You are on page 1of 8

Asian Development Bank Assisted North Karnataka Urban Sector Investment

Programme
Approval / Sanction Certificate Detailed Project Report
(including plans & estimates)
Part A
Division: Gulbarga
Contract Title:
Sector / Component: Tourism Development works in Gulbarga City.
Implementing Agency: Urban Local Body, Gulbarga
Name of the Program Consultant: Haskoning DHV Consulting Private Limited

Part B
I) Consultants Certification:
The above detailed project report as been prepared after detailed investigation and reviewed in
accordance with established procedure / framework / norms as well as ToR and contents for
such a project and submitted for further processing. It is certified that the plan and estimate of
the above work has been prepared and reviewed technically & financially and the estimated
cost works out to Rs. One Crores and Sixty Three Lakhs Only based on the CSR of PWD.
Signature :

Date :

Name :
Title: Team Leader, (M/s. Haskoning DHV Consulting Pvt. Ltd. Gulbarga)
II) Implementing Agencys Acceptance:
The above detailed project report has been examined with respect to our requirements of the
sector, town and accepted in total.
Signature:

Date:

Signature:

Date:

Name:

Name:

Title: Executive Engineer / AEE

Title: Commissioner / Chief Officer

IA: (NKUSIP, Gulbarga)

IA: (Manahanagara Palike, Gulbarga)

i of viii

III.Divisional Office, KUIDFC, Gulbarga:


The above concept report has been verified in accordance with the established procedure,
scope of work as per ToR and recommended for approval.

Signature:

Date:

Signature:

Date:

Name:

Name:

Dy.Project Director

Executive Engineer

NKUSIP, Badepur Stage I, Block I

NKUSIP, Badepur Stage I, Block I

Veerendra Patil Layout

Veerendra Patil Layout

Sedam Road, Gulbarga

Sedam Road, Gulbarga

IV. Regional Office, KUIDFC, Hubli Dharwad:


The above Detailed Project Report has been verified in acceptable form. Hence, approval has
been accorded.
Signature:

Date:

Name:
Chief Engineer
KUIDFC, RO Office
2nd Floor, B-Block
IT Park, Near Old Bus Stand
Hubli- 580029

ii of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga

Name of Work: Detailed Project Report for


Tourism Development works in Gulbarga City.

Doc. No.

Rev. No.

Pages

Months issued :

CHECK LIST
Prepared by
(Signature with name)

Checked by
(Signature with name)

Approved by
(Signature with name)

Design Engineer

Deputy Team Leader

.
Team Leader

iii of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Detailed Project Report for
Tourism Development works in Gulbarga City.

1) Face Sheet:-Enclosed
2) Abstract Sheet:- Enclosed
3) Detail Project Report:- Enclosed
4) Measurement Sheet:- Enclosed
5) Rate Analysis :- Enclosed
6) Certificates :- Scrutiny certificate at Division office:- Enclosed
Copy of ULB Resolutions - Enclosed
Drawings:1. Plan and Elevation of Toilet Block and Kitchen Block at Gulbarga
2. Structural Drawings of Toilet Block and Kitchen Block at Gulbarga
3. Electrical Drawings of Toilet Block and Kitchen Block at Gulbarga.

Team Leader
Programme Consultant
M/s. Haskoning DHV
Consulting Pvt. Ltd.
Gulbarga

Assistant Executive Engineer


NKUSIP Cell
Gulbarga

Executive Engineer,
NKUSIP KUIDFC,
Gulbarga Division
Gulbarga

iv of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Tourism Development works in Gulbarga City.

FACE SHEET

NKUSIP Division

Gulbarga

NKUSIP Cell

Gulbarga

Head of Account

Detailed Project Report for Tourism Development


works in Gulbarga City.

Estimate framed in the Office of the NKUSIP Division Gulbarga for the probable cost that will be
incurred in carrying out the work of Tourism Development works in Gulbarga City..
Estimated Cost

Rs.1.63 Crores

Estimate Prepared By

M/s Haskoning DHV Consulting Pvt. Ltd..,

Estimate Checked by

Mr. Lakshmi Kumar A, Team Leader

v of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Tourism Development works in Gulbarga City.
SCRUITINY CERTIFICATE

Certified that the estimate for the proposed work is duly scrutinized in this office with reference to
current S.R. of PWD/Electrical and KPTCL are adopted.

Team Leader
Programme Consultant
M/s. Haskoning DHV
Consulting Pvt. Ltd.
Gulbarga

Assistant Executive Engineer


NKUSIP Cell
Gulbarga

Executive Engineer,
NKUSIP KUIDFC,
Gulbarga Division
Gulbarga

vi of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT
Name of Work: Tourism Development works in Gulbarga City.

CERTIFICATE
There are no major deviations / violation from the NKUSIP design parameters There is no overlap with
the NKUSIP works.

C.S.S
M/s. Haskoning DHV
Consulting Pvt. Ltd.
Gulbarga

Assistant Executive
Engineer
NKUSIP Cell
Gulbarga

Team Leader
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Executive Engineer,
NKUSIP KUIDFC,
Gulbarga Division
Gulbarga

vii of viii

Consultancy Service for NKUSIP under ADB assisted


Programme Package-III, Gulbarga
DETAIL PROJECT REPORT

Name of Work: Tourism Development works in Gulbarga City.

PROJECT CONSULTANT CERTIFICATE

Certified that the Provided designs, Plans, Estimates and other Provisions provided in the DPR are
adequate.

Design Engineer
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Deputy Team Leader


Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

Team Leader
Programme Consultant
M/s Haskoning DHV
Consulting Pvt. Ltd
Package.-III
Gulbarga

viii of viii