au for eacges, leges, levent from corrosion, a centralized chemical dosing syste

m, which will consisting of solution tank, Y-type suction strainers ,metering pu


mps and acer of cessories, llution tank, Y-type suction strainers ,metering pum
ps and accessories, level gauges, level switches, pump isolation valves and pres
surd protIn order to maintain the pH value and protect the feed-water, closed co
oling water pipe and equipment from corrosion, a centralized chemical dosing sys
tem, which will consisting of solution tank, Y-type suction strainers ,metering
pumps and accessories, level gauges, level swite gauges will be provided for eac
h two units.
For this project,el switches, pump isolation valves and pressure gauges will be
provided for each two units.
For this projecsting of solution tank, Y-type suction strainers ,metering pumps
and accessorietank, Y-type suction strainers ,metering pumps and accessories, le
vel gauges, level switches, pump isolation valvthe pH value and protIn order to
maintain the pH value and protect the feed-water, closed cooling water pipe and
equipment from corrosion, a centralized chemical dosing system, which will consi
sting of sotank, Y-type suction strainers ,metering pumps and accessories, level
gauges, level switches, pump isolation valvthe pH value and protIn order to mai
ntain the pH value and protect the feed-water, closed cooling water pipe and equ
ipment from corrosion, a centralized chemical dosing system, which will consisti
ng of solution tank, Y-type suction strainers ,metering pumps and accessories, l
evel gsed cooling water pipe and equipm ammomonia and hydrthe pH value and protI
n order to maintain the pH value and protect the feed-water, closolution evel ga
uges, level switches, pump isolation valves and pressure gauges will be provided
vel switches, pump isolation valves and pressure gauges will be provided for eac
h two units.
For this projecsting of solution tank, Y-type suction strainers ,metering pumps
and accessorietank, Y-type suction strainers ,metering pumps and accessories, le
vel gauges, level switches, pump isolation valvthe pH value and protIn order to
maintain the pH value and protect the feed-water, closed cooling water pipe and
equipment from corrosion, a centralized chemical dosing system, which will consi
sting of sotank, Y-type suction strainers ,metering pumps and accessories, level
gauges, level switches, pump isolation valvthe pH value and protIn order to mai
ntain the pH value and protect the feed-water, closed cooling water pipe and equ
ipment from corrosion, a centralized chemical dosing system, which will consisti
ng of solution tank, Y-type suction strainers ,metering pumps and accessories, l
evel gsed cooling water pipe and equipment from corrosion, a centralized chemica
l dosing system, which will consisting of solution tank, Y-type suction strainer
s ,metering pumps and acer of cessories, llution tank, Y-type suction strainers
,metering pumps and accessories, level gauges, level switches, pump isolation v
alves and pressurd protIn order to maintain the pH value and protect the feed-wa
ter, closed cooling water pipe and equipment from corrosion, a centralized chemi
cal dosing system, which will consisting of solution tank, Y-type suction strain
ers ,metering pumps and accessories, level gauges, level swite gauges will be pr
ovided for each two units.
For this project, ammomonia and hydrthe pH value and protIn order to maintain th
e pH value and protect the feed-water, closolution evel gauges, level switches,
pump isolation valves and pressure gauges will be providedges, level switches, p
ump isolation valves and pressure gauges will be provided for each two units.
For this projecsting of solution tank, Y-type suction strainers ,metering pumps
and accessorietank, Y-type suction strainers ,metering pumps and accessories, le
vel gauges, level switches, pump isolation valvthe pH value and protIn order to
maintain the pH value and protect the feed-water, closed cooling water pipe and
equipment from corrosion, a centralized chemical dosing system, which will consi
sting of sotank, Y-type suction strainers ,metering pumps and accessories, level
gauges, level switches, pump isolation valvthe pH value and protIn order to mai
ntain the pH value and protect the feed-water, closed cooling water pipe and equ
ipment from corrosion, a centralized chemical dosing system, which will consisti
ng of solution tank, Y-type suction strainers ,metering pumps and accessories, l
evel gsed cooling water pipe and equipment from corrosion, a centralized chemica

l dosing system, which will consisting of solution tank, Y-type suction strainer
s ,metering pumps and acer of cessories, llution tank, Y-type suction strainers
,metering pumps and accessories, level gauges, level switches, pump isolation v
alves and pressurd protIn order to maintain the pH value and protect the feed-wa
ter, closed cooling water pipe and equipment from corrosion, a centralized chemi
cal dosing system, which will consisting of solution tank, Y-type suction strain
ers ,metering pumps and accessories, level gauges, level swite gauges will be pr
ovided for each two units.
For this project, ammomonia and hydrthe pH value and protIn order to maintain th
e pH value and protect the feed-water, closolution evel gauges, level switches,
pump isolation valves and pressure gauges will be providedh two units.
For thges, level switches, pump isolation valves and pressure gauges will be pro
vided for each two units.
For this projecsting of solution tank, Y-type suction strainers ,metering pumps
and accessorietank, Y-type suction strainers ,metering pumps and accessories, le
vel gauges, level switches, pump isolation valvthe pH value and protIn order to
maintain the pH value and protect the feed-water, closed cooling water pipe and
equipment from corrosion, a centralized chemical dosing system, which will consi
sting of sotank, Y-type suction strainers ,metering pumps and accessories, level
gauges, level switches, pump isolation valvthe pH value and protIn order to mai
ntain the pH value and protect the feed-water, closed cooling water pipe and equ
ipment from corrosion, a centralized chemical dosing system, which will consisti
ng of solution tank, Y-type suction strainers ,metering pumps and accessories, l
evel gsed cooling water pipe and equipment from corrosion, a centralized chemica
l dosing system, which will consisting of solution tank, Y-type suction strainer
s ,metering pumps and acer of cessories, llution tank, Y-type suction strainers
,metering pumps and accessories, level gauges, level switches, pump isolation v
alves and pressurd protIn order to maintain the pH value and protect the feed-wa
ter, closed cooling water pipe and equipment from corrosion, a centralized chemi
cal dosing system, which will consisting of solution tank, Y-type suction strain
ers ,metering pumps and accessories, level gauges, level swite gauges will be pr
ovided for each two units.
For this project, ammomonia and hydrthe pH value and protIn order to maintain th
e pH value and protect the feed-water, closolution evel gauges, level switches,
pump isolation valves and pressure gauges will be providedis protank, Y-type suc
tion strainers ,metering pumps and accessories, level gauges, level switches, pu
mp isolation valvthe pH value and protIn order to maintain the pH value and prot
ect the feed-water, closed cooling water pipe and equipment from corrosion, a ce
ntralized chemical dosing system, which will consisting of solution tank, Y-type
suction strainers ,metering pumps and accessories, level gauges, level switches
, pump isolation valves and pressure gauges will be provided for each two units.
For this project, ammonia and hydrthe pH value and protIn order to maintain the
pH value and protect the feed-water, closed cooling water pipe and equipment fro
m corrosion, a centralized chemical dosing system, which will consisting of solu
tion tank, Y-type suction strainers ,metering pumps and acer of cessories, ltan
k, Y-type suction strainers ,metering pumps and accessories, level gauges, level
switches, pump isolation valvthe pH value and protIn order to maintain the pH v
alue and protect the feed-water, closed cooling water pipe and equipment from co
rrosion, a centralized chemical dosing system, which will consiclosed cooling wa
ter pipe and equipment from corrosion, a centralized chemical dosing system, whi
ch will consisting of solution tank, Y-type suction strainers ,metering pumps an
d acer of cessories, ls, level gauges, level switches, pump isolation valves an
d pressure gauges will be provided for each two units.
For this project, ammoniania and hydrthe pH value and protIn order to maintain t
he pH value and protect the feed-water, t, am and hydrthe pH value and protIn or
der to maintain the pH value and protect the feed-water, closed cooling water pi
pe and equipment from corrosion, a centralized chemical dosing system, which wil
l consisting of solution tank, Y-type suction strainers ,metering pumps and acer
of cessories, ltank, Y-type suction strainers ,metering pumps and accessories,

level gauges, level switches, pump isolation valvthe pH value anches, pump isol
ation valves and pressure gauges will be provided for each two units.
For this project, ammonia and hydrthe pH value and protIn order to maintain the
pH value and protect the feed-water, closed cooling water pipe and equipment fro
m corrosion, a centralized chemical dosing system, which will consisting of solu
tion tank, Y-type suction strainers ,metering pumps and acer of cessories, ljec
t, ammonia and hydthe pH value and protIn order to maintain the pH value and pro
tect the feed-water, closed cooling water pipe and equipment from corrosion, a c
entralized chemical dosing system, which will consisting of solution tank, Y-typ
e suction strainers ,metering pumps and accessories, level gauges, level switche
s, pump isolation valves and pressure gauges will be provided for each two units
.
For this project, ammonia and hydrazthe pH value and protIn order to maintain th
e pH value and protect the feed-water, closed cooling water pipe and equipment f
rom corrosion, a centralized chemical dosing system, which will consisting of so
lution tank, Y-type suction strainers ,metering pumps and accessories, level gau
ges, level switches, pump isolation valves and pressure gauges will be provided
for each two units.
For this project, ammonia and hydrazithe pH value and protIn order to maintain t
he pH value and protect the feed-water, closed cooling water pipe and equipment
from corrosion, a centralized chemical dosing system, which will consisting of s
olution tank, Y-type suction strainers ,metering pumps and accessories, level ga
uges, level switches, pump isolation valves and pressure gauges will be provided
for each two units.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainl be provided for ch
emical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and be provided for chemical dosing room.
In order to marazine will nzine injection will be envisaged. All chemical feed s
olution tanks and accessories are of welded stainl be provided for chemical dosi
ng room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and be provided for chemical dosing room.
In order to marazine will inzine injection will be envisaged. All chemical feed
solution tanks and accessories are of welded stainl be provided for chemical dos
ing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and be provided for chemical dosing room.
In order to marazine will razinzine injection will be envisaged. All chemical fe
ed solution tanks and accessories are of welded stainl be provided for chemical
dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and be provided for chemical dosing room.
In order to marazine will azinzine injection will be envisaged. All chemical fee
d solution tanks and accessories are of welded stainl be provided for chemical d
osing room.
In order to maintain the pH value and protIn order to maintain the pH value and

protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and be provided for chemical dosing room.
In order to marazine will es and pressure gauges will be provided for each two u
nits.
For this prwillet. The hyd PH to prevent the CCW piping and equipment from corro
sion. Phosphate will be injected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provi be provided for chemica
l dosing room.
In order to maintain be injected to closed cooling water pump discharge as deoxi
dant and maintainintain the pH value and protIn order to maintain the pH value a
nd protect the feed-water, closed cooling water pipe and equipment from corrosio
n, a centralized chemical dosing system, which will consistingoject, ammonia and
hydrazinzine injection will be envisaged. All chemical feed solution tanks and
accessories are of welded stainless steel construction. Ammonia and hydrazine wi
ll be injected to deaerator outln strainers ,metering pumps and accessories, lev
el gauges, level switches, pump isolation valves and p be provided with all nece
ssary instrumentation and control systems. Emergency shower and eye washpressure
gauges will be provided for each two units.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outln strainers ,meteri
ng pumps and accessories, level gauges, level switches, pump isolation valves an
d p be provided with all necessary instrumentation and control systems. Emergenc
y shower and eye washess steel construction. Ammonia and hydrazine will be injec
ted to deaerator outln strainers ,metering pumps and accessories, level gauges,
level switches, pump isolation valves and p be provided with all necessary instr
umentation and control systems. Emergency shower and eye washemical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outln strainers ,meteri
ng pumps and accessories, level gauges, level switches, pump isolation valves an
d p be provided with all necessary instrumentation and control systems. Emergenc
y shower and eye wash washer will be provided for chemical dosing room.
In order to be provided for chemical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting be provided for che
mical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outln strainers ,meteri
ng pumps and accessories, level gauges, level switches, pump isolation valves an
d p be provided with all necessary instrumentation and control systems. Emergenc
y shower and eye washof solution tank, Y-type suction strainers ,metering pumps
and accessories, level gauges, level switches, pump isolation valves and pressur

e gauges will be provided for each two units.


For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outln strainers ,meteri
ng pumps and accessories, level gauges, level switches, pump isolation valves an
d p be provided with all necessary instrumentation and control systems. Emergenc
y shower and eye washmaintain the pH value and protIn order to maintain the pH v
alue and protect the feed-water, closed cooling water pipe and equipment from co
rrosion, a centralized chemical dosing system, which will consisting of solutire
ssure gauges will be provided for each two units.
For this project, ammonia and hydrae injection will be envisaged. All chemical f
eed solution tanks and accessories are of welded stainless steel construction. A
mmonia and hydrazine will be injected to deaerator outlet. The hydrazine will be
injected to closed cooling water pump discharge as deoxidant and maintain PH to
prevent the CCW piping and equipment from corrosion. Phosphate will be injected
to the middle of boiler drum.
Two (2) 100% meterinressure gauges will be provided for each two units.
For this project, ammonia and hydrae injection will be envisaged. All chemical f
eed solution tanks and accessories are of welded stainless steel construction. A
mmonia and hydrazine will be injected to deaerator outlet. The hydrazine will be
injected to closed cooling water pump discharge as deoxidant and maintain PH to
prevent the CCW piping and equipment from corrosion. Phosphate will be injected
to the middle of boiler drum.
Two (2) 100% meterinressure gauges will be provided for each two units.
For this project, ammonia and hydrae injection will be envisaged. All chemical f
eed solution tanks and accessories are of welded stainless steel construction. A
mmonia and hydrazine will be injected to deaerator outlet. The hydrazine will be
injected to closed cooling water pump discharge as deoxidant and maintain PH to
prevent the CCW piping and equipment from corrosion. Phosphate will be injected
to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye wazine injection wi
ll be envisaged. All chemical feed solution tanks and accessories are of welded
stainless steel construction. Ammonia and hydrazine will be injected to deaerato
r outlet. The hydrazine will be injected to closed cooling water pump discharge
as deoxidant and maintain PH to prevent the CCW piping and equipment from corros
ion. Phosphate will be injected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems willg pump will be provided for each
dosing point, one operation and the other standby. The dosing systems will be pr
ovided with all necessary instrumentation and control systems. Emergency shower
and eye wazine injection will be envisaged. All chemical feed solution tanks and
accessories are of welded stainless steel construction. Ammonia and hydrazine w
ill be injected to deaerator outlet. The hydrazine will be injected to closed co
oling water pump discharge as deoxidant and maintain PH to prevent the CCW pipin
g and equipment from corrosion. Phosphate will be injected to the middle of boil
er drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems willg pump will be provided for each
dosing point, one operation and the other standby. The dosing systems will be pr
ovided with all necessary instrumentation and control systems. Emergency shower
and eye wazine injection will be envisaged. All chemical feed solution tanks and
accessories are of welded stainless steel construction. Ammonia and hydrazine w
ill be injected to deaerator outlet. The hydrazine will be injected to closed co
oling water pump discharge as deoxidant and maintain PH to prevent the CCW pipin
g and equipment from corrosion. Phosphate will be injected to the middle of boil
er drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems willon tank, Y-type suction strainers

,metering pumps and accessories, level gauges, level switches, pump isolation v
alves and pressure gauges will be provided for each two units.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine w
ill be injected to closed cooling water pump discharge as deoxidant and maintain
PH to prevent the CCW piping and equipment from corrosion. Phosphate will be in
jected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine w
ill be injected to closed cooling water pump discharge as deoxidant and maintain
PH to prevent the CCW piping and equipment from corrosion. Phosphate will be in
jected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine w
ill be injected to closed cooling water pump discharge as deoxidant and maintain
PH to prevent the CCW piping and equipment from corrosion. Phosphate will be in
jected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinzine injection will be envisaged. All chem
ical feed solution tanks and accessories are of welded stainless steel construct
ion. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine w
ill be injected to closed cooling water pump discharge as deoxidant and maintain
PH to prevent the CCW piping and equipment from corrosion. Phosphate will be in
jected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.

In order to maintain the pH value and protIn order to maintain the pH value and
protect the feed-water, closed cooling water pipe and equipment from corrosion,
a centralized chemical dosing system, which will consisting of solution tank, Ytype suction strainers ,metering pumps and accessories, level gauges, level swit
ches, pump isolation valves and pressure gauges will be provided for each two un
its.
For this project, ammonia and hydrazinsher will be provided for chemical dosing
room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suctioect the feed-water, closed cool
ing water pipe and equipment from corrosion, a centralized chemical dosing syste
m, which will consisting of solution tank, Y-type suction strainers ,metering pu
mps and accessories, level gauges, level switches, pump isolation valves and pre
ssure gauges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.

For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.

For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. TheIn order to mai
ntain the pH value and protect the feed-water, closed cooling water pipe and equ
ipment from corrosion, a centralized chemical dosing system, which will consisti
ng of solution tank, Y-type suction strainers ,metering pumps and accessories, l
evel gauges, level switches, pump isolation valves and pressure gauges will be p
rovided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
hydrazine will be injected to closed cooling water pump discharge as deoxidant
and maintain PH to prevent the CCW piping and equipment from corrosion. Phosphat
e will be injected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.

For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order In order to maintain the pH value and protect the feed-water, closed co
oling water pipe and equipment from corrosion, a centralized chemical dosing sys
tem, which will consisting of solution tank, Y-type suction strainers ,metering
pumps and accessories, level gauges, level switches, pump isolation valves and p
ressure gauges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
to maintain theIn ordIn order to maintain the pH value and protect the feed-wate
r, closed cooling water pipe and equipment from corrosion, a centralized chemica
l dosing system, which will consisting of solution tank, Y-type suction strainer
s ,metering pumps and accessories, level gauges, level switches, pump isolation
valves and pressure gauges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) In order to maintain the pH value and protect the feed-water, closed coo
ling water pipe and equipment from corrosion, a centralized chemical dosing syst
em, which will consisting of solution tank, Y-type suction strainers ,metering p
umps and accessories, level gauges, level switches, pump isolation valves and pr
essure gauges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
100% metering pump willIn order to maintain the pH value and protect the feed-wa
ter, closed cooling water pipe and equipment from corrosion, a centralized chemi
cal dosing system, which will consisting of solution tank, Y-type suction strain
ers ,metering pumps and accessories, level gauges, level switches, pump isolatio
n valves and pressure gauges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazineIn or
der to maintain the pH value and protect the feed-water, closed cooling water pi

pe and equipment from corrosion, a centralized chemical dosing system, which wil
l consisting of solution tank, Y-type suction strainers ,metering pumps and acce
ssories, level gauges, level switches, pump isolation valves and pressure gauges
will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine wilI
n order to maintain the pH value and protect the feed-water, closed cooling wate
r pipe and equipment from corrosion, a centralized chemical dosing system, which
will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure ga
uges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
l be injected to closed cooling water pump discharge as deoxidant and maintain P
H to prevent the CCW piping and equipment from corrosion. Phosphate will be inje
cted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
will be injected to closed cooling water pump discharge as deoxidant and mainta
in PH to prevent the CCW piping and equipment from corrosion. Phosphate will be
injected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be proviIn order to maintain the
pH value and protect the feed-water, closed cooling water pipe and equipment fr
om corrosion, a centralized chemical dosing system, which will consisting of sol
ution tank, Y-type suction strainers ,metering pumps and accessories, level gaug
es, level switches, pump isolation valves and pressure gauges will be provided f
or each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
ded with all necessary instrumentation and control systems. Emergency shower and
eye washer will be provided for chemical dosing room.
be provided for each dosing point, one operation and the other standby. The dos
ing systems will be provided with all necessary instrumentation and control syst
ems. Emergency shower and eye washer will be provided for chemical dosing room.
er to maintain the pH value and protect the feed-water, closed cooling water pip
e and equipment from corrosion, a centralized chemical dosing system, which will
consisting of solution tank, Y-type suction strainers ,metering pumps and acces
sories, level gauges, level switches, pump isolation valves and pressure gauges
will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica

l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
pH value and protect the feed-water, closed cooling water pipe and equipment fr
om corrosion, a centralized chemical dosing system, which will consisting of sol
ution tank, Y-type suction strainers ,metering pumps and accessories, level gaug
es, level switches, pump isolation valves and pressure gauges will be provided f
or each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories arIn order to maintain the pH value and pr
otect the feed-water, closed cooling water pipe and equipment from corrosion, a
centralized chemical dosing system, which will consisting of solution tank, Y-ty
pe suction strainers ,metering pumps and accessories, level gauges, level switch
es, pump isolation valves and pressure gauges will be provided for each two unit
s.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
e of welded stainless steel construction. Ammonia and hydrazine will be injected
to deaerator outlet. The hydrazine will be injected to closed cooling water pum
p discharge as deoxidant and maintain PH to prevent the CCW piping and equipment
from corrosion. Phosphate will be injected to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov
ided for chemical dosing room.
In order to maintain the pH value and protect the feed-water, closed cooling wat
er pipe and equipment from corrosion, a centralized chemical dosing system, whic
h will consisting of solution tank, Y-type suction strainers ,metering pumps and
accessories, level gauges, level switches, pump isolation valves and pressure g
auges will be provided for each two units.
For this project, ammonia and hydrazine injection will be envisaged. All chemica
l feed solution tanks and accessories are of welded stainless steel construction
. Ammonia and hydrazine will be injected to deaerator outlet. The hydrazine will
be injected to closed cooling water pump discharge as deoxidant and maintain PH
to prevent the CCW piping and equipment from corrosion. Phosphate will be injec
ted to the middle of boiler drum.
Two (2) 100% metering pump will be provided for each dosing point, one operation
and the other standby. The dosing systems will be provided with all necessary i
nstrumentation and control systems. Emergency shower and eye washer will be prov