Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT
Identification

Commodity

HC-T-&C/2010/0008

Activity
No.

Inspection/ Test Activity Item

SOIL INVESTIGATION and SURVEYING

Involvement & Signature

SOIL INVESTIGATION and SURVEYING (1/1)

Sub-Contractor

Contractor

OWNER

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Verifing
Document

Elevation and Coordinate

Visual &
Dimensional

100%

AFC drawings

Survey Report

Ws

Ws

Correct Location

Dimensional &
Survey

100%

AFC drawings

Sub-cont. report

Ws

Appearance

Visual

100%

correct function

Sub-cont. report

Correct dimension and depth

Visual &
Dimensional

100%

BS 1377

Sub-cont. report

Ws

Ws

Depth

Test

each 1.5 m
depth of soil

BS 1377

Sub-cont. report

Ws

Ws

Charateristic to be
Verified/Inspected/Tested

Date/Sign

Date/Sign

Regulatory

Date/Sign

SURVEYING
a)

Survey of location protection of


coordinates and benchmark
SOIL INVESTIGATION

a)

Location of Soil Investigation

b)

Check of Equipments

c)

Boring

d)

Standard Penetration Test (SPT)

e)

Undisturbed Sampling

Sample

Visual

100%

BS 1377

Sub-cont. report

Ws

Ws

f)

Dutch Cone Sounding ( if required )

Density

Test

Measuring
interval less
than 20 cm

BS 1377

Sub-cont. report

g)

Laboratory Soil Test

Soil characteristic

Test

as specified

BS 1377

Sub-cont. report

Ws

Ws

h)

Unconfined Compression Test

Compression

Test

as specified

BS 1377

Sub-cont. report

i)

Consolidation Test

Load

Test

as specified

BS 1377

Sub-cont. report

j)

Chemical analysis of Soil

Chemical properties

Test

as specified

BS 1377

Sub-cont. report

Requisition

Sub-cont. report

Ws

Ws

Requisition

Boring Logs

k)

Method of Storing Samples

Method

Visual

each 1.5 M of
boring hole
(SPT sample)

l)

Boring Logs

Record

Visual

each Log

Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

16-Oct-14

I: RFI, mandatory inspection and repprt


W: RFI, option inspection and as report
H: RFI, mandatory inspection and as report
R: No RFI, No inspection and review/sign report
S: No RFI, monitoring works and no sign report

Name : Amir GJ Tarigan / FQM

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date:

Date:

Date:

Date/Sign

Remarks

Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Sub-Contractor

Contractor

OWNER

Frequency

Dimensional &
Survey

100%

AFC drawings

QI-S.0.01, QIS.0.02

Ws

Correct Location

Dimensional &
Survey

each protection
coordinate and
BM

AFC drawings

QI-S.0.01, QIS.0.02

Ws

Cleaning Area

Visual

100%

AFC drawings

QI-C-0.01

Ws

Drainage & Slit Trap

Visual

100%

AFC drawings

QI-C-0.01

Ws

Correct Location

Survey

100%

AFC drawings

QI-C-0.01

Ws

Visual

100%

AFC drawings

QI-C-0.01

Ws

Ws

Visual

100%

AFC drawings

QI-C-0.01

Ws

Correct dimension

Survey

100%

AFC drawings

QI-C-0.01

Ws

Ws

Correct dimension

Survey

100%

AFC drawings

QI-C-0.01

Correct protection

Visual

100%

AFC drawings

QI-C-0.01

Ws

Ws

4) Quality of Cleaning

Cleaning

Visual

100%

AFC drawings

QI-C-0.01

Ws

Ws

5) Excavation In Work

Correct dimension

Visual

100%

AFC drawings

QI-C-0.01

Ws

Ws

Cleaning

Visual

Random

PTS 34.11.00.11

QI-C-0.06

Ws

Ws

Charateristic to be
Verified/Inspected/Tested

Verifing
Document

Date/Sign

Date/Sign

Date/Sign

Regulatory

Date/Sign

SITE PREPARATION (EARTH WORK)


SURVEYING
Location, number, stability and protection
of coordinates and Benchmark
Topography Survey After Completion of
b) Clearing, Striping , Removal of
Vegetation
CLEARING, STRIPPING, AND
REMOVAL VEGETATION
TEMPORARY DRAINAGE AND SLIT
TRAP
a)

SITE PREPARATION (EARTH WORK) (1/2)


Methode of
Inspection

Inspection/ Test Activity Item

Involvement & Signature

Acceptance
Criteria/Reference
Document

Activity
No.
II

Identification

Commodity

HC-T-&C/2010/0008

Correct Location

EXCAVATION
A Preparation
Set out location, based on shop drawing
and endorsed Benchmark
Demolition or Protection of Existing
2)
Facility
Investigation of Existing under-ground
3)
Facilities
1)

Protection of Existing
Facilities
Protection of Existing
Facilities

B Excavation Work
1) Depth and width of excavation
2)

Line, Slope and Grades according to


approved drawing

3) Protection of Slope, Accepted

BACK FILLING
A Preparation
1) Quality of cleaning before filling
2) Quality of filling material

Prepared by (Contractor)

correct filling material


Approved by (Contractor)

Visual

Random

PTS 34.11.00.11
Rev.No:

8
Name : Yudha Kristanto / QC Engineer

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

QI-C-0.06 & others


reports for soil test
Date:
16-Oct-14

Name : Amir GJ Tarigan / FQM

I:
W:
H:
R:
S:

RFI, mandatory inspection and repprt


RFI, option inspection and as report
RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX) Authorization (FQM-MHI)

Date:

Date:

Date:

Remarks

Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT
Identification

Commodity

HC-T-&C/2010/0008

Activity
No.

Inspection/ Test Activity Item

Involvement & Signature

SITE PREPARATION (EARTH WORK) (2/2)

Sub-Contractor

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Verifing
Document

Cleaning

Visual

Random

PTS 34.11.00.11

QI-C-0.06

correct as per specification

Visual

Random

PTS 34.11.00.11

QI-C-0.06

IFC Drawing

AFC drawings

QI-C-0.06, QIS.0.01, QI-S.0.02

each Layer

AASHTO T 180,
ASTM D 5195, BS
1377

ASTM D 5195, BS
1377

Charateristic to be
Verified/Inspected/Tested

Contractor

Date/Sign

OWNER

Date/Sign

Date/Sign

Regulatory

Date/Sign

B Placement of fill
Cleaning (removal of trash debris, etc.)
in soil
Sand filling around underground pipe
2)
and cable (if any)
1)

3) Final Elevation
4) Spreading Thickness per Layer

Correct Elevation
As Field Compaction Trial
(150 mm to 450 mm)

Survey
Survey

Ws

Ws

Ws

Ws

Sub-cont. report

Ws

Lab.Test Report

C Testing / Monitoring

1) Compaction Test

2) Demolish of debris, etc


3) Soil Monitoring

Prepared by (Contractor)

Compaction result

Construction
Specification for
Site Preparation
Sand Cone test
and Earth Work
(6419P C26500102)

Clean

Monitoring

100%

Inclinometer

Monitoring

weekly

Settlement Marker

Monitoring

weekly

Piezometer

Monitoring

weekly

Approved by (Contractor)

Good clean

ITB 8.19.11 & 8.19.12

Rev.No:

QI-G.01

Ws

Sub-cont. report

Ws

Sub-cont. report

Ws

Sub-cont. report

Ws

Date:

8
Name : Yudha Kristanto / QC Engineer

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

16-Oct-14

Name : Amir GJ Tarigan / FQM

I: RFI, mandatory inspection and repprt


W:
H:
R:
S:

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX) Authorization (FQM-MHI)

Date:

Date:

Date:

Remarks

Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Activity
No.
III

Identification

Commodity

HC-T-&C/2010/0008

Inspection/ Test Activity Item

Involvement & Signature

TEMPORARY FACILITIES (1/1)

Sub-Contractor

Contractor

OWNER

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Location,coordinate &
elevation

Dimensional

100%

Correct
location,coordinate &
elevation and within
tolerances

QI-S.0.01,QIS.0.02

Ws

Ws

Charateristic to be
Verified/Inspected/Tested

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Verifing
Document

Date/Sign

Date/Sign

Date/Sign

Regulatory

Date/Sign

TEMPORARY FACILITIES
a)

Survey coordinate and elevation

b)

Check for building erection

Foundation, plumbness,
building completion

Visual

100%

As per Approved
Drawing &
requirements

QI-G.05

Ws

Ws

c)

Check for equipments and fittings

Installation and function

Visual

100%

Correct Install &


Function & within
tolerances

QI-G.05

Ws

Ws

d)

Check for sanitation

Installation and function

Visual

100%

Correct Install &


Function & within
tolerances

QI-G.05

Ws

Ws

e)

Check for plumbing

Installation and function

Visual

100%

Correct Install &


Function & within
tolerances

QI-G.05

Ws

Ws

f)

Check for lighting & telecommunication

Installation, illumination and


function

Visual

100%

QI-G.05

Ws

Ws

g)

Check for Ventilation & Air Conditioner

Installation and function

Visual

100%

QI-G.05

Ws

Ws

h)

Check for Furniture

Type and Number

Visual

100%

QI-G.05

Ws

Ws

i)

Check for Portable Fire Extinguisher

Type and Number

Visual

100%

QI-G.05

Ws

Ws

j)

Check for internal finished

Internal finished

Visual

100%

QI-G.05

Ws

Ws

k)

Check for external finished

External finished

Visual

100%

QI-G.05

Ws

Ws

l)

Check for Grounding

Installation and function

Visual

100%

QI-G.05

Ws

Ws

m) Check for Satelite TV

Installation and function

Visual

100%

QI-G.05

Ws

Ws

Remain of inspection

Visual

100%

QI-G.05

n)
o)

Final Inspection
Authority Inspection

Prepared by (Contractor)

Fitness
Approved by (Contractor)

Visual

Correct Install &


Function & within
tolerances
Correct Install &
Function
Correct type and
Number as specified
on contract
Correct type and
Number as specified
on drawing
Complete as per Dwg.
Requirements
Complete as per Dwg.
Requirements
Complete as per Dwg.
Requirements
Complete as per Dwg.
Requirements
Close punch list

as required

As per Dwg
Rev.No:

8
Name : Yudha Kristanto / QC Engineer

Date

Temporary CF
(Certificate of
Fitness)
Date:
16-Oct-14

Name : Amir GJ Tarigan / FQM

I: RFI, mandatory inspection and repprt


W: RFI, option inspection and as report
H: RFI, mandatory inspection and as report
R: No RFI, No inspection and review/sign report
S: No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date:

Date:

Date:

Remarks

Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Activity
No.

Identification

Commodity

HC-T-&C/2010/0008

Inspection/ Test Activity Item

Involvement & Signature

TEMPORARY FACILITIES (1/1)


Charateristic to be
Verified/Inspected/Tested

Methode of
Inspection

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Sub-Contractor

Frequency

Acceptance
Criteria/Reference
Document

Verifing
Document

Date/Sign

Contractor

Date/Sign

OWNER

Date/Sign

Regulatory

Date/Sign

Remarks

Inspection and Test Plan For Civil, Structural & Architectural Work

MHI-APEX-REKIND
QA/QC

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Activity
No.
IV

Inspection/ Test Activity Item

PILING WORK (Concrete Pile) Including Jetty


(1/1)

Sub-Contractor

Contractor

OWNER

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Verifing Document

Correct material and


Appearance

Visual

Each Receiving

Specification and
Code

QI - G.07a

Coordinate and level

Dimensional

100%

AFC Drawings

QI-S.0.01

Correct location and


plumbness

Visual

100%

AFC Drawings

QI-S.0.01

Correct blow

Visual & Dim.

as per
specification

QI-C.1.02

W,R

Complete welding/ WPS

Visual

100%

Construction
Specification
Construction
Specification

QI-C.1.03

Defect

Test

minimum10%
random
locations

QI-C.1.03/NDE Report

Complete Coating

Visual

100%

QI-C.1.03

Correct level

Dimensional

100%

Construction
Specification
AFC Drawings

QI-S.0.01

Correct coordinate

Dimensional

100%

AFC Drawings

QI-S.0.01

Correct poin

Visual

As per
approved
procedure

PTS 34.11.00.12

QI-C.1.04

W/R

Remaining item inspection

Review

100%

AFC Drawings

Inspection and test


reports

Charateristic to be
Verified/Inspected/Tested

MATERIAL RECEIVING INSPECTION

Date/Sign

Date/Sign

Remarks

Date/Sign

PREPARATION
a) Coordinates of setting out of piles by survey

PILING WORK
a)

Location and inclination of pile and survey for


Piling points

b) Number of blow
c) Check of welding joint.
d) Dye Penetrant Test
e)
f)

Coating Check (Coal tar Epoxy coating or


similar)
Elevation of pile head cut off

g) Survey of pile off set after blowed

Construction
Specification

LOAD TEST
b) Identify point, Test Execution and Result

Involvement & Signature

PILING WORK (Concrete Pile) Including Jetty

Identification

Commodity

HC-T-&C/2010/0008

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

FINAL INSPECTION
a) Final Inspection

Prepared by (Contractor)

Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt

A
Approved by (Contractor)
p
p
r
o
vName : Amir GJ Tarigan / FQM
e
d

Rev.No:

Date:

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorizat Authorization (FQM-MHI)

b
y

Date:

Date:

Date:

16-Oct-14

W: RFI, option inspection and as report


H: RFI, mandatory inspection and as report
R: No RFI, No inspection and review/sign report
S: No RFI, monitoring works and no sign report

Project No.
HC-T-&C/2010/0008

Activity
No.

Identification

Commodity

Inspection/ Test Activity Item

Involvement & Signature

PILING WORK (Concrete Pile) Including Jetty


(1/1)
Charateristic to be
Verified/Inspected/Tested

Methode of
Inspection

Frequency

Sub-Contractor
Acceptance
Criteria/Reference
Document

Verifing Document

Date/Sign

Contractor

Date/Sign

OWNER

Date/Sign

Remarks

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

V
1

Identification

Involvement & Signature

CIVIL WORKS (1/3)

Sub-Contractor

Contractor

OWNER

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Correct material and


Appearance

Visual

Each Receiving

Specification and
Code

QI - G.07a

Cyment type

Review, Visual,
Test

once in every
month

ASTM C 150

Certificate

R,I

Cyment type

Review, Visual,
Test

once in every
month

ASTM C 150

Certificate

R,I

b) Fine Aggregate

Visual

Sieve Analysis,
Elongation and
Flakiness Test

once/
3500T~5000T

ASTM C 33

Inspection Report

c) Coarse Aggregate

Visual

Sieve Analysis

once/
3500T~5000T

ASTM C33

Inspection Report

Visual , Test

Visual , Tensile
Test , Bend Test

each supplier
& heat.no

ASTM A615

Certificate & Test


Report

pH

Test

twice / year
January&June

BS 3148, BS 2690

Test Report

As spesified

Visual & Review

Each concrete
type

ASTM 494

Certificate

R,I

W/R

Activity
No.

Inspection/ Test Activity Item

Charateristic to be
Verified/Inspected/Tested

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Verifing Document

Date/Sign

Date/Sign

Remarks

Date/Sign

CIVIL WORK
MATERIAL RECEIVING INSPECTION
Civil materials including :
a) (i) Portland Cement,
(ii) Blast Furnace Cement/Silika Fume
(if required)

d) Reinforcing Bars

e) Water

f)
2

Admixture

PREPARATION
a) Mix design and Trial mix of concrete
b) Survey Work

Concrete composition, slump


Visual & Review
& stregth requirements
Coordinate, elevation

Dimension

Each concrete
type
each survey
work

BS 1881, BS 5328
AFC Drawing

QI-S.0.02

CONCRETING (Foundation, Column, Slab,


Pavement, etc)
a) Excavation

Inspection of Re-bar , incl. Barbending


b)
Schedule
Prepared by (Contractor)

Location and Dimension


Diameter, Spacing, Number
and Cleanliness
Approved by (Contractor)

Visual &
Dimensional
Visual &
Dimensional

100%
100%

AFC Drawings
AFC Drawings
Rev.No:

QI-C.0.01
QI-C.2.02 &
QI-C.2.03
Date:

I: RFI, mandatory inspection and repprt

Certified Complete (Contractor-PM/CM)

W: RFI, option inspection and as report


H: RFI, mandatory inspection and as report
R: No RFI, No inspection and review/sign report
S: No RFI, monitoring works and no sign report
Authorization (FQM-REKIND/APEX) Authorization (FQM-MHI)

Date:

Date:

8
Name : Yudha Kristanto / QC Engineer

Mix Design Report


QI-S.0.01 &

16-Oct-14

Name : Amir GJ Tarigan / FQM

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

Activity
No.

Inspection/ Test Activity Item


c)

Identification

Involvement & Signature

CIVIL WORKS (2/3)


Charateristic to be
Verified/Inspected/Tested

Sub-Contractor
Methode of
Inspection

Contractor

OWNER

Frequency

Acceptance
Criteria/Reference
Document

Verifing Document

100%

AFC Drawings

QI-C.2.02

100%

AFC Drawings

QI-C.2.02

Date/Sign

Date/Sign

Inspection of Embedded Material for


EMC (Electro Magnetic Compatible)
Visual &
Dimensional
Visual &
Dimensional

Location and Tighteness

- Embedded Cable

Location and Tighteness

d) Inspection of Form Work

Inside dimensions, Rigidity


and Cleanliness

Visual &
Dimensional

100%

AFC Drawings

QI-C.2.02

Location and dimensions

Dimensional

100%

AFC Drawings

QI-S.0.01

Number of samples

Visual

12 Samples /
20m3

Construction
Specification for
Concrete Work

QI-C.2.05 &
QI-C.2.06

g) Measure Slump

Each Load

Test

Each load

Construction
Specification for
Concrete Work

QI-C.2.07b

h) Air Content Test

Measure

Test

twice / week

ASTM C 231

Test Report

Visual

Test

Random

ASTM C 136

Test Report

QI-C.2.08

e) Measure inserts / Anchor Bolt

i)

Take Concrete Test Samples

Aggregate Gradation Test

Each Load

Visual

Each curing

Construction
Specification for
Concrete Work

Measure Compressive Strength at 7


and 28 days

Compressive Strength

Test

8 Samples /
20m3

Construction
Specification for
Concrete Work

QI-C.2.05

Visually Inspection Surface Finish

Appearance
(honeycomb,crack, etc)

Visual

100%

PTS 34.19.20.31;
Construction
Specification for
Concrete Work

QI-C.2.08

Water absorbtion

Test

every casting
200m3, or per
month to critical
area

BS 1881

Test Report

Dimensions, Elevation and


Anchor bolts / boxs position

Visual &
Dimensional

100%

AFC Drawings

QI-C.2.08 & Survey


Report

j)

Method of Curing

k)

l)

m)

Remarks

Date/Sign

- Embedded Plate

f)

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Water Absorption Test 2% of Concrete


as per BS

n) Final Check
OTHER TESTING - See PTS
34.19.20.31 Petronas Technical
o) Specification , Reinforced Concrete
Foundations and Structure, Appendix -3
(Attached)
Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt


16-Oct-14

Name : Amir GJ Tarigan / FQM

W:
H:
R:
S:

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX) Authorization (FQM-MHI)

Date:

Date:

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

Activity
No.
4

Inspection/ Test Activity Item

Identification

Involvement & Signature

CIVIL WORKS (3/3)

Sub-Contractor
Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

survey , excavation,
sloping,elevation, backfill.

Visual and
Dimension

100%

AFC Drawings

Survey, post, chain link,


tightenes chain link.

Visual and
Dimensional

Survey, pre-cast, joint filler,


joint sealant, filling material,
slope.

Visual &
dimensional

Survey, pre-cast, joint filler,


joint sealant, filling material,
slope.

Survey , gravel material,


celaning before spreading,
slope to drain.

Charateristic to be
Verified/Inspected/Tested

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Verifing Document

Contractor

Date/Sign

OWNER

Date/Sign

Remarks

Date/Sign

SEWER
QI-S.0.01 &
a) Installation check

100%

AFC Drawings

QI-S.0.09 & QI-C.5.11

100%

AFC Drawings

QI-S.0.012, QI-C.0.01
& QI-C.5.12

Visual &
dimensional

100%

AFC Drawings

QI-S.0.01 & QIS.0.02, QI-C.0.01 &


QI-C.5.14

Visual &
dimensional

100%

AFC Drawings

QI-S.0.01 & QIS.0.02, QI-C.5.09

CABLE TRENCH

a) Installation check

DRAINAGE

a) Installation check

FENCING
a) Installation check

I
QI-S.0.02,QI.C.0.01,
C.0.06

GRAVEL

a) Installation check
Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

Certified Complete (Contractor-PM/CM)


Date:

Date:

8
Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt


W: RFI, option inspection and as report
H: RFI, mandatory inspection and as report
R: No RFI, No inspection and review/sign report
S: No RFI, monitoring works and no sign report
Authorization (FQM-REKIND/APEX) Authorization (FQM-MHI)

16-Oct-14

Name : Amir GJ Tarigan / FQM

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Identification

Involvement & Signature

BUILDING WORK (1/2)

Sub-Contractor

Contractor

OWNER
Remarks

Activity
No.
VI

Inspection/ Test Activity Item

MATERIAL RECEIVING INSPECTION

CONCRETEING WORK (refer to section Civil Works)

WALL MASONRY WORK


a)

Specification and
Code

QI - G.07a

Ws

Ws

Brick, mortar , coloumn


practice, etc.

Visual

Random

AFC Drawings

QI-C.4.01

Installation check

Mixing of plastering, finishing Visual

Random

AFC Drawings

QI-C.4.02

Installation check

Tile material andn type,


pattern & lay-out, plumb and
level, joint.

Visual

Random

AFC Drawings

QI-C.4.03

Installation check

Tile material and type, pattern


Visual
& lay-out, cleaning.

Random

AFC Drawings

QI-C.4.04

Installation check

Material type,frame,
operation.

Visual

Random

AFC Drawings

QI-C.4.05

Material type,sealing,
cleaning

Visual

Random

AFC Drawings

QI-C.4.07

Material type,joint, lay-out &


pattern

Visual

Random

AFC Drawings

QI-C.4.08

GLASS AND GLAZING INSTALLATION


a)

Installation check

Correct material and


Appearance

DOOR AND WINDOW WORKS


a)

Each Receiving

Verifing Document

VINYL FLOOR TILE WORK


a)

Visual

Date/Sign

TILE WORK
a)

Frequency

Date/Sign

PLASTERING WORK
a)

Methode of
Inspection

Date/Sign

BUILDING WORK

Charateristic to be
Verified/Inspected/Tested

Acceptance
Criteria/Reference
Document

Installation check

GYPSUM BOARD INSTALLATION


a)

Installation check

Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt


16-Oct-14

Name : Amir GJ Tarigan / FQM

W:
H:
R:
S:

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date:

Date:

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Identification

Involvement & Signature

BUILDING WORK (2/2)

Sub-Contractor

Contractor

OWNER
Remarks

Activity
No.
10

Inspection/ Test Activity Item

Installation check

Equipment type,
support/hanger, drain, union,
Visual
pressure test, inside cleaning,
painting.

Random

AFC Drawings

QI-C.6.03 & QI-C6.06

Installation check

Material type, layers,

Visual

Random

AFC Drawings

QI-C.4.10

Installation check

Equipment/material type,
position, alignment, level.

Visual

Random

AFC Drawings

QI-C.4.10

Equipment/material type,
position, alignment, level,
function test

Visual

Random

AFC Drawings

QI-C.7.01

equipment/material type,
position, alignment,
Visual
level.cleaning, test for proper
function.

Random

AFC Drawings

QI-C.4.06

16-Oct-14

W:
H:
R:
S:

AIR CONDITIONER (A.C)

a)

14

Verifing Document

Date/Sign

SANITARY EQUIPMENT INSTALLATION

a)

13

Frequency

Date/Sign

WATER PROOFING

a)

12

Methode of
Inspection

Date/Sign

FIRE PROTECTION EQUIPMENT INSTALLATION

a)

11

Charateristic to be
Verified/Inspected/Tested

Acceptance
Criteria/Reference
Document

Installation check

FIXTURE AND HARDWARE

a)

Installation check

Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt

Name : Amir GJ Tarigan / FQM

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date:

Date:

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Identification

Involvement & Signature

ERECTION OF STEEL STRUCTURE (1/1)

Sub-Contractor

Contractor

OWNER
Remarks

Activity
No.

VII

Inspection/ Test Activity Item

MATERIAL RECEIVING INSPECTION

INSTALLATION OF STEEL STRUCTURE


a)

Foundation Released and Embeded


items

b) Pad elevation
c)

Erection Inspection (incl.Grating,


starway, platform, handrail, etc.)

d) Bolting tightening
e) Grouting

Date/Sign

Acceptance
Criteria/Reference
Document

Verifing Document

Correct material and Appearance

Visual

Each Receiving

Specification and
Code

QI - G.07a

Hand Over Notice

Review

100%

AFC Drawings

QI-S.0.04

Level

Visual

100%

AFC Drawings

QI-C.3.02

Orientation, aligment, verticality,


heigth, no temporary support.
Required Torque Value

Visual

As specified

AFC Drawings

QI-C.3.02

Type of material & Appearance


(crack, thickness)

Visual

100%

AFC Drawings

QI-C.3.02

Completeness as per drawing


(Sealent,drain pipe, gutter,
ventilation, etc)

Visual

Random

AFC Drawings

QI-C.5.01

Visual

100%

AFC Drawings

QI-C.3.02

ROOFING AND SIDING


a)

Date/Sign

Frequency

ERECTION OF STEEL STRUCTURE

Date/Sign

Methode of
Inspection

Charateristic to be
Verified/Inspected/Tested

Final Visual Inspection

PAINTING

Prepared by (Contractor)

Approved by (Contractor)

Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

I: RFI, mandatory inspection and repprt


16-Oct-14

Name : Amir GJ Tarigan / FQM

W:
H:
R:
S:

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date:

Date:

Date:

MHI-APEX-REKIND
QA/QC

Inspection and Test Plan For Civil, Structural & Architectural Work

Form. No

Rev.No.

QI - G-08

SAMUR PROJECT

Commodity

HC-T-&C/2010/0008

Activity
No.

VIII
1
2

Inspection/ Test Activity Item

Involvement & Signature


Sub-Contractor

Methode of
Inspection

Frequency

Acceptance
Criteria/Reference
Document

Verifing Document

Correct material and


Appearance

Visual

Each Receiving

Specification and
Code

QI - G.07a

As specified on project specs

Test

As specified

Construction specs

Coordinate and alignment

Survey

As specified

AFC Drawings

As specified on project specs

Review

each Mix
Design

Level /Compaction (Sub-grade,


sub base, base)

Visual & Test

Filler , Sealent

Contractor

Date/Sign

OWNER

Date/Sign

Remarks

Date/Sign

ROAD WORK
MATERIAL RECEIVING INSPECTION

Ws

Ws

PREPARATION
a)

Material Test for chemical organic

b)

Survey Work

c)
3

Identification

ROAD WORK (1/1)


Charateristic to be
Verified/Inspected/Tested

6-Aug-14

Pages.:

ITP Sheet No.6419R A437-00001


Project No.

Date

Mix Design and trial mix of asphalt

Sub-cont. report
QI-S.0.01 &

AFC Drawings

S.0.02
Sub-cont. report

As specified

PTS 34.13.20.31

QI-C.0.03

Visual

100%

AFC Drawings

QI-C.5.10

QI-

INSTALLATION
a)

Compaction

b)

Sweeping / blowing debris

c)

Primer coat

Condition

Visual

Each spraid

AFC Drawings

QI-C.5.10

d)

Tack coat

Condition

Visual

Each spraid

AFC Drawings

QI-C.5.10

e)

Bituminous macadam layers

Thickness

Dimensional

Each layer

AFC Drawings

QI-C.5.10

f)

Construction joint

Filler , Sealent

Visual

100%

AFC Drawings

QI-C.5.10
QI-S.0.01 &

g)

Final Survey Work

Final Level

Survey

As specified

AFC Drawings

h)

Final Check of Road

Prepared by (Contractor)

Level / Slope
Approved by (Contractor)

Visual

100%

AFC Drawings
Rev.No:

Date:

8
Name : Yudha Kristanto / QC Engineer

QIS.0.02
QI-C.5.10

I: RFI, mandatory inspection and repprt

16-Oct-14

Name : Amir GJ Tarigan / FQM

W:
H:
R:
S:

RFI, option inspection and as report


RFI, mandatory inspection and as report
No RFI, No inspection and review/sign report
No RFI, monitoring works and no sign report

Certified Complete (Contractor-PM/CM)

Authorization (FQM-REKIND/APEX)

Authorization (FQM-MHI)

Date: