IT Office Relocation Planning

Prio
1

Planning Item

Complete By Status

Need help? Learn how to use this template.

Done

Date
Completed

2
3

IT Department Moving Plan

Planning and Mapping (3 Months Prior)

31.12.2014
02.10.2014

2 of 27

Create teams ans assign responsibilities for all aspects of the move

02.10.2014

26.06.2014

Ensure all areas of expertise are covered

02.10.2014

29.03.2014

Contact service providers for all the utilities needed well in advance

02.10.2014

Make plans for business interruptions.

02.10.2014

Identify key internal resources from other departments

02.10.2014

10

Make sure all property is protected from damage, loss or theft during the relocation process.

02.10.2014

Determine what warranties or maintenance protection options exist for each item in your inventory and any
recertification requirements necessary after equipment and systems are reinstalled at new location. Extra
insurance items may be purchased for those not already covered.

02.10.2014

11
12

Schedule the move. Obtain quotes from moving companies and evaluate if an efficient relocation expert is
necessary.

02.10.2014

13

Plan every detail. Obtain a blueprint of the complete office layout including the locations of desks and
printer stands to optimize power outlets and communications ports.

02.10.2014

14

Develop a checklist of changes. Log any changes required once servers, user systems and network
equipment are in place at the new location.

02.10.2014

15

Seek specialists as appropriate. Be willing to obtain outside help in areas such as network wiring, server
setup, project management and infrastructure design.

02.10.2014

16

If you employ a relocation specialist, negotiate and sign a statement of work that will detail the entire
process.

02.10.2014

17

Plan your new network configuration. This should include wired, fiber-optic and wireless components, as
well as any upgrades you intend to include.

02.10.2014

18

Determine which equipment and applications/workstations should be up and running first. Prioritize move
items.

02.10.2014

19

Coordinate elevators and shipping docks with building management

02.10.2014

20

Request a detailed copy of the floor plan that includes proposed furniture orientation

02.10.2014

21

Review final space plans, including electrical and furniture placement

02.10.2014

22

If modular furniture is being used, run the network cabling before the furniture is installed

02.10.2014

23

Determine PC and printer locations in the new space

02.10.2014

24

Determine the location of fax machines in the new space

02.10.2014

Exported on 13 martie 2015 10:50:22 IST

29.03.2014

Page 1 of 8

Responsible Party Notes

United Movers
Ken L
John G
Ken L
Ken L
United Movers
Ken L

Ken L
Ken L

Ken L
Ken L

Exported on 13 martie 2015 10:50:22 IST

Page 2 of 8

Prio

Planning Item

Complete By Status

25

Identify personal printers on the floor plan

02.10.2014

26

Identify analog lines on the floor plan

02.10.2014

27

Determine jack locations (on the furniture plan) for voice and data

02.10.2014

28

Obtain floor plan approval

02.10.2014

29

Obtain bids for working

02.10.2014

30

Check to see if the doorways, access hallways, ramps and the elevator doors are wide enough for moving
equipment to fit through

02.10.2014

31

Conduct thorough walkthru inspection of new facility

02.10.2014

32
33

Equipment (2 Months Prior)


Inventory existing equipment and hardware:

01.11.2014

Computers

01.11.2014

35

Monitors

01.11.2014

36

Printers

01.11.2014

37

Modems

01.11.2014

38

Servers

01.11.2014

39

Surge protectors

01.11.2014

40

Fax machines

01.11.2014

41

Data cables

01.11.2014

42

Network switches

01.11.2014

43

Copiers

01.11.2014

44

Assess the need for any new equipment required

01.11.2014

45

Arrange for new Security/Video surveillance system

01.11.2014

46

Plan for lead time required in ordering new equipment items

01.11.2014

47

Devise plan for properly disposing of or donating old equipment

01.11.2014

48

Ensure all redundant IT equipment is disposed of correctly

01.11.2014

49

Review service calls for last year and identify likely-to-fail parts and order additional to be prepared

01.11.2014

50

Have a physical backup for all servers (transport separately)

01.11.2014

Labeling (1 Month Prior)

Exported on 13 martie 2015 10:50:22 IST

Date
Completed

0 of 8

01.11.2014

34

51

Done

01.12.2014

0 of 7

Page 3 of 8

Responsible Party Notes

Exported on 13 martie 2015 10:50:22 IST

Page 4 of 8

Prio

Planning Item

Complete By Status

52

Before you move a single cable, develop a detailed inventory of all hardware and software including serial
numbers and approximate weights and values of each item.

01.12.2014

53

Prepare for worst-case scenarios. Document your backup procedures, label all wiring and machines, and
have tools to disassemble and assemble equipment.

01.12.2014

54

Make sure all lines are labeled with "A" for analog, "V" for digital phone lines and "D" for network lines

01.12.2014

55

Verify all wiring has permanent labels on both ends with room, plate and jack numbers.

01.12.2014

56

Post a set of floor plans next to the patch panels with all room numbers and wall plate locations clearly
identified

01.12.2014

57

Label computers, boxes, binders, switches, keyboards, mice and other equipment with destination info
(room numbers/locations)

01.12.2014

58

Confirm 30 days ahead of time with all vendors

01.12.2014

59

Wiring Items (2 Weeks Prior)

17.12.2014

60

Schedule wiring according to the construction timeline for newly-built or renovated space

17.12.2014

61

Identify the telephone and data cabling close/room within the space

17.12.2014

62

Detail server room requirements

17.12.2014

63

Research new power needs and look for opportunities to improve performance.

17.12.2014

64

Confirm proper shelving or racks for server and network equipment

17.12.2014

65

Confirm room dimensions of server room

17.12.2014

66

Verify electrical requirements of server room

17.12.2014

67

Verify proper ventilation system

17.12.2014

68

Verify separate climate control

17.12.2014

69

Test all network and phone drops

17.12.2014

70

Test all power outlets using a tester as well as by plugging something in

17.12.2014

71

Map the locations of the desks and use a mapping tool to estimate cable sizes

17.12.2014

72

Plan for extra wiring drops.

17.12.2014

73

Verify all backup batteries for phone switches and servers are installed according to schedule

17.12.2014

74

If using an 800 phone number, confirm plans with vendor for cutover date and time.

17.12.2014

75

Test new telephone line several days before the move

17.12.2014

76

Review programming/routing on voicemail system for required changes.

17.12.2014

77

Disconnect all leased lines, such as T1s at old location

17.12.2014

78

If company web address is hosted internally, verify if change to DNS resolution is required.

17.12.2014

Exported on 13 martie 2015 10:50:22 IST

Done

Date
Completed

0 of 13

Page 5 of 8

Responsible Party Notes

Exported on 13 martie 2015 10:50:22 IST

Page 6 of 8

Prio
79

Planning Item
Meetings and Special Communications (1 Week Prior)

Complete By Status
24.12.2014

80

Conduct security system and telephone system training if new ones are to be implemented

24.12.2014

81

Distribute new access cards to staff

24.12.2014

82

Identify key contacts and new locations

24.12.2014

83

Create a list of contact names, phone numbers, cell phone numbers, email addresses, etc to distribute to
responsible parties. Include property management contacts, local phone company, website master, etc.

24.12.2014

84

Arrange for local staff contact to be onsite for deliveries and needed vendor access to the space prior to
opening.

24.12.2014

85

Establish and inventory every telephone number to be moved

24.12.2014

86

Schedule a meeting with local phone vendor

24.12.2014

87

Schedule disconnects or additions of phone lines

24.12.2014

88

Transfer any ISDN lines

24.12.2014

89

Schedule phone activation time for new office location

24.12.2014

90

Have a team meeting to confirm roles and responsibilities

24.12.2014

91

Update all pertinent information with your company's backup alarm system, office security stems, etc

24.12.2014

92

Remind users to backup their own files as necessary

24.12.2014

93

If any reconfig is necessary at the new site, script all steps and test before the move

24.12.2014

94

Script the shutdown steps of all equipment

24.12.2014

Know the details of your service contracts. If a move will take you out of a service area, immediately get
your contracts and documentation out and review them carefully. If possible, schedule an office move in
tandem with contract end dates.

24.12.2014

95
96

Perform complete backup of network

24.12.2014

97

Perform complete backup of telephone system

24.12.2014

98

Test new office phones, computers, printers, security cameras, Internet connection and all electrical devices
the day prior to staff returning to work

24.12.2014

Exported on 13 martie 2015 10:50:22 IST

Done

Date
Completed

0 of 19

Page 7 of 8

Responsible Party Notes

Exported on 13 martie 2015 10:50:22 IST

Page 8 of 8