MATERIAL PURCHASE
QUALITY CONTROL
SITE INSTALLATION
ASSISTANCE
DRAWING &
DESIGN APPROVAL
BY CLIENT
Rev 1.2013
With referenced to Clients project specific requirement and related Standard applied . All
design & drawing & material submitted to client for review & approval , Any correction made
re-submit for approval by client.
Production , FAT & SAT will all be based on this approval.
Hvac production calculation base on ARI , ASHRAE , SMACNA and NEC standard.
Design & drawing included but not limited to :
1. General layout
2. Data sheet
3. Specification
4. Block diagram
5. P&ID diagram
6. Hvac Design calculation
7. Fresh air transit Vs Gas damper closing calculation
8. Load calculation
9. Cable schedule
10. Hvac design drawing
11. Electrical diagram
12. Control Panel drawing
13. PLC Ladder logic development & Listing
14. Utility consumption / Load list
15. Grounding system planning
16. Material take off
17. Inspection Test Plan
18. Factory acceptance procedure
19. Operation manual book
MATERIAL PURCHASE
Material involved in the project purchaced through local authorized agent if any , or direct
imported from manufacturer.
All material strictly comply to type number / catalog number / specification as said in the
approval document, and brand new.
A copy of un-priced order may be available for client reference only.
Depend , some material duty may be payed by Client or included in the contract.
MATERIAL RECEIVING &
DOCUMENTED
Rev 1.2013
Cables , Lug
Electrical components ( breaker , magnetic contactor , relay etc )
Insulation material
Coating material
Box
ETC
Quality check apply for packaging condition , appearance. Although rare , Cracks /
moisture / dirt found may be subjected to rejection for particular material , and report is
made and documented.
Material received checked for Type no / Part no / Specs , of which must be exactly the same
as stated in Purchase Order. Any deviation will be rejected. We apply zero tolerance for
material quality impair.
Substitue is not allowed.
Certificate & manual are documented.
Rev 1.2013
DESCRIPTION
Record Time :
- Start record
- Stop record
Electrical consumption ( Ampere )
AHU A
TAG NO.FP-HVAC000A
AHU B
TAG NO. FP-HVAC000B
- Compressor ( A )
- Motor Fan #1 ( A )
- Motor Blower ( A )
- Press Fan motor ( A )
Refrigerant side
- Suction Pressure (Psig)
- Discharge Pressure (Psig)
Air Side Condenser
- Face Area Fan ( m2 )
- Velocity ( m/s )
- Ambient Temp ( o CDB )
- Output Air Temp ( o CDB )
- T Condenser ( o C )
Noise level ( dB ) 3 m from unit
Rev 1.2013
Record is compare to equipment data sheet. Normally capacity used maximum not
exceeding 80% of maximum equipment rated load.
Output data / air flow / temp / pressure must meet design parameter criteria. Any anomalies
is corrected / adjusted.
Hvac capacity recorded with the following ASHRAE Chart as :
Rev 1.2013
PH Enthalpy diagram
MANUFACTURE QUALITY PLAN
Rev 1.2013
COP
MANUFACTURE QUALITY PLAN
Rev 1.2013
Rev 1.2013
DESCRIPTION
COMPRESSOR
MOTOR
BLOWER
MOTOR
FAN
MOTOR
PRESS FAN
T1-T2 ( ohm )
T1-T3 ( ohm )
T2-T3 ( ohm )
2
Insulation test
MEGGER 500 Volt
T1 GND ( M Ohm )
T2 GND ( M Ohm )
T3 GND ( M Ohm )
Note:
DOCUMENT PREPARATION
FOR
FAT & DELIVERY
Preparation for Factory Acceptance Test or FAT based on the project document above.
Records and Measurement are prepared for FAT.
MANUFACTURE QUALITY PLAN
Rev 1.2013
FAT test is intended to proof that the finish factory product has meet or exceed the design
requirement.
Test may be include :
- Dimensional check
- Functional check
- Air flow
- Temperature ouput
- Humidity
- Pressure
- Cooling capacity & COP
- Response of gas damper
- Backup scheme
- Alarm handling
- Alarm logging & print out
- Interface operability with other system
- Leak test
Certification by third party certification institution available upon request by contract.
Such as:
- Sucofindo
- BKI ( Biro Klasifikasi Indonesia )
- Surveyor Indonesia
SITE INSTALLATION
ASSISTANCE
& TRAINING and
DOCUMENTATION
Our site engineer is available for installation or supervision , to ensure that all engineering
aspect is meet. This include mobilisation on-site , un-packing , installation , testing and
commissioning.
Training for operation & maintenance staff for Client to ensure the System is understood and
easyly and safely operated and maintained beyond installation.
Whether it is electro-mechanical or PLC based system , instruction is clearly written and
explain to operation staff.
A operation manual of the system is provided.
All documents included technical manual ( softcopy and print out ) is provided.
Notes :
Rev 1.2013