You are on page 1of 60

LEAD CHARGES

Earth/Gravel/
Sand
loading
10.00
unloading
8.50
stacking
5.50
0.25
50.00
0.5
75.00

Cost of Materials, Labour


Metal
12.80
8.70
8.70
110.00
110.00

1
2
3
4
5
6
7

100.00
106.00
112.00
118.00
124.00
130.00
136.00

120.00
126.00
132.00
138.00
144.00
150.00
156.00

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

142.00
148.00
154.00
160.00
166.00
172.00
178.00
184.00
190.00
196.00
202.00
208.00
214.00
219.00
224.00
229.00
234.00
239.00
244.00
249.00
254.00
259.00
264.00
268.80
273.60
278.40
283.20
288.00
292.80
297.60
302.40
307.20
312.00

162.00
168.00
174.00
180.00
186.00
192.00
198.00
204.00
210.00
216.00
222.00
228.00
234.00
239.75
245.50
251.25
257.00
262.75
268.50
274.25
280.00
285.75
291.50
297.00
302.50
308.00
313.50
319.00
324.50
330.00
335.50
341.00
346.50

Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for Mortar
Sand for Filling
HYSD Steel
Mild Steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mazdoor skilled

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

316.80
321.60
326.40
331.20
336.00
340.80
345.60
350.40
355.20
360.00
364.60
369.20
373.80
378.40
383.00
387.60
392.20
396.80
401.40
406.00
410.60
415.20
419.80
424.40
429.00
433.60
438.20
442.80
447.40
452.00
456.60
461.20
465.80
470.40
475.00
479.60
484.20
488.80
493.40
498.00
502.40
506.80
511.20
515.60
520.00
524.40
528.80
533.20
537.60
542.00

352.00
357.50
363.00
368.50
374.00
379.50
385.00
390.50
396.00
401.50
406.50
411.50
416.50
421.50
426.50
431.50
436.50
441.50
446.50
451.50
456.50
461.50
466.50
471.50
476.50
481.50
486.50
491.50
496.50
501.50
506.50
511.50
516.50
521.50
526.50
531.50
536.50
541.50
546.50
551.50
556.25
561.00
565.75
570.50
575.25
580.00
584.75
589.50
594.25
599.00

Mazdoor unskilled
Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 35 KVA
Concrete mixer 0.4/0.28 cum
Tipper 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader

91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140

546.40
550.80
555.20
559.60
564.00
568.40
572.80
577.20
581.60
586.00
590.20
594.40
598.60
602.80
607.00
611.20
615.40
619.60
623.80
628.00
632.20
636.40
640.60
644.80
649.00
653.20
657.40
661.60
665.80
670.00
674.20
678.40
682.60
686.80
691.00
695.20
699.40
703.60
707.80
712.00
716.20
720.40
724.60
728.80
733.00
737.20
741.40
745.60
749.80
754.00

603.75
608.50
613.25
618.00
622.75
627.50
632.25
637.00
641.75
646.50
651.00
655.50
660.00
664.50
669.00
673.50
678.00
682.50
687.00
691.50
696.00
700.50
705.00
709.50
714.00
718.50
723.00
727.50
732.00
736.50
741.00
745.50
750.00
754.50
759.00
763.50
768.00
772.50
777.00
781.50
786.00
790.50
795.00
799.50
804.00
808.50
813.00
817.50
822.00
826.50

141
142
143
144
145
146
147
148
149
150

758.20
762.40
766.60
770.80
775.00
779.20
783.40
787.60
791.80
796.00

831.00
835.50
840.00
844.50
849.00
853.50
858.00
862.50
867.00
871.50

abour

360.00
390.00
500.00
136.00
117.00
71.00
95.00
114.00
98.00
114.00
156.00
39.75
82.00
500.00
830.00
845.00
690.00
560.00
430.00
234.00
225.00
56.00
500.00
830.00
845.00
690.00
560.00
430.00
175.00
60.00
31500.00
32000.00 January, 2009
4000.00
31000.00
70.00
67.00
45.00
20.00
36.00
188.00
193.40

146.00
2760.00
2600.00
2250.00
1320.00
575.00
1550.00
540.00
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
1090.00
620.00
345.00
4.50
4.50
40.00

ABOUT ESTIMATE
1

Name of the wor Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram Podalada road from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road
from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km 0/0 to 11/350 (e)
Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.

Names of the roads


1 Sivakodu - Manepalli road from km 0/0 to 13/675
2 Rajavaram - Podalada road from km 59/6 to 61/425
3 Tatipaka - Tatipakamatam road from km 0/0 to 2/0
4 Razole - Ponnamanda road from km 0/0 to 11/350
5 Mulikipalli - Gogannamatam road from km 0/0 to 7/4
6
7

Section

Asst. Executive Engineer (R&B),


R&B Section : Razole

Sub - Division

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Division

Executive Engineer (R&B),


R&B Division : Amalapuram

Circle

Superintending Engineer (R&B),


R&B Circle : Kakinada

ROADS & BUILDINGS DEPARTMENT


MAINTENANCE FOR THE YEAR 2012-2013
Name of work : Mtc of (a) Sivakodu - Manepalli road from km
0/0 to 13/675 (b) Rajavaram - Podalada road
from km 59/6 to 61/425 c) Tatipaka Tatipakamatam road from km 0/0 to 2/0 (d)
Razole - Ponnamanda road from km 0/0 to
11/350 (e) Mulikipalli - Gogannamatam road
from km 0/0 to 7/4 for the year 20012-13.

Estmate Amount :

Rs. 6,93,000 /R&B Section : Razole

R&B Sub-division : Razole


R&B Division : Amalapuram
R&B Circle : Kakinada
EAST GODAVARI DISTRICT

Specification report accompany the Estimate for the work of


Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km 59/6
to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km
0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Amount of Estimate :

Rs.6,93,000 /-

The roads (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km 0/0 to
11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 are important Major District roads in East Godavari
District in the jurisidiction of (R&B) Section, Razole of (R&B) Sub-division, Razole.
NECESSITY:
These roads connects number of villages and number of R&B roads and heavy intensity of traffic flows
on these roads as the public of all the villages travels on this road. Hence it is very much necessary to maintain all
these roads pothole free and traffic worthy for the year 20012-13.
AUTHORITY:
The Govt. of A.P vide G.O.Ms.No. 132 Dt. 22-06-2005 has communicated guide lines for mtc. of Roads.

The following specifications / provisions are adopted in the estimate.


1

Providing BT patch work with 40mm HBG and 9.50-11.20mm HBG chips

Providing patch work with Wet Mix Macadam

Sectioning of Berms, Removing High berms, Filling low berms and Scours with gravel etc.

Jungle clearance from the road embankment.

Repairs and Painting to culverts.

Fixing of missing KM & HM stones and Guard stones

Other provisions such as painting KM, HM, Guard stones etc.

Provision for VAT

Provision for Technical Agents

10 Provision for insurance Premium


11 Provision for price adjustment
12 Provision for D.T.P. Charges, Xerox charges, Advertisement charges, Car hire charges and other unforeseen
items
RATES:
The rates are worked out based on Circular Memo No.Maintenance/EE(TEC) /TA.13/AE.4/2006,
dt.18.03.2006 of Chief Engineer (R&B). Roads and current common SSR for the year 2008 - 2009 duly adopting
nearest approved quarries. Seigniorage charges are actually payable to the Mines and Geology department.
Hence, necessary provision is made in the estimate. Provision for VAT is shown separately in the estimate as per
G.O.Ms No 141, T(R&B) Dept., Dt 27.07.2006.
The work will be carried out as per standard specifications of MORT&H, APSS, circulars and latest
G.O's communicated from time to time.

Asst. Executive Engineer (R&B),


R&B Section : Razole

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

1) Sub-Division

(R&B) Sub Division, Razole

2) Section

(R&B) Section, Razole

3) Name of the Road

Sivakodu - Manepalli road from km 0/0 to 13/675

4) Classification

M.D.R.

5) Length of the road

13.675 Kms.

6) Road width

S.L. :

7) Surface of the road

C.C. :

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

--

I.L. : 12.937 kms

D.L. :

0.738 kms

B.T. : 13.675 kms

WBM :

--

UM: --

Stretch

Length

During the
year

--

--

--

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
Intermediate Lane
Double Lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

Amount
required

---

Rs. 12,000 /-

---

12.937 Kms
0.738 Kms

--Rs. 13,500 /Rs. 15,000 /-

-174650
11070

---

Rs. 6,000 /-

---

TOTAL

Rs. 185,720 /-

ADD 50 %
Total Amount including 50% extra for Amalapuram Division
10) Any other Remarks

Rs. 92,860 /Rs.278,580 /-

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

1) Sub-Division

(R&B) Sub Division, Razole

2) Section

(R&B) Section, Razole

3) Name of the Road

Rajavaram - Podalada road from km 59/6 to 61/425

4) Classification

M.D.R.

5) Length of the road

1.825 Kms.

6) Road width

S.L. : - 1.825 Kms

I.L. :

7) Surface of the road

C.C. :

B.T. : 1.825 Kms.

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

--

--

D.L. :

--

WBM :

--

UM: --

Stretch

Length

During the
year

--

--

--

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

Amount
required

---

Rs. 12,000 /-

---

1.825 Kms

Rs. 15,000 /-

---

Rs. 6,000 /TOTAL


ADD 50 %

Total Amount including 50% extra for Amalapuram Division


10) Any other Remarks

Rs.27,375 /--Rs.27,375 /Rs. 13,688 /Rs.41,063 /-

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

1) Sub-Division

(R&B) Sub Division, Razole

2) Section

(R&B) Section, Razole

3) Name of the Road

Tatipaka - Tatipakamatam road from km 0/0 to 2/0

4) Classification

M.D.R.

5) Length of the road

2 Kms.

6) Road width

S.L. : 2.000 Kms

I.L. :

7) Surface of the road

C.C. :

B.T. : 2.000 Kms.

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

--

--

Stretch
---

D.L. :

--

WBM :

--

UM: --

Length

During the
year

---

---

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

2.000 Kms

Rs. 12,000 /-

---

Rs. 15,000 /-

---

---

Rs. 6,000 /-

---

TOTAL

ADD 50 %
Total Amount including 50% extra for Amalapuram Division
10) Any other Remarks

Amount
required

Rs.24,000 /-

Rs.24,000 /-

Rs. 12,000 /Rs.36,000 /-

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

1) Sub-Division

(R&B) Sub Division, Razole

2) Section

(R&B) Section, Razole

3) Name of the Road

Razole - Ponnamanda road from km 0/0 to 11/350

4) Classification

M.D.R.

5) Length of the road

11.350 Kms.

6) Road width

S.L. : 11.350 km

I.L. :

7) Surface of the road

C.C. :

B.T. : 11.35 Kms.

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

--

--

Stretch
---

D.L. :

--

WBM :

--

UM: --

Length

During the
year

---

---

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

11.350 Kms

Rs. 12,000 /-

---

Rs. 15,000 /-

---

---

Rs. 6,000 /-

---

TOTAL

ADD 50 %
Total Amount including 50% extra for Amalapuram Division
10) Any other Remarks

Amount
required

Rs.136,200 /-

Rs.136,200 /-

Rs. 68,100 /Rs.204,300 /-

Checkslip accompanying the detailed estimate for Road Maintenance works


for the year 2012-2013
Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

1) Sub-Division

(R&B) Sub Division, Razole

2) Section

(R&B) Section, Razole

3) Name of the Road

Mulikipalli - Gogannamatam road from km 0/0 to 7/4

4) Classification

M.D.R.

5) Length of the road

7.400 Kms.

6) Road width

S.L. : - 7.400 Kms

I.L. : -- -

D.L. : --

7) Surface of the road

C.C. : 0.200 kms

B.T. : 7.200 Kms.

WBM : ---

8) Recent improvements takenup


(under SRP/NABARD/CRF/
Corenetwork/others)
(Particulars shall be noted
for last two years)

Stretch
---

UM:

Length

During the
year

---

---

9) Amount required as per KM war rate vide G.O. Ms. No. 132 T,R&B Dept., dt.22.6.2005

A) B.T. Road
a) Single Lane
b) Double Lane / Other Multi lane
B) WBM / Gravel / Other Roads

Length
in Kms.

KM war
rate per KM

7.400 Kms

Rs. 12,000 /-

---

Rs. 15,000 /-

---

---

Rs. 6,000 /-

---

TOTAL

ADD 50 %
Total Amount including 50% extra for Amalapuram Division
10) Any other Remarks

Amount
required

Rs.88,800 /-

Rs.88,800 /-

Rs. 44,400 /Rs.133,200 /-

ABSTRACT
Name of work :

Sl.
No.

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road
from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km
0/0 to 7/4 for the year 20012-13.

Name of the road

Classification

Eligibility amount as
Restricted to
per G.O. (including
75% amount
50% Addl. Grant)

Sivakodu - Manepalli road from km 0/0 to 13/675

M.D.R.

Rs.278,580 /-

---

Rajavaram - Podalada road from km 59/6 to 61/425

M.D.R.

Rs.41,063 /-

---

Tatipaka - Tatipakamatam road from km 0/0 to 2/0

M.D.R.

Rs.36,000 /-

---

Razole - Ponnamanda road from km 0/0 to 11/350

M.D.R.

Rs.204,300 /-

---

Mulikipalli - Gogannamatam road from km 0/0 to 7/4

M.D.R.

Rs.133,200 /-

---

TOTAL

Restricted to

Or Say

--------------------------- -------------------Rs.6,93,143 /---

Rs 6,93,000 /--------------------------- --------------------

Asst. Executive Engineer (R&B),


R&B Section : Razole

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Schedule of provisions provided in the Maintenance estimate as per


G.O.Ms. No.132, T(R&B) Dept., Dt.22.06.2005

Sl.
No
.

Name of the road

: Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada
road from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d)
Razole - Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam
road from km 0/0 to 7/4 for the year 20012-13.

Eligible amount

: Rs.6,93,000 /-

Details of Provision

Amount provided
%age of amount
in the estimate
as per G.O.
(in Rs.)

%age of amount
provided in the
estimate

a B.T. Pot hole filling B.T. edge repairs, (and other


itmes on B.T. Cariageway such as crack sealing,
minor surface repair, etc.,)

55% to 65%

Rs.5,77,041 /-

83.27%

b Unpaved shoulder repair (Berms) / Surface


drains maintenance / including gravelling berms

7% to 13%

Rs.31,915 /-

4.61%

c Jungle clerance / tree and shrub trimming

4% to 6%

Rs.10,000 /-

1.44%

d Culvert repairs / vents maintenance / parapet


wall repairs / retaining wall repair, etc.,

5% to 9%

Rs.9,169 /-

1.32%

e Bridge repairs including expansion joints /


bearings / parapets, etc.,

2% to 4%

Rs.0 /-

0.00%

7% to 13%

Rs.28,771 /-

4.15%

Sign maintenance / guard stones maintenance /


painting KM / HM stones

g Other Items (RCC pipes)

4% to 6%

--------------------------- ------------------------------Rs.6,56,896 /94.79%

h Provision for VAT @ 4%

Rs.26,500 /-

Provision for Technical agents

Rs.2,000 /-

Provision for Insurance Premium

Rs.2,000 /-

k Provision for Price Adjustment


l

Unforeseen items such as DTP charges, Xerox


charges, etc.

Rs.5,000 /Rs.604 /Rs.6,93,000 /-

Note : The total of all the above items shall not exceed the
Kilometrage rates. The percentage of individual items
can be diverted to other fruitful needy items only ofter
completing the particular item in full.
Estimate Value shall be restricted to 75% of the amount
arrived based
Any other Remarks
: on KM War rates of the G.O.

Asst. Executive Engineer (R&B),


R&B Section : Razole

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

DETAILED CUM ABSTACT ESTIMATE


ame of the work: Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram
- Podalada road from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road
from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km 0/0 to 11/350
(e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year
20012-13.
Sl
.
N
o
1

Description of item

No

Length

Breadt
h
5

Depth
6

Quantit
y
7

Rate /
per
8

Amount
9

1 Providing B.T. patch work with 40-45 mm HBG metal using 80/100 Grade
Bitumen at 42Kgs / 1Cum including cost of materials and cost of Bitumen
and labour charges for all operations such as trimming the edges of the pot
holes, cleaning the surface, applying tack coat with hot Bitumen, carrying and
spreading stone ballast by hand tamping with rammers, spreading Bitumen to
the required consistency including fuel charges for heating Bitumen and hire
and all other incidental charges and operations charges of Bitumen boiler,
etc., complete for finished item of work.
As per separate sheet enclosed

72.00
Cum.

### 254,880.00
/ 1 Cum.

2 Providing B.T. patch work with 9.50-11.20 mm HBG machine crushed chips
using 80/100 Grade Bitumen at 72Kgs / 1Cum including cost of materials
and cost of Bitumen and labour charges for all operations such as trimming
the edges of the pot holes, cleaning the surface, applying tack coat with hot
Bitumen, carrying and spreading stone ballast by hand tamping with
rammers, spreading Bitumen to the required consistency including fuel
charges for heating Bitumen and hire and all other incidental charges and
operations charges of Bitumen boiler, etc., complete for finished item of work.

As per separate sheet enclosed

51.00
Cum.

### 261,681.00
/ 1 Cum.

3 Providing, Laying, Spreading and compacting graded HBG crushed stone


aggregate to Wet Mix macadem specification including cost,seignorage of all
materials and including premixing the material with water at OMC in
Mechanical mix plant carriage of mixed material by tipper to site , laying in
uniform layers with paver in
base courses on well prepared surface and
compacting with Vibratory roller to acheive the desired density etc., as
directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4th
revision) for finished item of work.

As per separate sheet enclosed

36.00
Cum.

###
/ 1 Cum.

60,480.00

3.00
/ 1 Sqm.

4,500.00

4 Stripping the excess soil from the shoulder surface / Making up loss of
material / irregularities on the shoulder to the design level by adding fresh
approved soil and compacting with appropriate equipment for sectioning the
berms / shoulders as per MORT&
As per separate sheet enclosed

1500
Sqm.

5 Earthwork excavation and depositing on banks with an initial lead of 10 mts.


and initial lift of 2 mts. in loamy and clayey soils like black cotton soils, red
earth and ordinary gravel etc., complete for cutting high berms and filling low
berms.

2
3
As per separate sheet enclosed

7
10.00
Cum

8
59.50
/ 1 Cum

9
595.00

6 Providing gravel irrespective of thickness in layers including cost of gravel,


spreading, watering and rolling with hand roller etc., complete.
As per separate sheet enclosed

45.00
Cum

596.00
/ 1 Cum

26,820.00

5000
Sqm.

2.00
/ 1 Sqm.

10,000.00

3.00
Cum

###
Cum

7,683.00

20
Sqm.

743.00
10 Sqm

1,486.00

2.00
Nos.

786.00
/ each

1,572.00

3.00
Nos.

357.00
/ each

1,071.00

20.00

655.00

13,100.00

7 Clearing light Jungle / Scrub Jungle from berms of the road embankment
As per separate sheet enclosed

8 Brick Masonry in CM (1:8) using 2nd class bricks having a crushing


strength of 35 kgs / sqm including cost, conveyance and
seigniorage of all materials, labour charges, etc., complete as per
standard specifications for finished item of work
As per separate sheet enclosed

9 Plastering 12mm thick in CM (1:5) including cost, conveyance and


seigniorage charges of all materials including labour charges, etc.,
complete as per standard specifications for finished item of work
As per separate sheet enclosed

10 Cost and supply and fixing of KM stone of size 1.10M x 0.37M x


0.25M using R.C.C. (1:2:4) mix using 20mm size HBG MC chips and
5.50 Kgs of steel its fabrication charges & conveyance to site at
different places
where ever
necessary including cost and
conveyance of all materials to work etc., complete.

As per separate sheet enclosed

11 Cost and supply and fixing of HM stone of size 0.90M x 0.20M x


0.20M using R.C.C. (1:2:4) mix using 20mm size HBG MC chips and
3.31 Kgs of steel its fabrication charges & conveyance to site at
different places
where ever
necessary including cost and
conveyance of all materials to work site etc., complete.

As per separate sheet enclosed

12 Cost, supply and fixing of Guide stones of size 1.20M x 0.20M x


0.20M using V.R.C.C (1:2:4) mix using 20mm size SS 5 HBG MC
chips and 3.737 kgs of Steel and its fabrication charges and
conveyance to different places including digging pit of size 0.45 x
0.45m 0.50M & fixing the stone in position with C.C. (1:5:10) mix
with 40mm size HBG metal in bottom 100MM thick and arranged
the stone & including cost and conveyance of all materials to work
site etc., complete.
As per separate sheet enclosed

7
Nos.

8
/Each

1
2
3
4
5
6
7
13 White washing two coats with best shell sime slaked and screened from
approved source including cost and conveyance of shell lime, gum, gangi
water, pickley peace juce, etc., complete for finished item of work as directed
by the Engineer-in-Charge.
As per separate sheet enclosed

800.00
Sqm

57.00
10 Sqm

4,560.00

14 Providing Synthetic Enamel Paint Single coat including cost of Paint,


conveyance to site and labour charges for all operations viz., cleaning,
washing, painting etc., complete for finished item of work
As per separate sheet enclosed

210.00 258.00
Sqm. / 10 Sqm.

15 Painting letters and figures of size 5to 8 and 8 to 10 cm with synthetic enamel
paint on 5th km, km, HM and guide stones and village pedestals etc.
complete.
As per separate sheet enclosed
1,525.00
Nos

2.00
Each

5,418.00

3,050.00

---------------656,896.00
26,500.00

16 Provosion for VAT @ 4%


17 Provision for technical agents

2,000.00

18 Provision for Insurance premium

2,000.00

19 Provision for Price Adjustment

5,000.00

20 Unforeseen items such as DTP charges, Xerox charges, Advt. charges, Car hire charges e

Total

604.00

###

Asst. Executive Engineer (R&B),


Deputy Executive Engineer (R&B),
Executive Engineer (R&B),
R&B Section : Razole
R&B Sub-division : Razole R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

-:oOo:-

Sivakodu - Manepalli road from km 0/0 to 13/675


Reach proposed in the present estimate:
Centre KM of the Working Reach

=
=

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156 / 595
From km
58 / 250
to
31 / 735
From km
/
to
/
6.838
Working K.M.
K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 183 / 200
to
156
From km
58 / 250
to
31
From km
/
to
6.838
Working K.M.
K.M.
c) Total lead

km 0
/ 000 to 13
0.000 + (13.675 -0.000)/2
6.838 K.M.

675

of NH 5
of NH 5 to RP road
of Kadali Irrigation channel road

/ 200 of Kakinada - Rajahmundry Road


/ 595 of NH 5
/ 735 of NH 5 to RP road
/
of Kadali Irrigation channel road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
6.838
Working K.M.
K.M.
Total lead

2.200 kms
kms
kms
kms
kms
kms
75.000 kms

0.000 kms

38.405
26.515
0.941
6.838
74.899

=
=
=
=
=
=
Or say:

4.600
26.605
26.515
0.941
6.838
65.499

=
=
=
=
=
=
Or say:

0.110###
kms
0.200###
kms
9.178 kms
0.941 kms
6.838 kms
###
17.267 kms
###
17.000 kms

=
=
=
=
=
=
=
=
=
Or say:

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

13.675 kms
6.838 kms

=
=
=
=
=
Or say:

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km
/
to
/
of Visakhapatnam - Kathipudi
From km
/
to
/
of Kathipudi - Amalapuram road
From km
/
to
/
of A.B road upto Ambajipeta
From km
/
to
/
of A.G. road
From km
49 / 200
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
Working K.M.
6.838
K.M.
c) Total lead

Asst. Executive Engineer (R&B),


R&B Section : Razole

kms
kms
kms
kms
kms
kms
65.000 kms

1.600
120.600
96.300
7.270
6.595
9.050
0.941
6.838
249.194
249.000

Executive Engineer (R&B),


R&B Division : Amalapuram

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

-:oOo:-

Rajavaram - Podalada road from km 59/600 to 61/425


Reach proposed in the present estimate:
Centre KM of the Working Reach

=
=

A) For HBG metal:


HBG metal from Rayavaram quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156 / 595
From km
59 / 600
to
31 / 735
Working K.M.
c) Total lead
B) For gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
59 / 600
to
Working K.M.
c) Total lead

km 59 / 600 to 61
0.000 + (61.425 -59.600)/2
0.913 K.M.

425

of NH 5
of NH 5 to RP road

60 / 200 of Kakinada - Rajahmundry Road


156 / 595 of NH 5
31 / 735 of NH 5 to RP road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
59 / 600 of Rajavaram - Podalada Road
Working K.M.
c) Total lead

2.200 kms
kms
kms
kms
kms
69.000 kms

0.000 kms

38.405
27.865
0.913
69.383

=
=
=
=
=
Or say:

4.600
26.605
27.865
0.913
59.983

=
=
=
=
=
Or say:

0.110###
kms
0.200###
kms
10.528 kms
0.913 kms
11.751 kms
12.000 kms

=
=
=
=
=
=
=
=
Or say:

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

1.825 kms
0.913 kms

=
=
=
=
Or say:

D) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km
/
to
/
of Visakhapatnam - Kathipudi
From km
/
to
/
of Kathipudi - Amalapuram road
From km
/
to
/
of A.B road upto Ambajipeta
From km
/
to
/
of A.G. road
From km
49 / 200
to
59 / 600 of Rajavaram - Podalada Road
Working K.M.
Add lead for the center of reach

Asst. Executive Engineer (R&B),


R&B Section : Razole

kms
kms
kms
kms
kms
60.000 kms

1.600
120.600
96.300
7.270
6.595
10.400
0.913
243.678
243.000

Executive Engineer (R&B),


R&B Division : Amalapuram

kms
kms
kms
kms
kms
kms
kms
kms
kms

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.
-:oOo:-

Tatipaka - Tatipakamatam road from km 0/0 to 2/0


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
156
From km
58 / 250
to
31
From km
/
to
From km
13 / 675
to
13
1.000
Working K.M.
K.M.
c) Total lead

B) For gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 183 / 200
to
156
From km
58 / 250
to
31
From km
/
to
From km
13 / 675
to
13
1.000
Working K.M.
K.M.
c) Total lead

=
=

/ 595
/ 735
/
/ 000

/
/
/
/
/

km 0
/ 0 to 2
0.000 + (2.000 - 0.000)/2
1.000 K.M.

of
of
of
of

000

NH 5
NH 5 to RP road
Kadali Irrigation channel road
S M road

200 of Kakinada - Rajahmundry Road


595 of NH 5
735 of NH 5 to RP road
of Kadali Irrigation channel road
000 of S M road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
From km
13 / 675
to
13 / 000 of S M road
1.000
Working K.M.
K.M.
c) Total lead

D) For Bitumen & Emulsion


a) Lead from ex-factory a
b) Metalled road length:
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
/
to
From km
49 / 200
to
From km
/
to
From km
13 / 675
to
Working K.M.
1.000
Add lead for the center of reach

2.000 kms
1.000 kms

2.200 kms

=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
69.000 kms

0.000 kms

38.405
26.515
0.941
0.675
1.000
69.736

=
=
=
=
=
=
=
Or say:

4.600
26.605
26.515
0.941
0.675
1.000
60.336

=
=
=
=
=
=
=
Or say:

0.110###
kms
0.200###
kms
9.178 kms
0.941 kms
0.675 kms
1.000 kms
###
12.104 kms
12.000 kms

kms
kms
kms
kms
kms
kms
kms
60.000 kms

:
Visakhapatnam Refinery
/
of Refinery to V-V road (NH.5)
/
of Visakhapatnam - Kathipudi
/
of Kathipudi - Amalapuram road
/
of A.B road upto Ambajipeta
/
of A.G. road
58 / 250 of Gannavaram to Chakalipalem
/
of Kadali Irrigation channel road
13 / 000 of S M road
0

=
=
=
=
=
=
=
=
=
=
Or say:

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

1.600
120.600
96.300
7.270
6.595
9.050
0.941
0.675
1.000
244.031
244.000

Executive Engineer (R&B),

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

R&B Section : Razole

R&B Sub-division : Razole

R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

-:oOo:-

Razole - Ponnamanada road from km 0/0 to 11/350


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
From km
58 / 250
to
From km
/
to
From km
13 / 675
to
5.675
Working K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
58 / 250
to
From km
/
to
From km
13 / 675
to
5.675
Working K.M.
c) Total lead

km
=
=

/ 000 to

11

350

0.000 + (0.000 -11.350)/2


5.675 K.M.

5.675 kms

=
156 / 595
31 / 735
/
8 / 700

of
of
of
of

60 / 200 of
156 / 595 of
31 / 735 of
/
of
8 / 700 of

NH 5
NH 5 to RP road
Kadali Irrigation channel road
S M road

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
Kadali Irrigation channel road
S M road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
From km
13 / 675
to
8 / 700 of S M road
5.675
Working K.M.
Total lead

11.350 kms

2.200 kms

=
=
=
=
=
=
Or say:

38.405
26.515
0.941
4.975
5.675
78.711

kms
kms
kms
kms
kms
kms
78.000 kms

0.000 kms

=
=
=
=
=
=
=
Or say:

4.600
26.605
26.515
0.941
4.975
5.675
69.311

=
=
=
=
=
=
=
Or say:

0.110###
kms
0.200###
kms
9.178 kms
0.941 kms
4.975 kms
5.675 kms
###
21.079 kms
###
21.000 kms

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
=
From km
/
to
/
of Visakhapatnam - Kathipudi
=
From km
/
to
/
of Kathipudi - Amalapuram road
=
From km
/
to
/
of A.B road upto Ambajipeta
=
From km
/
to
/
of A.G. road
=
From km
49 / 200
to
58 / 250 of Gannavaram to Chakalipalem road
=
From km
/
to
/
of Kadali Irrigation channel road
=
From km
13 / 675
to
8 / 700 of S M road
=
5.675
Working K.M.
=
c) Total lead
=
Or say:

kms
kms
kms
kms
kms
kms
kms
69.000 kms

1.600
120.600
96.300
7.270
6.595
9.050
0.941
4.975
5.675
253.006
253.000

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

Asst. Executive Engineer (R&B),


R&B Section : Razole

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from
km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to
7/4 for the year 20012-13.

-:oOo:-

Mulikipalli - Gogannamatam road from km 0/0 to 7/4


Reach proposed in the present estimate:
Centre KM of the Working Reach

A) For HBG metal:


a) Cart track length =
b) Metalled road length:
From km 195 / 000
to
From km
58 / 250
to
From km
/
to
From km
13 / 675
to
3.700
Working K.M.
c) Total lead

B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
From km 183 / 200
to
From km
58 / 250
to
From km
/
to
From km
13 / 675
to
3.700
Working K.M.
c) Total lead

=
=

156 / 595
31 / 735
/
6 / 600

km 0
/ 000 to 7
0.000 + (0.000 -11.350)/2
3.700 K.M.

of
of
of
of

60 / 200 of
156 / 595 of
31 / 735 of
/
of
6 / 600 of

400

NH 5
NH 5 to RP road
Kadali Irrigation channel road
S M road

Kakinada - Rajahmundry Road


NH 5
NH 5 to RP road
Kadali Irrigation channel road
S M road

C) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km
/
to
/
of Kadali Irrigation channel road
From km
13 / 675
to
6 / 600 of S M road
3.700
Working K.M.
Total lead

7.400 kms
3.700 kms

2.200 kms

=
=
=
=
=
=
Or say:

kms
kms
kms
kms
kms
kms
79.000 kms

0.000 kms

=
=
=
=
=
=
=
Or say:

4.600
26.605
26.515
0.941
7.075
3.700
69.436

=
=
=
=
=
=
=
Or say:

0.110###
kms
0.200###
kms
9.178 kms
0.941 kms
7.075 kms
3.700 kms
###
21.204 kms
###
21.000 kms

E) For Bitumen & Emulsion :


a) Lead from ex-factory a
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
=
From km
/
to
/
of Visakhapatnam - Kathipudi
=
From km
/
to
/
of Kathipudi - Amalapuram road
=
From km
/
to
/
of A.B road upto Ambajipeta
=
From km
/
to
/
of A.G. road
=
From km
49 / 200
to
58 / 250 of Gannavaram to Chakalipalem road
=
From km
/
to
/
of Kadali Irrigation channel road
=
From km
13 / 675
to
6 / 600 of S M road
=
3.700
Working K.M.
=
c) Total lead
=
Or say:

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

38.405
26.515
0.941
7.075
3.700
78.836

kms
kms
kms
kms
kms
kms
kms
69.000 kms

1.600
120.600
96.300
7.270
6.595
9.050
0.941
7.075
3.700
253.131
253.000

Executive Engineer (R&B),

kms
kms
kms
kms
kms
kms
kms
kms
kms
kms
kms

R&B Section : Razole

R&B Sub-division : Razole

R&B Division : Amalapuram

R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Sivakodu - Manepalli road from km 0/0 to 13/675
ConveyInitial rate
ance
less
Lead in
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

75

517.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

75

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Net rate
Segnior
(excludin
-age
g
charge
stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,129.10 Cum

526.50

491.30

70.00

--

50.00

1,137.80 Cum

75

517.80

821.30

70.00

205.33

50.00

1,664.43 Cum

"

75

517.80

836.30

70.00

209.08

50.00

1,683.18 Cum

"

"

75

517.80

681.30

70.00

170.33

50.00

1,489.43 Cum

HBG

"

"

75

517.80

551.30

70.00

137.83

50.00

1,326.93 Cum

7 9.50mm to 11.2mm IRC m/c metal for


patchwork
8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

75

526.50

551.30

70.00

137.83

50.00

1,335.63 Cum

HBG

"

"

75

517.80

421.30

70.00

105.33

50.00

1,164.43 Cum

9 2.36 to 5mm IRC m/c metal

HBG

"

"

75

517.80

225.30

70.00

56.33

50.00

919.43

Cum

7 HBG Stone chips 2.36mm and below

HBG

"

"

75

517.80

216.30

--

--

50.00

784.10

Cum

8 40 mm SS-5 metal

HBG

"

"

75

517.80

491.30

70.00

122.83

50.00

1,251.93 Cum

9 20 mm SS-5 metal

HBG

"

"

75

517.80

836.30

70.00

209.08

50.00

1,683.18 Cum

Kadium

65

423.50

50.50

--

--

22.00

496.00

Cum

17

190.50

169.50

--

--

40.00

400.00

Cum

--

--(ED 14.42%) (VAT 4%)

--

--

MT

33,060.00 4,767.25 1,513.09


(ED 14.42%) (VAT 4%)

--

10 Gravel
11 Sand (for Mortar)

Gravel

Source

Sand P. Gannavaram

12 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

249

747.00

13 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

249

747.00

Per
12

40,087.34 MT

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Rajavaram - Podalada road from km 59/6 to 61/425
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

69

487.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

katheru

69

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Net rate
Segnior
(excludin
-age
g
charge
stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,099.10 Cum

496.50

491.30

70.00

--

50.00

1,107.80 Cum

69

487.80

821.30

70.00

205.33

50.00

1,634.43 Cum

"

69

487.80

836.30

70.00

209.08

50.00

1,653.18 Cum

"

"

69

487.80

681.30

70.00

170.33

50.00

1,459.43 Cum

HBG

"

"

69

487.80

551.30

70.00

137.83

50.00

1,296.93 Cum

7 9.50mm to 11.2mm IRC m/c metal for


patchwork
8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

69

496.50

551.30

70.00

137.83

50.00

1,305.63 Cum

HBG

"

"

69

487.80

421.30

70.00

105.33

50.00

1,134.43 Cum

9 2.36 to 5mm IRC m/c metal

HBG

"

"

69

487.80

225.30

70.00

56.33

50.00

889.43

Cum

7 HBG Stone chips 2.36mm and below

HBG

"

"

69

487.80

216.30

--

--

50.00

754.10

Cum

8 40 mm SS-5 metal

HBG

"

"

69

487.80

491.30

70.00

122.83

50.00

1,221.93 Cum

9 20 mm SS-5 metal

HBG

"

"

69

487.80

836.30

70.00

209.08

50.00

1,653.18 Cum

Kadium

60

400.50

50.50

--

--

22.00

473.00

Cum

12

160.50

169.50

--

--

40.00

370.00

Cum

--

--(ED 14.42%) (VAT 4%)

--

--

MT

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

10 Gravel
11 Sand (for Mortar)

Gravel

Source

Sand P. Gannavaram

12 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

243

729.00

13 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

243

729.00

Per
12

47,992.15 MT

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Tatipaka - Tatipakamatam road from km 0/0 to 2/0
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

69

487.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

69

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Net rate
Segnior
(excludin
-age
g
charge
stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,099.10 Cum

496.50

491.30

70.00

--

50.00

1,107.80 Cum

69

487.80

821.30

70.00

205.33

50.00

1,634.43 Cum

"

69

487.80

836.30

70.00

209.08

50.00

1,653.18 Cum

"

"

69

487.80

681.30

70.00

170.33

50.00

1,459.43 Cum

HBG

"

"

69

487.80

551.30

70.00

137.83

50.00

1,296.93 Cum

7 9.50mm to 11.2mm IRC m/c metal for


patchwork
8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

69

496.50

551.30

70.00

137.83

50.00

1,305.63 Cum

HBG

"

"

69

487.80

421.30

70.00

105.33

50.00

1,134.43 Cum

9 2.36 to 5mm mm IRC m/c metal

HBG

"

"

69

487.80

225.30

70.00

56.33

50.00

889.43

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

69

487.80

216.30

--

--

50.00

754.10

Cum

11 40 mm SS-5 metal

HBG

"

"

69

487.80

491.30

70.00

122.83

50.00

1,221.93 Cum

12 20 mm SS-5 metal

HBG

"

"

69

487.80

836.30

70.00

209.08

50.00

1,653.18 Cum

Kadium

60

400.50

50.50

--

--

22.00

473.00

Cum

12

160.50

169.50

--

--

40.00

370.00

Cum

--

--(ED 14.42%) (VAT 4%)

--

--

MT

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

13 Gravel
14 Sand (for Mortar)

Gravel

Source

Sand P. Gannavaram

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

244

732.00

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

244

732.00

Per
12

47,995.15 MT

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Razole - Ponnamanda road from km 0/0 to 11/350
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

78

532.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

78

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Net rate
Segnior
(excludin
-age
g
charge
stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,144.10 Cum

541.50

491.30

70.00

--

50.00

1,152.80 Cum

78

532.80

821.30

70.00

205.33

50.00

1,679.43 Cum

"

78

532.80

836.30

70.00

209.08

50.00

1,698.18 Cum

"

"

78

532.80

681.30

70.00

170.33

50.00

1,504.43 Cum

HBG

"

"

78

532.80

551.30

70.00

137.83

50.00

1,341.93 Cum

7 9.50mm to 11.2mm IRC m/c metal for


patchwork
8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

78

541.50

551.30

70.00

137.83

50.00

1,350.63 Cum

HBG

"

"

78

532.80

421.30

70.00

105.33

50.00

1,179.43 Cum

9 2.36 mm 5mm IRC m/c metal

HBG

"

"

78

532.80

225.30

70.00

56.33

50.00

934.43

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

78

532.80

216.30

--

--

50.00

799.10

Cum

11 40 mm SS-5 metal

HBG

"

"

78

532.80

491.30

70.00

122.83

50.00

1,266.93 Cum

12 20 mm SS-5 metal

HBG

"

"

78

532.80

836.30

70.00

209.08

50.00

1,698.18 Cum

Kadium

69

441.90

50.50

--

--

22.00

514.40

Cum

21

213.50

169.50

--

--

40.00

423.00

Cum

--

--(ED 14.42%) (VAT 4%)

--

--

MT

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

13 Gravel
14 Sand (for Mortar)

Gravel

Source

Sand P. Gannavaram

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

253

759.00

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

253

759.00

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

Per
12

48,022.15 MT

R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
Mulikipalli - Gogannamatam road from km 0/0 to 7/4
ConveyInitial rate
ance
Lead in
less
(excl.
Km.
stacking
stacking
charges
)
5
6
7

Sl.
No

Name of the material

Nature
of the
material

1 40 mm to 45 mm IRC metal

HBG

katheru

79

537.80

2 40 mm to 45 mm IRC metal for patchwork

HBG

"

"

79

3 25 mm to 27 mm IRC m/c metal

HBG

"

"

4 19 mm to 22 mm IRC m/c metal

HBG

"

5 12 mm to 14 mm IRC m/c metal

HBG

6 9.50 mm to 11.2 mm IRC m/c metal

Net rate
Segnior
(excludin
-age
g
charge
stacking
s
charges)
10
11

Blasting
charges

25% for
M/C

491.30

70.00

--

50.00

1,149.10 Cum

546.50

491.30

70.00

--

50.00

1,157.80 Cum

79

537.80

821.30

70.00

205.33

50.00

1,684.43 Cum

"

79

537.80

836.30

70.00

209.08

50.00

1,703.18 Cum

"

"

79

537.80

681.30

70.00

170.33

50.00

1,509.43 Cum

HBG

"

"

79

537.80

551.30

70.00

137.83

50.00

1,346.93 Cum

7 9.50 mm to 11.2 mm IRC m/c metal for


patchwork
8 5.00 mm to 7.00 mm IRC m/c metal

HBG

"

"

79

546.50

551.30

70.00

137.83

50.00

1,355.63 Cum

HBG

"

"

79

537.80

421.30

70.00

105.33

50.00

1,184.43 Cum

9 2.36mm to 5mm mm IRC m/c metal

HBG

"

"

79

537.80

225.30

70.00

56.33

50.00

939.43

Cum

10 HBG Stone chips 2.36mm and below

HBG

"

"

79

537.80

216.30

--

--

50.00

804.10

Cum

11 40 mm SS-5 metal

HBG

"

"

79

537.80

491.30

70.00

122.83

50.00

1,271.93 Cum

12 20 mm SS-5 metal

HBG

"

"

79

537.80

836.30

70.00

209.08

50.00

1,703.18 Cum

Kadium

69

441.90

50.50

--

--

22.00

514.40

Cum

21

213.50

169.50

--

--

40.00

423.00

Cum

--

--(ED 14.42%) (VAT 4%)

--

0.00

MT

39,718.00 5,727.34 1,817.81


(ED 14.42%) (VAT 4%)

--

13 Gravel
14 Sand (for Mortar)

Gravel

Source

Sand P. Gannavaram

15 Bitumen Emulsion Medium setting (Bulk)

Visakhapatnam

253

--

16 Bitumen 80/100 Grade (Bulk)

Visakhapatnam

253

759.00

For Bulk Bitumen 80/100:- HPCL Price List With Effect From Dt.16.04.2012

Per
12

48,022.15 MT

Average R.M.R
Name of the work:

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam
road from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the
year 20012-13.
Rate

Sl.
No
.

Name of the road

40 mm
25 mm
40 mm
to 45
to 27
to 45
mm IRC
mm IRC
mm IRC metal for
m/c
metal patchwor
metal
k
3

19 mm
to 22
mm IRC
m/c
metal

9.50 mm
HBG
12 mm 9.50 mm to 11.2 5.00 mm
2.36 to
Stone
to 14
to 11.2 mm IRC to 7.00
5mm IRC
chips
mm IRC mm IRC
m/c
mm IRC
m/c
2.36mm
m/c
m/c
metal for
m/c
metal
and
metal
metal patchwor metal
below
k

40 mm
SS-5
metal

20 mm
SS-5
metal

Gravel

Sand

Bitumen
Emulsion

Bitumen
80/100
Grade

10

11

12

1 Sivakodu - Manepalli
road from km 0/0 to
13/675

1,129.10 1,137.80 1,664.43 1,683.18 1,489.43 1,326.93 1,335.63 1,164.43

919.43

784.10

1,251.93 1,683.18

496.00

400.00

--

40,087.34

2 Rajavaram - Podalada
road from km 59/6 to
61/425

1,099.10 1,107.80 1,634.43 1,653.18 1,459.43 1,296.93 1,305.63 1,134.43

889.43

754.10

1,221.93 1,653.18

473.00

370.00

--

47,992.15

3 Tatipaka Tatipakamatam road


from km 0/0 to 2/0

1,099.10 1,107.80 1,634.43 1,653.18 1,459.43 1,296.93 1,305.63 1,134.43

889.43

754.10

1,221.93 1,653.18

473.00

370.00

--

47,995.15

4 Razole - Ponnamanda
road from km 0/0 to
11/350

1,144.10 1,152.80 1,679.43 1,698.18 1,504.43 1,341.93 1,350.63 1,179.43

934.43

799.10

1,266.93 1,698.18

514.40

423.00

--

48,022.15

5 Mulikipalli Gogannamatam road


from km 0/0 to 7/4

1,149.10 1,157.80 1,684.43 1,703.18 1,509.43 1,346.93 1,355.63 1,184.43

939.43

804.10

1,271.93 1,703.18

514.40

423.00

--

48,022.15

Average Rate

###

###

###

###

###

###

###

###

914.43

779.10

###

###

494.16

397.20

--

###

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ Cum.

/ MT

/ MT

Asst. Executive Engineer (R&B),


R&B Section : Razole

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

DATAS FOR MAINTENANCE ITEMS


Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km
59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 2001213.
1 Providing B.T. patch work with 40-45 mm HBG metal using 80/100 Grade Bitumen at 42Kgs / 1Cum
including cost of materials and cost of Bitumen and labour charges for all operations such as trimming the
edges of the pot holes, cleaning the surface, applying tack coat with hot Bitumen, carrying and spreading
stone ballast by hand tamping with rammers, spreading Bitumen to the required consistency including
fuel charges for heating Bitumen and hire and all other incidental charges and operations charges of
Bitumen boiler, etc., complete for finished item of work.
(As per Memo No. Maintenance/EE(TEC) /TA.13/AE.4/2006, dt.18.03.2006.)
Materials
Bitumen 80/100 Grade
42 Kgs.
42 Kgs. 46,423.79 /1MT
40-45 mm HBG metal
1 Cum.
1 cum
1,132.80 /1Cum
Labour Charges
Mazdoor
2.86 Nos.
146.00 / each
Machinery
T&P Charges L.S.
say

1,949.80
1,132.80
417.56
40.00
3,540.16
3,540.00
/ 1 Cum.

2 Providing B.T. patch work with 9.50-11.20 mm HBG machine crushed chips using 80/100 Grade Bitumen
at 72Kgs / 1Cum including cost of materials and cost of Bitumen and labour charges for all operations
such as trimming the edges of the pot holes, cleaning the surface, applying tack coat with hot Bitumen,
carrying and spreading stone ballast by hand tamping with rammers, spreading Bitumen to the required
consistency including fuel charges for heating Bitumen and hire and all other incidental charges and
operations charges of Bitumen boiler, etc., complete for finished item of work.
(As per Memo No. Maintenance/EE(TEC) /TA.13/AE.4/2006, dt.18.03.2006.)
Materials
Bitumen 80/100 Grade
72 Kgs.
72 Kgs. 46,423.79 /1MT
9.50-11.20 mm HBG chips 1 Cum.
1 cum
1,330.63 /1 cum
Labour Charges
Mazdoor
2.86 Nos.
146.00 / each
Machinery
T&P Charges L.S.
say

3,342.51
1,330.63
417.56
40.00
5,130.70
5,131.00
/ 1 Cum.

3 Providing W.B.M. patch work with 40-45 mm HBG metal including cost of all materials like metal and
gravel, and labour charges for all operations such as picking the existing metalled surface 50mm to
100mm deep and spreading metal and blindage with gravel, watering and tamping, etc., complete for
finished item of work as directed by the Engineer-in-charge.
Materials
40-45 mm HBG metal
1 Cum.
1.00 cum
Gravel for blindage
1 Cum. / 4
0.25 cum
Labour Charges
Rate as per Item Sl. No.345, Pg.30 of Common SSR 2008-09
Rate per 0.50 Cum. (i.e., 10 x 1 x 0.50 = 0.50 Cum.) = Rs.28.00
Rate per 1 Cum. (28.00 x 2 = 56.00)

1,132.80 /1Cum
494.16 /1 cum

1,132.80
123.54

28.00 /10Sqm

say

56.00
1,312.34
1,312.00
/ 1 Cum.

4 Stripping the excess soil from the shoulder surface / Making up loss of material / irregularities on the
shoulder to the design level by adding fresh approved soil and compacting with appropriate equipment for
sectioning the berms / shoulders as per MORT&H Specification No. 3003
Rate as per Circular Memo. No:Maintenance/EE(TEC)/TA-15/AE4/2005, Dt:13-05-2005
3.00
/ 1 Sqm.
5 Clearing light Jungle / Scrub Jungle from berms of the road embankment

Rate as per S.S.R. 2008-2009 (SSR Sl. No.196, Pg.21)

2.00
/ 1 Sqm.

6 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps.
Rate as per S.S.R. 2008-2009 (SSR Sl. No.198, Pg.21)

3.30
/ 1 Sqm.

7 Earthwork excavation and depositing on banks with an initial lead of 10 mts. and initial lift of 2 mts. in
loamy and clayey soils like black cotton soils, red earth and ordinary gravel etc., complete for cutting high
berms and filling low berms.
Unit=Cum. Taking out put =
360.00
Cum.
37.50
1.00 cum
37.50 1 cum
Earth work excavation
22.00
1.00
cum
22.00
1
cum
Seigniorage charges
59.50
or say
59.50
/1 Cum.
8 Providing gravel irrespective of thickness in layers including cost of gravel, spreading, watering and rolling
with hand roller etc., complete.
Cost of Gravel
1.16 cum
494.16 / cum
573.23
Spreading gravel rate as per SSR (Sl. No.349, Pg.30)
1.00 cum
230.00 / 10cum
23.00
596.23
or say
596.00
/ 1 Cum.
9 Cost of Cement Mortars (1:8)
Cost of Sand for mortar
Cost of Cement
Labour for mixing cement mortar (S. No.184, Pg.20)

1.00 Cum
180.00 Kgs.
1.00 Cum

397.20 Cum.
5,400.00 MT
28.00 Cum.
say

397.20
972.00
28.00
1,397.20
1,397.00
/ 1Cum.

10 Brick Masonry in CM (1:8) using 2nd class bricks having a crushing strength of 35 kgs / sqm including
cost, conveyance and seigniorage of all materials, labour charges, etc., complete as per standard
specifications for finished item of work
Cost of Bricks (Sl. No.1 Pg.9 (Building items))
512.00 Nos.
3,128.50 / 1000
1,601.79
Cost of Cement Mortor (1:8)
0.20 Cum. 1,397.20 1 Cum.
279.44
Brick layer 1st class
0.42 Nos.
206.00 each
86.52
Brick layer 2nd class
0.98 Nos.
188.00 each
184.24
Man mazdoor
0.70 Nos.
146.00 each
102.20
Woman mazdoor
2.10 Nos.
146.00 each
306.60
2,560.79
say
2,561.00
/ 1Cum.
11 Cost of Cement Mortars (1:5)
Cost of Sand for mortar
Cost of Cement
Labour for mixing cement mortar (S. No.184, Pg.20)

1.00 Cum
288.00 Kgs.
1.00 Cum

397.20 Cum.
5,400.00 MT
28.00 Cum.
say

397.20
1,555.20
28.00
1,980.40
1,980.00
/ 1Cum.

12 Plastering 12mm thick in CM (1:5) including cost, conveyance and seigniorage charges of all materials
including labour charges, etc., complete as per standard specifications for finished item of work
Cost of Cement Mortor (1:5)
0.15 Cum. 1,980.40 Cum.
297.06
Brick layer 1st class
0.33 Nos.
206.00 each
67.98
Brick layer 2nd class
0.77 Nos.
188.00 each
144.76
Man mazdoor
0.50 Nos.
146.00 each
73.00
Woman mazdoor
1.10 Nos.
146.00 each
160.60
743.40
say
743.00

/ 10Sqm.

13 White washing single coat with best shell sime slaked and screened from approved source including cost
and conveyance of shell lime, gum, gangi water, pickley peace juce, etc., complete for finished item of
work as directed by the Engineer-in-Charge.
Cost of Shell lime
Gum, Gunji water & Prickly pier juice
I Class Painter
II Class Painter
Man Mazdoor
Woman Mazdoors.
Total Rate per 100 Sqm.

0.05 Cum.
0.33
0.77
0.30
1.90

Nos.
Nos.
Nos.
Nos.

780.00
L.S.
206.00
188.00
146.00
146.00

/ Cum.
/ each
/ each
/ each
/ each

39.00
2.00
67.98
144.76
43.80
277.40
574.94
57.00
/ 10 Sqm.

14 Providing Synthetic Enamel Paint Single coat including cost of Paint, conveyance to site and labour
charges for all operations viz., cleaning, washing, painting etc., complete for finished item of work
Synthetic enamel paint (SSR Item No.391) Pg.No.23
Painter 1st class
Painter 2nd class

0.70 Lit.
0.21 Nos.
0.49 Nos.

175.00 Lt.
206.00 each
188.00 each
say

122.50
43.26
92.12
257.88
258.00
/10Sqm.

15 Cost of Cement Concrete (1:5:10) using 40mm HBG metal (SS5)


Cost of 40mm size HBG metal (SS5)
Cost of Sand for Mortor
Const of Cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor

0.92
0.46
132.48
0.06
0.14
1.40
1.80

Cum.
Cum.
Kgs.
Nos.
Nos.
Nos.
Nos.

1,246.93
397.20
5,400.00
206.00
188.00
146.00
146.00

1Cum.
1Cum.
MT
each
each
each
each

1,147.18
182.71
715.39
12.36
26.32
204.40
262.80
2,551.16
/ 1Cum.

16 Tor / Mild Steel wrought and put up


Cost of steel as per SSR
1 M.T.
Fabrication charges including binding wire
1 M.T.
(S No.147, Pg.14 of Buildings SSR)

48,000.00 MT
9.00 1 Kg
say

48,000.00
9,000.00
57,000.00
57.00
/ 1 Kg.

17 Cost of Cement Concrete (1:2:4) using 20mm HBG chips (SS5)


Cost of 20mm size HBG chips (SS5)
Cost of Sand for Mortor
Const of Cement
Mason 1st class
Mason 2nd class
Man mazdoor
Woman mazdoor
Centering Charges

0.92
0.46
330.00
0.12
0.28
2.10
3.50
1.00

Cum.
Cum.
Kgs.
Nos.
Nos.
Nos.
Nos.

1,678.18
397.20
5,400.00
206.00
188.00
146.00
146.00
160.00

1Cum.
1Cum.
MT
each
each
each
each
1 cum

1,543.93
182.71
1,782.00
24.72
52.64
306.60
511.00
160.00
4,563.60
/ 1Cum.

18 Earth work excavation in Loamy and Clayey soils like black cotton soils, red earth and ordinary gravel for
foundations of KM Stones / HM Stones / Guard Stones
Cost as per SSR 20-B (Sl. No.240 Pg.24)
Add Seigniorage charges

1.00 Cum.
1.00 Cum.

37.50 1Cum.
22.00 1Cum.

37.50
22.00
59.50
/1Cum.

Unit

Description

20

Rate

Per

Amount

4563.60
57.00
59.50
2551.16

cum
kg
1cum
cum

219.05
213.01
6.01
216.85

Cost, supply and fixing of Guide stones of size 1.20M


x 0.20M x 0.20M using V.R.C.C (1:2:4) mix using 20mm
size SS 5 HBG MC chips and 3.737 kgs of Steel and its
fabrication charges and conveyance to different places
including digging pit of size 0.45 x 0.45m 0.50M & fixing
the stone in position with C.C. (1:5:10) mix with 40mm
size HBG metal in bottom 100MM thick and arranged
the stone & including cost and conveyance of all
materials to work site etc., complete.
0.048
3.737
0.101
0.085

cum
kgs
cum
cum

V.C.C. ( 1:2:4) For guide stone 1.20 x 0.20 x 0.20


Cost of steel
Earth work 0.45 x 0.45 x 0.50
C C ( 1:5:10)
Bottom = 0.45 x 0.45 x 0.100 = 0.020
Alround = 0.45x 0.45 x0.40 =
0.081
Deduct stone = 0.20x 0.20x 0.40 = -0.016
0.085 cum

Or say
21

654.92
654.92
655.00
Each

Cost and supply and fixing of 5th KM stone of size


1.52M x 0.52M x 0.25M using R.C.C. (1:2:4) mix using
20mm size HBG MC chips and 9.00 Kgs of steel & its
fabrication charges and conveyance to site at different
places where ever necessary including cost and
conveyance of all materials to work site etc., complete.
0.19760
9.00
0.203

cum V.C.C. ( 1:2:4) 5km stone (1.52 x 0.52 x 0.25 )


kgs Cost of steel
cum Earth work ( 0.75 x 0.45 x 0.60 )

4563.60
57.00
59.50

cum
kg
1cum

Or say
22

901.77
513.00
12.08
1426.85
1426.85
1427.00
each

Cost and supply and fixing of KM stone of size 1.10M x


0.37M x 0.25M using R.C.C. (1:2:4) mix using 20mm
size HBG MC chips and 5.50 Kgs of steel its fabrication
charges & conveyance to site at different places where
ever necessary including cost and conveyance of all
materials to work etc., complete.
0.102
5.50
0.122

cum V.C.C. 1:2:4 ( 1.10m x 0.37m x 0.25m )


kgs Cost of steel & fabrication
cum Earth work ( 0.60 x 0.45 x 0.45m )

4563.60
57.00
59.50

cum
kg
1cum

Or say
23

465.49
313.50
7.26
786.25
786.25
786.00
each

Cost and supply and fixing of HM stone of size 0.90M x


0.20M x 0.20M using R.C.C. (1:2:4) mix using 20mm
size HBG MC chips and 3.31 Kgs of steel its fabrication
charges & conveyance to site at different places where
ever necessary including cost and conveyance of all
materials to work site etc., complete.
0.036
3.310
0.064

cum V.C.C. 1:2:4 ( 0.90m x 0.20m x 0.20m )


kgs Cost of steel & fabrication
cum Earth work ( 0.40 x 0.40 x 0.40m )

4563.60
57.00
59.50

cum
kg
1cum

Or say

Asst. Executive Engineer (R&B),


R&B Section : Razole

164.29
188.67
3.81
356.77
356.77
357.00
each

Deputy Executive Engineer (R&B),


R&B Sub-division : Razole

Executive Engineer (R&B),


R&B Division : Amalapuram

### Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem
specification including cost,seignorage of all materials and including premixing the material with water at OMC
in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in
base courses on well prepared surface and compacting with Power road roller to acheive the desired density
etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (4 th revision) for finished
item of work. (Payment based on levels for finished item of work)
Unit = cum
Page 110,111 of MoRT&H SDB
Taking output = 225 cum
(A) Labour
0.48 nos. Mate
2.00 nos. Mazdoor skilled
10.00 nos. Mazdoor
Total
(B) Machinery
6.60 hr
Wet mix plant of 60 tonne hr. capacity
6.00 hr
Electric generating set 125 KVA
6.00 hr
front end loader 1 cum capacity
6.00 hr
Mechanical Paver finisher 100 TPH
3.90 hr
Power road roller 8-10 T
3.00 hr
Water tanker
Total
(C) Material
89.10 cum 45 to 22.40mm IRC&MoRT&H HBG M/C metal@ 30%
(Av. Of 40-45, 25-27, 19-22mm )
118.80 cum 22.4 to 2.36mm IRC&MoRT&H HBG M/C metal@40%
(Av. Of 19-22mm, 12-14mm, 9.5-11.2mm, 5-7mm,
2.36 - 5mm )
89.10 cum 2.36mm to 75 micron @ 30% (2.36mm & below)
Total
(D) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)+( C)
6.00 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
Rate per 1 cum
Rate to be adopted per 1 cum

188.00
193.40
146.00

day
day
day

90.24
386.80
1460.00
1937.04

1320.00
1090.00
0.00
0.00
540.00
345.00

hr
hr
hr
hr
hr
hr

8712.00
6540.00
0.00
0.00
2106.00
1035.00
18393.00

1487.24

cum

132512.79

1311.68

cum

155827.58

779.10

cum

69417.81
357758.18
0.00
378088.22
0.00
378088.22
1680.39
1680.00
Cum

DATAS
Name of Work ::- Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b)
Rajavaram - Podalada road from km 59/6 to 61/425 c) Tatipaka Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road
from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0
to 7/4 for the year 20012-13.

Quantity

Description of Item

Rate

per

1 Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 600mm/800mm/1000mm dia. R.C.C Hume pipes in position including lifting, aligning,
lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and
2906 (4th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-inCharge for finished item of work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
600 mm Dia.,
(A)
0.14
0.50
3.00

Labour
nos
nos
nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 600mm Dia., pipes
Total
(C) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)
6.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

188.00
206.00
146.00

day
day
day

1859.00

RM

188.00
206.00
146.00

nos.
nos.
nos.

3051.00

RM

800 mm Dia.,
(A)
0.18
0.50
4.00

Labour
nos
nos
nos

Mate
Mason
Mazdoor
Total

(B) Material
12.50 RM
Cost of 800mm Dia., pipes
Total
(C) Over head charges @ 6% (10%-VAT)
Add for Over head charges @ 6% on (A)+(B)
6.00 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted

0 to 13/675 (b)
425 c) Tatipaka ole - Ponnamanda road
matam road from km 0/0

Amount

m Dia., NP-3 class for pipe


Labour charges for laying,
n including lifting, aligning,
cification 2900, 2905 and
ected by the Engineer-in-

26.32
103.00
438.00
567.32
23237.50
23237.50
0.00
23804.82
0.00
23804.82
1904.39
1904.00
1 RM

33.84
103.00
584.00
720.84
38137.50
38137.50
0.00
38858.34
0.00
38858.34
3108.67
3109.00

1 RM

Name of the work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km 59/6 to 61/425 c) Tatipaka Tatipakamatam road from km 0/0 to 2/0 (d) Razole - Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km
0/0 to 7/4 for the year 20012-13.

Cum

Cum

1 Sivakodu - Manepalli
road from km 0/0 to
13/675

33

21

2 Rajavaram - Podalada
road from km 59/6 to
61/425

--

3 Tatipaka Tatipakamatam road


from km 0/0 to 2/0

KM, HM &
Guard Stones
KM HM Guard

with
primer

300
MM

600
MM

RM

RM

Sqm

Sqm

Cum

Cum

Cum

Cum

24

300

--

3,000

24

--

10

16

--

80

300

550

--

--

--

--

--

--

1,000

--

--

--

--

--

--

--

--

--

50

100

--

--

--

100

--

400

--

--

--

--

--

--

--

40

150

85

--

--

4 Razole - Ponnamanda
road from km 0/0 to
11/350

24

21

12

800

--

500

15

--

--

--

45

300

330

--

--

5 Mulikipalli Gogannamatam road


from km 0/0 to 7/4

--

300

--

100

--

--

--

--

--

--

40

--

460

--

--

72

51

36

1,500

5,000

10

45

20

20

210

800 1,525

0.00

0.00

Cum

Cum

Cum

Sqm

Sqm

Sqm

Cum

Cum

Cum

Cum

Sqm

Sqm

Sqm

RM

RM

Sqm Nos. Nos. Nos.

Sqm

with
out
primer
Sqm Sqm

Pipe Culverts

Sqm

Total

Sqm Nos. Nos. Nos.

Synthetic
Enamel paint

Painting Letters

Brick work for


Earth Gravel culverts using
work
filling
for high low
Scrub berms berms II Class Fly Ash
Juliflora
jungle
Bricks Bricks

White washing

40 mm 9.50-11.2
HBG
mm HBG

Jungle
clearance

Plastering for
culverts

Name of the road

Sectioning of
Berms

Sl.
No.

BT Patch work with


Bitumen/Emulsion

Wetmix
macadam

Details of Maintanance Items

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

Executive Engineer (R&B),

R&B Section : Razole

R&B Sub-division : Razole

R&B Division : Amalapuram

Nos

KM wise Requirement of Patchwork quantities under Maintenance work


Name of work :

Mtc of (a) Sivakodu - Manepalli road from km 0/0 to 13/675 (b) Rajavaram - Podalada road from km 59/6 to 61/425 c) Tatipaka - Tatipakamatam road from km 0/0 to
2/0 (d) Razole - Ponnamanda road from km 0/0 to 11/350 (e) Mulikipalli - Gogannamatam road from km 0/0 to 7/4 for the year 20012-13.
SM road

Tatipaka Tatipakamatam Road

RP Road

B.T.
B.T.
Patch
Sl.
Patch
work
No.
work
with
WMM
with
9.50 40MM
11.20M
HBG
M HBG

B.T.
B.T.
Sl.
Patch
Patch
No
work
work
with
WMM .
with
9.50 40MM
11.20M
HBG
M HBG

Razole - Ponnamanda
Road

B.T.
B.T.
Patch
Sl.
Patch
work
No.
work
with
WMM
with
9.50 40MM
11.20M
HBG
M HBG

Mulikipalli Gogannamatam road

B.T.
B.T.
Sl.
Patch
Patch
No
work
work
with
WMM .
with
9.50 40MM
11.20M
HBG
M HBG

B.T.
B.T.
Patch
Patch
work
work
with
WMM
with
9.50 40MM
11.20M
HBG
M HBG

Sl.
No.

KM

km 1

3.00

3.00

--

1 KM 58

--

--

--

KM 1

3.00

2.00

--

KM 1

3.00

2.00

--

KM 1

3.00

1.00

--

km 2

3.00

3.00

3.00

2 KM 59

--

--

--

KM 2

3.00

1.00

--

KM 2

3.00

2.00

--

KM 2

3.00

2.00

--

km 3

--

2.00

--

3 KM 60

--

--

--

KM 3

1.00

2.00

--

KM 3

1.00

1.00

--

km 4

--

1.00

--

KM 4

1.00

2.00

--

KM 4

--

--

--

km 5

--

1.00

--

KM 5

1.00

2.00

--

KM 5

--

--

--

km 6

--

--

--

KM 6

2.00

2.00

--

KM 6

1.00

1.00

--

km 7

--

--

--

KM 7

2.00

2.00

--

KM 7

1.00

1.00

km 8

--

--

--

KM 8

3.00

2.00

3.00

KM 8

km 9

--

--

--

KM 9

3.00

2.00

3.00

10

km 10

12.00

3.00

--

10 KM 10

3.00

2.00

3.00

9.00

6.00

KM

KM

KM

11

km 11

9.00

3.00

9.00

11 KM 11

2.00

1.00

3.00

12

km 12

3.00

3.00

9.00

12 KM 12

--

--

--

13

km 13

3.00

1.00

3.00

14

km 14

--

1.00

--

TOTAL

33.00

21.00

24.00

24.00

21.00

12.00

KM

15
16
17
18
19
20
21

Asst. Executive Engineer (R&B),

0.00

0.00

0.00

Deputy Executive Engineer (R&B),

6.00

3.00

0.00

Executive Engineer (R&B),

0.00

R&B Section : Razole

R&B Sub-division : Razole

R&B Division : Amalapuram

DATA FOR

GUARD STONES

1) Supplying and fixing of Guard Stones (as per approved drawings) with RCC (1:2:4) mix using 20mm
(SS.5) size HBG machine crushed chips for precast stones and fixing in foundation concrete (1:4:8)
mix using 40mm (SS.5) size HBG metal and including all labour charges for earth work excavation,
laying foundation concrete and fixing in position and prepare the pedastals as per drawings including
cost, seigniorage and conveyance of all materials and painting with Synthetic enamel paint two coats
over a primery coat of cement primer, labour charges for all operations such as curing etc., complete
for finished item of work as directed by the departmental officers incharge of the work.

Sl.
No.
1

L
4

Measurements
B
5

D
6

1x1

0.45

0.45

0.60

0.122
cum.

1x1

0.45

0.45

0.60

0.122

1x1

0.200

0.150

0.600

-0.018
0.104
cum.

24.72
/1cum

0.041
cum.

#REF!
/1cum

2.870
Kg.

37.50
/ 1Kg.

0.600
0.030
0.630
Sqm.

#REF!
/ 10 Sqm.

No
.
3

1 Earth work excavation

2 Cement concrete (1:4:8)

Item
2

Deductions

3 RCC (1:2:4) using 20mm HBG 1x1


metal (SS5)
4 HYSD Steel Wrought and
putup

1.35

0.200

0.150

0.041 x 70 Kgs. / Cum

Content
Rate / per
s
7
8
48,000.00
/10 cum

5 Painting two coats with


Synthetic enamel paint over
primer coat (total three coats)
Sides
Top

1
1

0.80
0.20

0.75
0.15

---

6 Add extra for Form work for the precast concrete block and
preparation of pedestals alround, conveyance, fixing at the site, etc.,

L.S.

4) mix using 20mm


on concrete (1:4:8)
h work excavation,
drawings including
mel paint two coats
ring etc., complete
k.

Amount
9
585.60

2.57

#REF!

107.63

#REF!

1.18

#REF!
/ each

DATA FOR

HM STONES

1) Supplying and fixing of HM Stones (as per approved drawings) with RCC (1:2:4) mix using 20mm
(SS.5) size HBG machine crushed chips for precast stones and fixing in foundation concrete (1:4:8)
mix using 40mm (SS.5) size HBG metal and including all labour charges for earth work excavation,
laying foundation concrete and fixing in position and prepare the pedastals as per drawings and
plastering with C.M. (1:3) 12mm thick and fixing with R.C.C. Collars plain bended confirming to I.S.
458 / 1988 including cost, seigniorage and conveyance of all materials and labour charges for all
operations such as curing etc., complete for finished item of work as directed by the departmental
officers incharge of the work.

Sl.
No.
1

Item
2

No
.
3

L
4

Measurements
B
5

D
6

Content
Rate / per
s
7
8

1 Earth work excavation

1x1

TT / 4 x 0.35 x 0.35 x 0.40

0.039
cum.

2 Cement concrete (1:4:8)

1x1

TT /4 x 0.35 x 0.35 x 0.40

0.039

Deductions

3 Steel reinforcement
6mm dia vertical
6mm dia stirrups

1x2

0.150

0.100

0.300

1.90 = 2.80 @ 0.222 Kgs / 1 m

1x5 x 0.375 = 1.875 @ 0.222 Kgs/1m

4 RCC (1:2:4) using 20mm HBG 1


metal (SS5)

Amount
9

48,000.00
/10 cum

187.20

24.72
/1cum

0.84

0.416
1.038
Kg.

37.50
/ 1Kg.

38.93

#REF!
/1cum

#REF!

160.60
/10 sqm

7.40

-0.005
0.034
cum.

0.622

0.20

0.150

0.750

0.023
cum.

0.500

0.350

--

0.175

1 x TT x 0.35 x 0.20

--

0.220

1 x TT/4 x 0.352

--

0.096

--

-0.03

5 Plastering in CM (1:3) 12mm


thick
1x1
Pedestal

Deduct HM stone portion

0.20

0.150

0.461
sqm.
6 Provision for 350mm dia RCC collars rate as per S.S.R.

each

97.00

7 Add extra for Form work for the precast concrete block and
preparation of pedestals alround, conveyance, fixing at the site, etc.,

L.S.

1.11

#REF!
/ each

DATA FOR

KM STONES

1) Supplying and fixing of KM Stones (as per approved drawings) with RCC (1:2:4) mix using 20mm
(SS.5) size HBG machine crushed chips for precast stones and fixing in foundation concrete (1:4:8)
mix using 40mm (SS.5) size HBG metal and including all labour charges for earth work excavation,
laying foundation concrete and fixing in position and prepare the pedastals as per drawings and
plastering with C.M. (1:3) 12mm thick and fixing with R.C.C. Collars plain bended confirming to I.S.
458 / 1988 including cost, seigniorage and conveyance of all materials and labour charges for all
operations such as curing etc., complete for finished item of work as directed by the departmental
officers incharge of the work.
Sl.
No.
1

Item
2

No
.
3

L
4

Measurements
B
5

D
6

Content
Rate / per
s
7
8

1 Earth work excavation

1x1

TT / 4 x 0.60 x 0.60 x 0.60

0.170
cum.

2 Cement concrete (1:4:8)

1x1

TT /4 x 0.60 x 0.60 x 0.70

0.198

Deductions

3 Steel reinforcement
8mm dia vertical
6mm dia stirrups

1x2

0.350

0.250

0.550

2.50 = 5.00 @ 0.39 Kgs / 1 m

1x7 x 1.075 = 7.525 @ 0.222 Kgs/1m

-0.048
0.150
cum.

Amount
9

48,000.00
/10 cum

816.00

24.72
/1cum

3.71

37.50
/ 1Kg.

135.79

#REF!
/1cum

#REF!

160.60
/10 sqm

27.78

1.950
1.671
3.621
Kg.

4 RCC (1:2:4) using 20mm


HBG metal (SS5)

ler portion
Semicircular

ler portion

0.935

0.350

0.250

1/2 x TT/4 x 0.35 x 0.35 x 0.25

0.082
0.012
0.094
cum.

5 Plastering in CM (1:3) 12mm


thick

ler portion
ler portion top

1xTT/2 x 0.350

For semicircular faces


Pedestal
top
Deduct KM stone portion

1.200

--

0.924

0.250

--

0.138

2 x TT/4 x 0.352 x 1/2

--

0.096

2 x TT x 0.60 x 0.20

--

0.377

1 x TT x 0.60 x 0.60/4

--

0.283

--

-0.088

0.385

0.35

0.25

1.730
sqm.
6 Provision for RCC collars 600mm dia rate as per SSR

each

255.00

7 Add extra for Form work for the precast concrete block and
preparation of pedestals alround, conveyance, fixing at the site, etc.,

L.S.

0.68

#REF!
/ each

You might also like