GS.R 354(E).-In exerciseof the powers confared by Sections 6 and 25 of the Environmtxlt {Protection)Act, 1986
(29of 1986),the CentralGovemmmthereby makes the following rules Meito m a dthe En-eru
(Protdon) Mes,
1986,m d y :1. (1)

(2)

These rules may becalled the Environment (Protection) (Third Amendment) Rules, 2011.
They shrU come into force on the date of their publication inthe Offiud Gazette.

2 In the Environment (F'rotection] Rules, 1986,C

(i)

in Scherfule I, fir serial number21 rclahg to "Copper, Lead and Zinc Smelting", the following s

number and entries shall respectively be sub&tuted, namely :Sl. No. Indusry
'21

Coppff,M

or Zinc
Smelting Plant

Standard

-P

Emission standards
a. Concentrator
Existing Unit
Partidate
100
Matter (mg/Nm3)

New Unit

b. Sulphur Dioxide Recovery Unit


Limiting Concentrationin mg'Nm3

SulphurDioxidc(SoJ
Acid MistISdphur

%oxide

Plant capacity for I 00 %


convdble concmtrat~onof
SulphuncAcid ( m d d a y )
Upto 300
A h v e 3DO
Upto 300
Above 300

Existing
Unit
1370
1250
9

70

New
Unit
1250
950

70
50

Note :

1. Capacity in above stipulation means Ihe installed capacity of SulphuricAcid Plant.


2. Scnrhbing units shall have on-line pH meters with auto recording facility.
3. Plant commissioned on or after thc date of notLfication, shall be t m e d as 'New Unit'.

4. Theheight of the Stack emittingSulplmDioxideoracid mist sball he aminimumof 30 metres or


as per the fonrmZa H = 14 (Q) 0.3 (whichever is more),where "H"is the height of stack in m m ;
and "Q" is the maximum quantityof SO,in kgthr, expected to he emitted through the stack at
1 10 per cent rated capacity of the Tail Gas plant (s) and calculatd as per the norms of gaseous

erzlissim.
5. Tail Gas plants having more than onc stream or unit o f sdphuric acid at one location, the
combined capacity of a l l the streams or units shall be taken. into conddwdtion for determining

the stack height and applicability of emission standards.

6. Tail Gas plants having separate stack for gaseous mission for the scrubbi~gunit, the height of
this stack sball be equal to main stack or 30 metres, whichever is higher.";
(n)

in Schedule VI,in part-D, in paragraph III relating to LoadMass Based Standards,for senid n m b a 2 relating
to Copper, Lead and Zinc SmelterlConvestorPlant, for the eatrim, the fouowing enbies Wl resp&eIy be
substituted, namely -

PJm+.TBeprinc&alndrn

waepubtishdinthe&tze#eofIndiavidem S.O. 84@), b


R
t d 1 % h N o v e ,1986;
~ ' ~ c amendedvideGS.R
d y
9 7 0 , datedtbe
f.8aFebraarynmGSk R.49(E),&~dthc4hMd,2009;GS.R512@), dabedthe9thJdy,2009;GSR5BJIE),
dated themhdy, 2009;G5.R 5 9 5 0 , Mthe2lstArqeast2009; G S.R 7340, d a t e d t h e 4 t h N o ~n#)9,
~~
Q3.R 8WIjWc3dthe 16thMmmh 2009;GS.R. 1 0 ,dated the lit Jamaary, ZO1Q; GSX.Bl(ES, d & d 5th
FieBnrary,2010; ES.R48S@Cdatad9UrJlmr;B10;GSR 608~,dmd221st~,201@
GS.R 7390, dad tbe9th
~qembm
2010;
~ W.R 8090, ~ZIM,
~ t h ~ ~ t o b a , zGSR
o ~ o ;me),
dadedabe I S ~ ~ M & ,2011, ma GS.R
22l(q,wfhe 18th2011.
R1k8quWd v h 3 e S . O . 433@) dated 18tbApail1987;d