You are on page 1of 4

DISEO DE MURO EN VO

PROYECTO :

CONSTRUCCION MURO EN VOL


para =0

=
=

30
0.5

0.5 Radianes

c=
m=

2.4

Ton/m3

1.9
20.00

Ton/m3
Ton/m2

3
2

6.400

h=H+Df

6.00 m

h1=h-0.1h

qs=

Desnivel H

INGRESAR DATOS:

0.4000
Df

0.72

P=h/10min

1.2

2.74

b''=0.1@0.12h

T=B-(pie+b'')

d=0.1
h

0.80

B=0.4h @ 0.6h

4.32 m
1. RESULTADOS TEORICOS Y CRITERIO DE ASUMIR :
h

BASE (B)

7.20

PIE (h/10)min

b''=.1h@.12h

TALON

d=0.1h

0.720

0.8640

2.736

0.72

PIE (B/3)

b''=0.1h

TALON

d=0.1h

0.720

0.86

2.736

0.80

Vol y L

W (Ton)

Xi

1.80
1.92
17.51
3.46
0.29
0.01
2.74 m

4.33
4.61
33.27
8.29
0.55
0.01
4.10
55.17

1.10
1.43
2.95
2.16
0.36
0.73
2.95

4.32

RESULTADOS ASUMIDOS SOLO EN d:


h

BASE (B)

7.20

4.32

2. COMPONENTES DE GRAVEDAD:
N

Elemento

1 Triang. Muro
2 Frotal Muro
3 Relleno Talon
4 Losa Ciment.
5 Relleno Pie
6 Relleno Pie
7 s/c

(Ton/m3)

2.4
2.4
1.9
2.4
1.9
1.9
2 Ton/m2

w
3. RESULTADOS TEORICOS:

Ka=

0.333

Pa=

4.56

Ton/m2/m

Mr

Kp=
/=(/)/""

Pp=

3.00

hs/c= 0.79 m
Ps/c=
0.500
=+/

Ton/m /m

Pat= 5.06

Ton/m2/m

6.84

Ton/m2/m

El empuje activo horizontal total sera:


2

al area del trapecio de presiones


=((+/))/"2"
=((2+3/))/3(+2/
Eah=
y=

20.02 Ton/m
2.62 m

4. UBICACION DE LA RESULTANTE DE FUERZA VERTICAL

=(())/("" )
a=

1.59 m

nota: si Eha=o "a" cae casi en el centro de la losa


B/3
Si a=B/3
Si a < B/3
Si a > B/3
1.44
0
0 Resultante fuera del terc

5. VERIFICACION POR VOLTEO

6. VERIFICACION POR DESLIZAMIENTO

friccion suelo-hormigon
=

=
Mv=

52.36

fsh=
27.58 Ton/m
=((+))/
> 1.5

=(())/
(() ) > 2
FSv=
2.67
Cumple

FSd=

=*h'

8. CONSIDERANDO DENTELLON

Peso del dentellon trapeziodal


ancho=
1.5
angulo=
45
0.8 Radianes
Profun.=
0.5
Vdet=

0.50 m3

1.58 Ton/m
Cumple

Wdet=
w

Kp=
3.00
=(^)/2
Eph=
5.81 Ton/m
y=
0.57 m
1.20 Ton
56.37 Ton

1=((4

URO EN VOLADIZO

N MURO EN VOLADIZO
Ingresar
Asumir
Resultados

INGRESAR DATOS:

H=
Df=
b=

6
1.2
0.3

S/C=

1.50

m
m
m

Ton/m2
0.035

7.20

0.40
0.72

0.564
m

Pie=h/10 min

0.30
b

4
B=0.4h @ 0.6h

h1

Talud()

6.480

85.02568

0.56

0.30

h1

Talud()

6.400

85.03

0.56

0.30
0.500
*/=

hs/c *hs/c

4.75
6.61
98.21
17.92
0.20
0.01
12.12
139.81

h1

Mr=W*Xi

Eah
1

20.02

Eph

h'

1.2

2.62 m

*h=*h

5.06
El empuje pasivo horizontal total sera:

=*h'

al area del triangulo de presiones

/))/3(+2/)

=(^)/2
Eph=
y=

B/6=
Exentr. e=
ante fuera del tercio medio

0.72
0.57 m

4.10 Ton/m
0.40 m
condicion si e <= B/6 repartir carga
uniforme a lo largo de la zapata
repartir carga rectangular

7. VERIFICACION PRESIONES SUELO

Caso si a=B/3
1=((46))/^2

2=((62))/^2

22.97
Caso si a< B/3

=/2
1=2=/

2.57
1=(2)/

Caso si a > B/31=(2)/(3)

2=0

q1=

2=0

q1=
Presion suelo

h'=
Pp=

1.7
9.69

Ton/m2/m

VERIFICACION POR DESLIZAMIENTO

friccion suelo-hormigon
=
fsh=

28.18 Ton/m

=((+))/
> 1.5
FSd=
1.70 Ton/m
Cumple

12.77
Cumple
25.5 Ton/m2
23.2 Ton/m2
Corregir Burrazo