shaft. If it is too tight to be
pushed on by hand then relieve the hole slightly with a 3mm drill.
Tap the drill bit into the hole, then whilst holding the drill bit with a
pair of pliers, turn the wheel a small amount and then remove.
Repeat the procedure until the wheel can be pushed onto the shaft
by hand whilst still retaining a good friction fit. Repeat for the
spacers also as these may be tight.
The following is assembled in the opposite way as it is shown on the
shaft, but is fitted as shown.
Push the 8 tooth wheel onto the shaft so that approximately 36mm is
protruding. Glue the 9 spacers into place using white glue. Try to
avoid getting too much glue onto the shaft as the assembly needs
to be removed. Set aside for about 10 minutes then pull the
assembly from the shaft by pulling on the 8 tooth wheel. Set aside to
dry and clean the shaft with a damp cloth to remove any glue
residue.
Four of the spacers are left loose so as not to apply excessive friction
to the assembly. This makes assembly more manageable.
SECTION G-G
SCALE 1 : 1
G
DESCRIPTION
x 66 long brass rod(from 300
length)
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
APPV'D
Penguin-0010
MFG
Q.A
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
No.
No.
No.
Cannon tube
2
3
32 tooth wheel
Hour hand
10mm x 4mm
diameter spacer
4
15
G
3
PART NUMBER
4
4
NAME
1
1
4
Carefully tap the cannon tube squarely into the 32 tooth wheel
(with a small piece of wood) leaving approximately 9mm
protruding.Put a small amount of white glue on the tube just
below the 32 tooth wheel and tap the tube through until 15mm is
protruding as shown in the drawing. This ensures that excessive
glue does not cover the tube.
Check the wheel for squareness by fitting to the clock frame
(over a shaft). The edge of the wheel should not deviate by more
than 3mm. If it does then refer to drawings Penguin-0001 and
0002 for remedy.
Set aside to dry.
Glue 2 spacers in place adjacent to the 32 tooth wheel ensuring
that no glue remains on the visible tube. Set aside to dry.
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
Slide the hour hand over the tube. This part is held in place by the
friction of the spacers either side. It is required to move for setting
the clock but should be tight.
This is achieved by gluing the next two spacers firmly into place
and pushed up to the hour hand.
Put a small amount of white glue in the hole of the first spacer
(not the tube) and slide down the tube until it is flush with the
hour hand. Apply a small amount of white glue to this spacer
and the tube. Slide the last spacer in to place firmly. This process
of assembly is designed to stop glue getting on to the hour hand
and gluing it to the shaft.
Apply a load to the last spacer with masking tape/ rubber band
or similar means.
Set aside to dry.
SECTION G-G
SCALE 1 : 1
QTY.
Note:
2
2
DESCRIPTION
4 OD x 3 ID x 50 long brass tube (
from length)
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-0011
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:2
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
No.
No.
No.
PART NUMBER
Minute hand O ring
enclosure
2mm internal
diameter O ring
Minute hand O ring
enclosure blank
Minute hand
DESCRIPTION
QTY.
2
Assembly retainer
3
1
1
Note:
Slide the O rings over one of the 3mm diameter shafts. Slide
one of the O ring enclosures over one of the O rings. Apply a
small amount of white glue to the second O ring enclosure
and slide this over the O rings. The enclosures may require
twisting as they are pushed together to overcome the O ring
elasticity.
Apply a small amount of white glue to the minute hand and
slide this into place. Check that the hand is square to the shaft
and adjust if necessary.
Set aside to dry.
Remove the shaft by pulling in the direction of the minute
hand. This ensures that the O rings remain in the enclosure.
Apply a small amount of white glue to the blank and position
as shown. Set aside to dry.
The minute hand and the blank have a slightly burnt side.
Ensure these are fitted so this doesn't show.
2
G
SECTION G-G
UNLESS OTHERWISE SPECIFIED:
DIMENSIONS ARE IN MILLIMETERS
SURFACE FINISH:
TOLERANCES:
LINEAR:
ANGULAR:
NAME
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-0012
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:1
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM
PART NUMBER
NO.
1 10 tooth wheel
2 M3 washer
No.
No.
No.
G
6
DESCRIPTION/DRAWING
3
64 tooth wheel
5
6
1
1
Note:
20
QTY.
1
1
4
1
Penguin-0012
SECTION G-G
SCALE 1 : 1.5
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-013
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
Key
Glue to adjacent part and shaft No. Glue to adjacent part only
10
Loose part
No.
ITEM
PART NUMBER
NO.
1 bottom bob weight
No.
3
2
P
Pendulum shaft
5
6
7
8
9
10
6 6 4
DETAIL P
SCALE 2 : 3
5
Assembly retainer
1
1
1
2
2
1
1
1
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
DWG NO.
APPV'D
7 7
SECTION N-N
SCALE 1 : 3
QTY.
1
Note:
DESCRIPTION
A4
Penguin-0014
MFG
Q.A
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
No.
1
2
No.
No.
PART NUMBER
remontoire
counterbalance side
2 pence piece
remontoire
counterbalance pin
DESCRIPTION
QTY.
2
4
1
Note:
2
1
2
2
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
Pendulum-0015
APPV'D
MFG
Q.A
Remontoire counterbalance
WEIGHT:
SCALE:1:1
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM NO.
1
No.
No.
No.
PART NUMBER
Face
Dowels 9 x 58mm
long
DESCRIPTION
QTY.
1
Note:
Sand the end of the dowels until they fit snugly into both
the relevant holes in the face and the holes in the clock
frame.
Put a small amount of wood glue into the relevant holes
of the face and tap the dowels in until fully home. Fit
the assembly to the clock frame. This ensures that the
dowels are in the correct positions. Do not glue the
dowels into the frame. A friction fit is all that is required.
Set aside to dry.
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
Face assembly
DRAWN
CHK'D
MATERIAL:
Penguin-0016
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:5
SHEET 1 OF 1
Key
Glue to adjacent part and shaft
Glue to adjacent part only
Loose part
ITEM
PART NUMBER
NO.
1 Motor bracket spacer
No.
No.
No.
1
DESCRIPTION
QTY.
1
2
3
2
1
Wood Screws
Note:
Glue items 1, 2 (2 off) and 5 together with white glue. Use a piece of 3mm
rod for alignment and ensure that screw holes are aligned. A cocktail stick
or similar can be used to aligh screw holes.
Set aside to dry
Screw item 3 to the assembly using the two wood screws provided.
Set aside.
2
2
4
3
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
Penguin-0017
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:2
SHEET 1 OF 2
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
DWG NO.
APPV'D
A4
Penguin-0017
MFG
Q.A
WEIGHT:
SCALE:1:2
SHEET 2 OF 2
Key
Glue to adjacent part and shaft
No.
ITEM
PART NUMBER
NO.
1 M3 x 8 screw
2 6v motor
3 10 tooth motor wheel
4 Motor bracket assembly
5 2mm internal diameter O ring
6 Mercury switch
No.
No.
DESCRIPTION
Penguin-0017
Assembly retainer
heat shrink
QTY.
2
1
1
1
1
1
1
Note:
This assembly should be completed with the required wiring as per the next
drawing (Penguin-0018 sheet 2 of 2), although the wiring is not shown on
this drawing for the sake of clarity. The wiring schematic Penguin-0025
should also be refered to.
Cut 1 piece of red wire 380mm long, 1 red piece of wire 140mm long and 1
black piece of wire 460mm long.
Cut the terminals on the mercury switch to approximately 10mm long and
solder the two red wires to the terminals. Heat shrink the insulation to the
shorter length, making sure that it covers all exposed wiring. Set aside.
Remove the 2 screws from the motor bracket sub assembly and remove
the counterweight bracket.
Attach the motor to the bracket using the 2 screws provided and attach
the 10 tooth wheel to the motor. Apply a small amount of eopoxy to the
motor shaft if the wheel is a loose fit. Ensure that the wheel does not touch
the screws.
Using 'Blue tack, plastercine or similar, fit the mercury switch into the
housing as shown.
Thread the short red wire through hole 1 so that it can be soldered to the
motor terminal. Thread the long red wire through hole 2 so that it can be
threaded down the wiring conduit. Thread the black wire through hole 1
and hole 2 so that one end can be soldered to the motor and the other
threaded down the conduit. Reattach the counterweight bracket.
Solder the red and black wires to the correct motor terminals. The red wire
can be trimmed to minimise the amount of slack before soldering. The
black wire should be pulled through to minimise slack.
Set aside
Hole 1
Hole 2
DETAIL G
SCALE 2 : 1.5
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
APPV'D
Penguin-0018
MFG
Q.A
WEIGHT:
SCALE:1:2
SHEET 1 OF 2
Key
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
DWG NO.
APPV'D
A4
Penguin-0018
MFG
Q.A
WEIGHT:
SCALE:1:2
SHEET 2 OF 2
Key
10
6
8
ITEM
NO.
1
2
3
4
5
6
7
8
9
10
PART NUMBER
Hour hand assembly
Face assembly
Escape wheel assembly
60 tooth wheel assembly
30 tooth wheel assembly
Frame assembly
Motor bracket assembly
64 tooth wheel assembly
remontoire counterbalance
Pendulum shaft assembly
DRAWING
Penguin-0011
Penguin-0016
Penguin-0008
Penguin-0009
Penguin-0010
Penguin-0006
Penguin-0018
Penguin-0013
Penguin-0015
Penguin-0014
QTY.
1
1
1
1
1
1
1
1
1
1
A4
DWG NO.
Penguin-0020
SCALE:1:10
SHEET 1 OF 2
Note: Assemby
Note: Setting up
Set the top bob weight as low as possibe. This makes the clock
run easier. Adjustments can be made to this when the clock is
running.
The escape wheel assembly should be fitted first to the frame assembly.
Ensure that a washer is fitted adjacent to both bearings and that the
2mm O ring is fitted to prevent movement. Approximately 1mm of end
float (side to side movement) should exist.
Next fit the hour hand assembly. Check that this rotates freely on the
shaft before meshing with the 8 tooth gear. If it doesn't then the tube
probably needs deburring on the inside diameter. Fit the minute hand
and check that about 1-2mm of end float exists on the hour hand
assembly when the minute hand is pressed fully home.
The bob weight should be about 20mm from the top of the
frame to give an approximate setting.
At this point you can slide the remontoire assembly onto the 64 tooth
wheel shaft, in the horizontal position. Do not worry about completing
the wiring at this point. The clock will run for a minute or so under the
weight of the motor and disassembly is easier.
If the clock runs fast then the bob weight needs to be screwed
anticlockwise when viewed from the top. If the clock runs slow
the the reverse applies.
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
MFG
Q.A
A4
DWG NO.
APPV'D
WEIGHT:
SCALE:1:10
SHEET 2 OF 2
ITEM
NO.
1
2
3
4
5
6
7
8
9
10
10 4
PART NUMBER
DESCRIPTION
QTY.
remontoire counterbalance
Hour hand assembly
Face assembly
Escape wheel assembly
60 tooth wheel assembly
30 tooth wheel assembly
Frame assembly
Motor bracket assembly
64 tooth wheel assembly
Pendulum shaft assembly
Penguin-0015
Penguin-0011
Penguin-0016
Penguin-0008
Penguin-0009
Penguin-0010
Penguin-0006
Penguin-0018
Penguin-0013
Penguin-0014
1
1
1
1
1
1
1
1
1
1
2
6
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
Penguin-0021
APPV'D
MFG
Q.A
WEIGHT:
SCALE:1:10
SHEET 1 OF 2
PART NUMBER
frame
Base top section (penguin)
Base bottom section (Penguin)
Base Cover_Penguin
Face
64 tooth wheel
60 tooth wheel
30 tooth wheel
32 tooth wheel
escape wheel
10 tooth wheel
8 tooth wheel
Pendulum frame
64 tooth wheel shaft
60 tooth wheel shaft
30 tooth wheel shaft
Escape wheel shaft
Pendulum shaft
Cannon tube
M3 x 100 long brass rod
Dowels 9 x 58mm long
remontoire counterbalance pin
Wiring conduit
Hour hand
Minute hand
Minute hand O ring enclosure
Minute hand O ring enclosure blank
bottom bob weight
Top bob weight
10mm diameter blank
10mm x 3mm diameter spacer
M3 washer
Bearings 623
10mm x 4mm diameter spacer
Wood Screws
2mm internal diameter O ring
remontoire counterbalance side
2 pence piece
Self adhesive felt pad
Battery holder
Switch
6v motor
M3 x 8 screw
10 tooth motor wheel
Mercury switch
Connectors
heat shrink
Red wire
Black wire
Motor bracket spacer
mercury switch holder
mounting counterbalance
59 motor
bracket
60 motor mounting bracket
61 M3 brass dome headed nut
DESCRIPTION
QTY.
1
1
1
1
1
1
1
1
1
1
1
3
1
1
3 x 126 long brass rod(from 300 length)
3 x 68 long brass rod(from 300 length)
1
3 x 66 long brass rod(from 300 length)
1
3 x 50 long brass rod(from 150 length)
1
3 x 37 long brass rod (from 150 length)
1
4 OD x 3 ID x 50 long brass tube ( from length) 1
Cut fron length supplied
1
Cut from lengths supplied
2
2mm dia brass rod x 11 long(cut from length) 1
6mmOD brass tube x 150 lg
1
1
1
2
1
1
1
2
33
9
10
4
6
Assembly retainer
6
2
4
4
1
1
1
2
1
1
1
1
7 x 0.2 x 820mm long
1
7 x 0.2 x 560mm long
1
1
2
1
1
1
100mm long
100mm long
Negative
100mm long
Connector
100mm long
Positive
460mm long
Switch
Battery holder
140mm long
380mm long
Mercury switch
Note:
All wire lengths are approximate. These lengths may
be reduced depending on your soldering/routing
skills.
DEBUR AND
BREAK SHARP
EDGES
FINISH:
SIGNATURE
DATE
DRAWN
CHK'D
MATERIAL:
A4
DWG NO.
APPV'D
Penguin-0025
MFG
Q.A
Wiring schematic
WEIGHT:
SCALE:1:1
SHEET 1 OF 1