Prio
1
Planning Item
Complete By Status
Done
Date
Completed
2
3
31.12.2014
02.10.2014
2 of 27
Create teams ans assign responsibilities for all aspects of the move
02.10.2014
26.06.2014
02.10.2014
29.03.2014
Contact service providers for all the utilities needed well in advance
02.10.2014
02.10.2014
02.10.2014
10
Make sure all property is protected from damage, loss or theft during the relocation process.
02.10.2014
Determine what warranties or maintenance protection options exist for each item in your inventory and any
recertification requirements necessary after equipment and systems are reinstalled at new location. Extra
insurance items may be purchased for those not already covered.
02.10.2014
11
12
Schedule the move. Obtain quotes from moving companies and evaluate if an efficient relocation expert is
necessary.
02.10.2014
13
Plan every detail. Obtain a blueprint of the complete office layout including the locations of desks and
printer stands to optimize power outlets and communications ports.
02.10.2014
14
Develop a checklist of changes. Log any changes required once servers, user systems and network
equipment are in place at the new location.
02.10.2014
15
Seek specialists as appropriate. Be willing to obtain outside help in areas such as network wiring, server
setup, project management and infrastructure design.
02.10.2014
16
If you employ a relocation specialist, negotiate and sign a statement of work that will detail the entire
process.
02.10.2014
17
Plan your new network configuration. This should include wired, fiber-optic and wireless components, as
well as any upgrades you intend to include.
02.10.2014
18
Determine which equipment and applications/workstations should be up and running first. Prioritize move
items.
02.10.2014
19
02.10.2014
20
Request a detailed copy of the floor plan that includes proposed furniture orientation
02.10.2014
21
02.10.2014
22
If modular furniture is being used, run the network cabling before the furniture is installed
02.10.2014
23
02.10.2014
24
02.10.2014
29.03.2014
Page 1 of 8
United Movers
Ken L
John G
Ken L
Ken L
United Movers
Ken L
Ken L
Ken L
Ken L
Ken L
Page 2 of 8
Prio
Planning Item
Complete By Status
25
02.10.2014
26
02.10.2014
27
Determine jack locations (on the furniture plan) for voice and data
02.10.2014
28
02.10.2014
29
02.10.2014
30
Check to see if the doorways, access hallways, ramps and the elevator doors are wide enough for moving
equipment to fit through
02.10.2014
31
02.10.2014
32
33
01.11.2014
Computers
01.11.2014
35
Monitors
01.11.2014
36
Printers
01.11.2014
37
Modems
01.11.2014
38
Servers
01.11.2014
39
Surge protectors
01.11.2014
40
Fax machines
01.11.2014
41
Data cables
01.11.2014
42
Network switches
01.11.2014
43
Copiers
01.11.2014
44
01.11.2014
45
01.11.2014
46
01.11.2014
47
01.11.2014
48
01.11.2014
49
Review service calls for last year and identify likely-to-fail parts and order additional to be prepared
01.11.2014
50
01.11.2014
Date
Completed
0 of 8
01.11.2014
34
51
Done
01.12.2014
0 of 7
Page 3 of 8
Page 4 of 8
Prio
Planning Item
Complete By Status
52
Before you move a single cable, develop a detailed inventory of all hardware and software including serial
numbers and approximate weights and values of each item.
01.12.2014
53
Prepare for worst-case scenarios. Document your backup procedures, label all wiring and machines, and
have tools to disassemble and assemble equipment.
01.12.2014
54
Make sure all lines are labeled with "A" for analog, "V" for digital phone lines and "D" for network lines
01.12.2014
55
Verify all wiring has permanent labels on both ends with room, plate and jack numbers.
01.12.2014
56
Post a set of floor plans next to the patch panels with all room numbers and wall plate locations clearly
identified
01.12.2014
57
Label computers, boxes, binders, switches, keyboards, mice and other equipment with destination info
(room numbers/locations)
01.12.2014
58
01.12.2014
59
17.12.2014
60
Schedule wiring according to the construction timeline for newly-built or renovated space
17.12.2014
61
Identify the telephone and data cabling close/room within the space
17.12.2014
62
17.12.2014
63
Research new power needs and look for opportunities to improve performance.
17.12.2014
64
17.12.2014
65
17.12.2014
66
17.12.2014
67
17.12.2014
68
17.12.2014
69
17.12.2014
70
17.12.2014
71
Map the locations of the desks and use a mapping tool to estimate cable sizes
17.12.2014
72
17.12.2014
73
Verify all backup batteries for phone switches and servers are installed according to schedule
17.12.2014
74
If using an 800 phone number, confirm plans with vendor for cutover date and time.
17.12.2014
75
17.12.2014
76
17.12.2014
77
17.12.2014
78
If company web address is hosted internally, verify if change to DNS resolution is required.
17.12.2014
Done
Date
Completed
0 of 13
Page 5 of 8
Page 6 of 8
Prio
79
Planning Item
Meetings and Special Communications (1 Week Prior)
Complete By Status
24.12.2014
80
Conduct security system and telephone system training if new ones are to be implemented
24.12.2014
81
24.12.2014
82
24.12.2014
83
Create a list of contact names, phone numbers, cell phone numbers, email addresses, etc to distribute to
responsible parties. Include property management contacts, local phone company, website master, etc.
24.12.2014
84
Arrange for local staff contact to be onsite for deliveries and needed vendor access to the space prior to
opening.
24.12.2014
85
24.12.2014
86
24.12.2014
87
24.12.2014
88
24.12.2014
89
24.12.2014
90
24.12.2014
91
Update all pertinent information with your company's backup alarm system, office security stems, etc
24.12.2014
92
24.12.2014
93
If any reconfig is necessary at the new site, script all steps and test before the move
24.12.2014
94
24.12.2014
Know the details of your service contracts. If a move will take you out of a service area, immediately get
your contracts and documentation out and review them carefully. If possible, schedule an office move in
tandem with contract end dates.
24.12.2014
95
96
24.12.2014
97
24.12.2014
98
Test new office phones, computers, printers, security cameras, Internet connection and all electrical devices
the day prior to staff returning to work
24.12.2014
Done
Date
Completed
0 of 19
Page 7 of 8
Page 8 of 8