Test Record

Disconnect Switch
Field Test Report

TEST PERFORMED:
INSULATION RESISTANCE TEST (2.5kV DC for 1min.)
CONTACT RESISTANCE TEST
INSULATION POWER FACTOR TEST
HIGH POTENTIAL TEST
INSULATION RESISTANCE OF MOTOR OPERATION &
AUXILIARY DEVICE CONTROL WIRING
CHECKING & FUNCTIONAL TEST

Customer
NGCP - Cruz-Na-Daan Substation
Supplier
COELME

Project
100MVA,230/69-13.8kV TESTING & COMMISSIONING
Site
Cruz-Na-Daan, San Rafael, Bulacan

Test Record

Sheet
2/4

Description

Cont
3

DISCONNECT SWITCH TEST REPORT

1.0 General Data and Information:

2.0 Visual Inspection

3.0 Electrical Routine Tests


3.1 Insulation Resistance Test: (with 2500V; 200,000M
PHASE

Test Point

A
B
C

Line - Ground
Line - Ground
Line - Ground

Range)

Reading in Giga-Ohms
@1Min.

Remarks
Okay
Okay
Okay

3.2 Contact Resistance Test:


Resistance

PHASE

Test Point

A
B
C

End to End Copper Stud


End to End Copper Stud
End to End Copper Stud

0.877m
0.805m
0.778m

Customer
NGCP - Cruz-Na-Daan Substation
Supplier
COELME
Done by:

Approved by:

Engr. Michael P. Gregas

Engr. Jimwel C. Capillo

Impressed
Current

Remarks

10.0A
10.0A
10.0A

Okay
Okay
Okay

Project
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
Site
Cruz-Na-Daan, San Rafael, Bulacan
Dept.:
Testing
Service

Date:
03/28/12

Customer Witness:

Dept.:

Date:

Test Record

Sheet
3/4

Description

Cont
4

DISCONNECT SWITCH TEST REPORT

3.3 Insulation Power Factor Test:


TEST
TEST
Specimen Dissipation
PHASE
Capacitance
Power
MODE VOLTAGE Current
53.65pF
242.5 A 42.21mW
A
12kV
GST
52.96pF
240.1 A 51.93mW
B
12kV
GST
54.26pF
246.3 A 50.44mW
12kV
C
GST
TEST VOLTAGE

10kV

20kV

30kV

40kV

50kV

60kV

LEAKAGE
CURRENT

TEST POINT

0.0
0.0
0.0
0.0
0.0
0.0
0.1
0.1
0.1
0.3
0.3
0.3
0.5
0.5
0.5
1.2
1.0
0.9

A-Gnd
B-Gnd
C-Gnd
A-Gnd
B-Gnd
C-Gnd
A-Gnd
B-Gnd
C-Gnd
A-Gnd
B-Gnd
C-Gnd
A-Gnd
B-Gnd
C-Gnd
A-Gnd
B-Gnd
C-Gnd

Customer
NGCP - Cruz-Na-Daan Substation
Supplier
COELME
Done by:

Approved by:

Engr. Michael P. Gregas

Engr. Jimwel C. Capillo

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

%PF
1.450%
1.801%
1.706%

REMARKS
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay
Okay

Project
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
Site
Cruz-Na-Daan, San Rafael, Bulacan
Dept.:
Testing
Service

Date:
05/16/12

Customer Witness:

Dept.:

Date:

Test Record

Sheet
4/4

Description

Cont
--

DISCONNECT SWITCH TEST REPORT

4.0 Operating Mechanism Electrical Routine Test:


4.1 Motor Insulation Resistance Test: (with 1000V; 1000M

Range)

Reading in Giga-Ohms

Test Point

@1Min.

Remarks
Okay
Okay
Okay

Line 1 - Ground
Line 2 - Ground
Line 3 - Ground

4.2 Motor Winding Resistance Test:


Test Point

Resistance

Line 1 - Neutral
Line 2 - Neutral
Line 3 - Neutral
Line 1 - Line 2
Line 2 - Line 3
Line 3 - Line 1

15.02
15.03
14.87
30.05
29.89
29.88

Impressed
Current

Remarks

10mA
10mA
10mA
10mA
10mA
10mA

Okay
Okay
Okay
Okay
Okay
Okay

4.3 Anticondensate Resistance 230Vac/60Hz(10W):


4.3.1 Winding Resistance: 257.2
4.3.2 Insulation Resistance:150M @1kV
4.4 Anticondensate Resistance 230Vac/60Hz(10W):
4.4.1 Winding Resistance: 132.9
4.4.2 Insulation Resistance: 247M @1kV

Remarks:

5.0 CHECKING & FUNCTIONAL TEST:


5.1 Operating Torque
5.2 Close / Open Operation:
5.2.1 Hand/Manual Operation
5.2.2 Motor Operation
5.3 Switch Position Indicator:
5.3.1 Close Position Switch
5.3.2 Open Position Switch
5.3.3 End Position Switch
5.4 Mechanical Interlocking
5.5 Electrical Interlocking

Customer
NGCP - Cruz-Na-Daan Substation
Supplier
COELME
Done by:

Approved by:

Engr. Michael P. Gregas

Engr. Jimwel C. Capillo

Project
100MVA, 230/69-13.8kV TESTING & COMMISSIONING
Site
Cruz-Na-Daan, San Rafael, Bulacan
Dept.:
Testing
Service

Date:
04/24/12

Customer Witness:

Dept.:

Date: