Hoppy Price*
John Baker*
Firouz Naderi*
*Jet Propulsion Laboratory
California Institute of Technology
H2M
Minimal Architecture
Introduction
H2M
Minimal Architecture
Inspiration Mars
H2M
Minimal Architecture
Technical
Fiscal
Engagement
Programmatic
Political
Solutions.
H2M
Minimal Architecture
Delivering on a
Time Horizon
That Anyone
Cares About
H2M
Minimal Architecture
Cis-Lunar Crew
Phobos Crew
Flat Budget
Mars Long Stay Crew
Current Programs
ISS to 2028
Support
1. Minimal architecture
Relying on limited set of elements already built or
planned by NASA and avoid complicated
developments (such as nuclear thermal propulsion)
H2M
Minimal Architecture
Challenges of a Crewed
Round Trip Travel to Mars
Challenges of Landing
and Taking off from Mars
with Crew
7
SLS
EUS
100KW
SEP Tugs
In-space
Chemical
Stages
Mars Surface
Elements
Crew Quarters
Orion
20t
Mars
Lander
20t
Landed
Infrast.
Module(S)
Habitat
Phobos
Minimal Architecture
Minimal Architecture
H2M
Minimal Architecture
10
Pre-placement
100 kWe
SEP Tug
SEP Payload:
Phobos Habitat
~300 days
Deimos
~3.5 years
100 kWe
SEP Tug
~75 days
~75 days
SEP Payload:
TEI Stage +
Phobos
Transfer Stage
(PTS)
TEI
MOI
~3.8 years
HMO
Orion
TMI
HEO
Crew launch
Architecture
was analyzed
for a crew of 4
Entry
Earth
11
TEI
PTS
First Launch
12
Second Launch
Phobos Hab
SEP Payload:
Phobos Habitat
~3.8 years
~3.5 years
HMO
HEO
Earth
14
MOI
HMO
Crew launch
Earth
15
Third Launch
Exhausted EUS is Jettisoned
SLS Block 2
Payload
Deep Space Habitat (DSH)
Mars Orbit Insertion (MOI) stage
Earth
16
Fourth Launch
SLS Block 2
Payload: Orion + crew of 4
Phobos
~300 days
Deimos
HMO
HEO
Earth
18
H2M
Minimal Architecture
19
Could be
relocated to
different sites
Could be re-used
by future crews
H2M
Minimal Architecture
20
HMO
TEI
Entry
Earth
21
H2M
Minimal Architecture
22
H2M
Minimal Architecture
23
Titan II
2nd stage
Dnepr
2nd stage
Proton
3rd stage
H2M
Minimal Architecture
24
H2M
Minimal Architecture
Minimal Architecture
23 t useful-landed-mass lander
- Crew of 2 to the surface, 24-day stay
- (Could support crew of 4 for 6 days)
MAV to LMO
LMO
TEI Stage
Aerocapture
into
HMO
100 kWe
SEP Tug
Inject to
Mars
MAV to HMO
HMO
MOI
DSH resupply
module
DSH
MOI
Stage
Loiter
in HEO
MAV
Lander
TEI Stage
Boost stage
Lander
Aerobrake
to LMO
TEI
~450 days
EUS
TMI
~3.8 years
HEO
2-man
Lander
~3.5 years
EUS
T= -4.5
years
T= -2.5
years
T= -4
years
T= -2
years
Crew
launch
T= -6
months
T= -2
days
Architecture was
analyzed for a crew
of 4, of which 2
land on Mars
Entry
Earth
27
Re-stowable
HGA
9m
12 m
MAV Ascent
Launch
Cruise/Crew Transfer/Entry
Final Descent/Landing
28
Hypersonic
Aeromaneuvering
Supersonic
Retropropulsion
Powered Descent:
Const. V Phase
Ground
Acquisition
H2M
Minimal Architecture
Touchdown
Vrel < 5 m/s
NASA
H2M
Minimal Architecture
Space X
30
Landed Configuration
Rover lowered
and deployed
H2M
Minimal Architecture
31
Mars Ascent
Vehicle (MAV)
Descent
Stage
H2M
Minimal Architecture
32
# Vehicles
per Mission
Orion
SLS
SEP Tug
In-Space Chemical
Propulsion Stages
Mars Lander
H2M
Minimal Architecture
33
H2M
Minimal Architecture
34
Cislunar
ISS
Phobos Lander
H2M
Minimal Architecture
35
Notional Timeline
Orion Second
Crewed Flight
Orion First
Crewed Flight
SLS Initial Test
Mars Sim 1
Mars Sim 2
Crew to Phobos
Crew to Mars
(1 year)
Crew to Mars
(Short stay)
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
Build Up Infrastruc.
H2M
Minimal Architecture
Cislunar
Mars
36
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040
EM-1
Un-crewed
Mars EDL test
SEP DEMO
EM-3
Test Flight
Mars
Sim#2
EM-2
Test Flight
SEP
Cargo 1&2 DSH
EM4/EAM/Mars
Sim1
Orion
SEP
Cargo 1&2
Mars Lander
Mission
First Mars
System Mission
Lunar Proving
Ground
Uncrewed
Missions
CY
130 t SLS
Mars
System
ISS LEO
Lunar
Mars
Lander
Orion
DSH
Mars
Surface
37
H2M
Minimal Architecture
38
Cis-Lunar Crew
Phobos Crew
Flat Budget
Mars Long Stay Crew
Current Programs
ISS to 2028
Support
39
Mars Lander
2046
Phobos Lander
2038
Based on DRA 5
ISS crew
Cis-Lunar Crew
Phobos Crew
Flat Budget
Mars Long Stay Crew
Current Programs
ISS to 2028
Support
40
Mars Lander
Short Stay
2039
Phobos Lander
2033
Mars Lander
Long Stay
2043
ISS crew
Cis-Lunar Crew
Phobos Crew
Flat Budget
Lunar Sortie Crew
Current Programs
41
High TRL
Pathway
with ISS to 2024
Mars Lander
Short Stay
2039
Phobos Lander
2033
Mars Lander
Long Stay
2043
ISS crew
Cis-Lunar Crew
Phobos Crew
Flat Budget
Lunar Sortie Crew
Current Programs
ISS to 2024
42
Takeaways
This work was aimed at showing an example (an
existence proof) that journeys to Mars could be
doable using technologies that NASA is currently
pursuing and and on a time horizon of interest to
stakeholders -- without large spikes in NASA
budget.
Program system engineering is key in balancing
several competing constraints
H2M
Minimal Architecture
43
In Conclusion
Mars is Possible
and in a time
horizon of interest