You are on page 1of 9

Asian Development Bank Assisted North Karnataka Urban Sector Investment

Programme
Approval / Sanction Certificate Detailed Project Report
(including plans & estimates)
Part A
Division: Gulbarga
Contract Title:
Sector / Component: Water supply improvement works
Implementing Agency: Urban Local Body Bidar
Name of the Program Consultant: M/s. Haskoning DHV Consulting Private Limited

Part B
I) Consultants Certification:
The above detailed project report as been prepared after detailed investigation and reviewed in
accordance with established procedure / framework / norms as well as ToR and contents for
such a project and submitted for further processing. It is certified that the plan and estimate of
the above work has been prepared and reviewed technically & financially and the estimated
cost works out to Rs. One Hundred and Three Crores and Twenty Nine Lakhs only based
on the CSR of PWD/NH/ KUWSDB or / and market rate and (Twenty Nine Crores and Forty
Lakhs Only for Civil Works and Rs. Seventy Three Crores and Eighty Nine Lakhs for
O&M for Five years.
Signature :

Date :

Name :
Title: Team Leader, (M/s. Haskoning DHV Consulting Pvt. Ltd. Gulbarga)
II) Implementing Agencys Acceptance:
The above detailed project report has been examined with respect to our requirements of the
sector, town and accepted in total.
Signature:

Date:

Signature:

Date:

Name:

Name:

Title: Executive Engineer / AEE

Title: Commissioner / Chief Officer

IA: (NKUSIP, Bidar)

IA: (City Municipal council, Bidar)

i of ix

III.Divisional Office, KUIDFC,Gulbarga:


The above concept report has been verified in accordance with the established procedure,
scope of work as per ToR and recommended for approval.

Signature:

Date:

Signature:

Name:

Name:

Dy.Project Director
NKUSIP, Badepur Stage I, Block I
Veerendra Patil Layout
Sedam Road, Gulbarga

Executive Engineer
NKUSIP KUIDFC,
CMC (Cell)
Bidar

Date:

IV. Regional Office, KUIDFC, Hubli Dharwad:


The above Detailed Project Report has been verified in acceptable form. Hence, approval has
been accorded.
Signature:

Date:

Name:
Chief Engineer
KUIDFC, RO Office
2nd Floor, B-Block
IT Park, Near Old Bus Stand
Hubli- 580029

ii of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga

Name of Work: Detailed Project Report for


Providing 24 X 7 Water supply in Bidar

Doc. No.

Rev. No.

Pages

Months issued :

CHECK LIST
Prepared by
(Signature with name)

Checked by
(Signature with name)

Approved by
(Signature with name)

Design Engineer

Deputy Team Leader

Team Leader

iii of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT

Name of Work: Detailed Project Report for


Providing 24 X 7 Water supply in Bidar

1) Face Sheet:-Enclosed
2) Abstract Sheet:- Enclosed
3) Detail Project Report:- Enclosed
4) Measurement Sheet:- Enclosed
5) Rate Analysis :- Enclosed
6) Certificates :- Working Area Certificate: - Enclosed
Scrutiny certificate at Division office:- Enclosed
Copy of ULB Resolutions - Enclosed
Drawings:Schematic Drawing of Bidar Water Supply Enclosed
Network Analysis drawings Enclosed
Good for Construction Drawings - enclosed

Team Leader
Programme Consultant
M/s. Haskoning DHV
Consulting Pvt. Ltd.
Gulbarga

Assistant Executive Engineer


NKUSIP Cell
Bidar

Executive Engineer,
NKUSIP KUIDFC,
CMC (Cell),
Bidar

iv of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Providing 24 X 7 Water supply in Bidar
FACE SHEET

NKUSIP Division

Gulbarga

NKUSIP Cell

Bidar

Head of Account

Detailed Project Report for Providing 24 X 7 Water


supply in Bidar

Estimate framed in the Office of the NKUSIP Division Gulbarga for the probable cost that will be
incurred in carrying out the work of Providing 24 X 7 water supply in Bidar.
Estimated Cost

Rs.103.29 Crores
Civil Works Rs. 29.40 Crores
O&M Five Years 73.89 Crores

Estimate Prepared By

M/s Haskoning DHV Consulting Pvt. Ltd.

Estimate Checked by

Mr. Lakshmi Kumar A, Team Leader

v of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for
Providing 24 X 7 Water supply in Bidar

WORKING AREA CERTIFICATE


This is to certify that
1. The working area for Proposed 24 X 7 Water supply for Bidar City is clear of
encroachments.
2. There are no requirements of shifting of utilities such as over head telephone cables
and Electrical lines

Team Leader
Programme Consultant.
M/s Haskoning DHV Consulting Pvt. Ltd.,
Package No.- III
Gulbarga

NKUSIP Cell Engineer


Asst Executive Engineer
Bidar

ULB Engineer
Asst. Executive Engineer
CMC, Bidar

Municipal Commissioner,
CMC, Bidar

vi of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for
Providing 24 X 7 Water supply in Bidar
SCRUITINY CERTIFICATE

Certified that the estimate for the proposed work is duly scrutinized in this office with reference to
current S.R. of KUWS&DB/PWD/Electrical/KPTCL and for the rates which are not found in the S.R.
the lowest quotation rates obtained from market and approved are adopted.

Team Leader
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package No.-III
Gulbarga

Assistant Executive Engineer


NKUSIP Cell
Bidar

Executive Engineer,
NKUSIP KUIDFC,
CMC (Cell)
Bidar

vii of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
Name of Work: Detailed Project Report for
Providing 24 X 7 Water supply in Bidar

CERTIFICATE
There are no major deviations / violation from the NKUSIP design parameters There is no overlap with
the NKUSIP works.

C.S.S
M/s. Haskoning DHV
Consulting Pvt. Ltd.
Bidar

Assistant Executive
Engineer
NKUSIP Cell
Bidar

Team Leader
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Executive Engineer,
NKUSIP KUIDFC,
CMC (Cell)
Bidar

viii of ix

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT

Name of Work: Detailed Project Report for


Providing 24 X 7 Water supply in Bidar

PROJECT CONSULTANT CERTIFICATE

Certified that the Provided designs, Plans, Estimates and other Provisions provided in the DPR are
adequate
a) To Provide continuous Water supply with a minimum of 7 m residual pressure at consumer end.
b) Zoning and sub-zoning provide is adequate to isolate the minimum possible connections being
affected.
c) It will be possible to measure the performance of the operator with reference to Performance
Targets.

Design Engineer
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Deputy Team Leader


Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Team Leader
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

ix of ix