Description
Sub - Estimate Construction of Toilet Block Building and Dining Hall at Dargah
-1
Hazarath Khwaja Banda Nawaz (Rh), Gulbarga.
Amount in Rs.
Amount in
Crores
14038273.27
1.40
Sub - Estimate Water Supply and Sanitation for Toilet and Kitchen Block at
-2
Dargah Hazarath Khwaja Banda Nawaz (RH) at Gulbarga.
1789564.98
0.18
439177.00
0.04
16267015.24
1.63
Grand Total
SUB ESTIMATE 1 :-Construction of Toilet Block Building and Dining Hall at Dargah Hazarath Khwaja
(Rh), Gulbarga.
Sl.
Particulars of work
No
1 Surface EXCIVATION
No
L (m)
B (m)
D (m)
Qty
Unit
43.00
24
0.15
154.80
Cum
4
9
18
6
18
9
1.50
1.50
1.50
1.50
1.80
1.80
1.50
1.50
1.20
1.50
1.80
1.80
2.00
2.00
2.00
2.00
2.00
2.00
18.00
40.50
64.80
27.00
116.64
58.32
325.26
Cum
1.35
3.04
4.86
2.03
8.75
4.37
24.39
Cum
EXCAVATION
KSRB
2-2.2 Earthwork excavation for foundation of
buildings, watersupply , sanitary lines & electrical conduits
either in pits or in trenches 1.5 m & above in width, in
hard soil not exceeding 1.5 m in depth including dressing
the bottom & sides of pits & trenches, starting the
excavated soil clear from edges of excavation with lead
upto 50 m after breaking the clods with all lead and lift,
including cost and conveyance of all materials, labour, all
other incidental charges etc., complete as per
specification and as directed by the Engineer-in-charge of
work.
(PW,P & IWTD,Gulbarga circle Gulbarga Circle 2013-14 P-5
i-2.4)
For Pits
Footing F1
Footing F2
Footing F3
Footing F4
Footing F5
Footing F6
P.C.C 1:3:6
KSRB 4-1.3: Providing and laying in position plain cement
concrete of nominal mix M7.5 with OPC cement @ 180 Kg
with 40 mm and down size graded granite metal coarse
aggregates @ 0.85 cum and fine aggregates @ 0.57 cum
machine mixed, concrete laid in layers not exceeding 15
cms thick well compacted in foundation and plinth
including cost of all materials, labour, HOM of machinery,
curing, complete as per specification (PWP & IWTD DSR,
Glb. 2013-14 P.No. 12 I.No. 4.3)
For Pits
Footing
Footing
Footing
Footing
Footing
Footing
F1
F2
F3
F4
F5
F6
4
KSRB 4.2.9: Providing and laying in position reinforced
cement concrete of mix M20 with OPC cement @ 320 Kgs
with 20 mm and down size graded graite metal coarse
aggregates @ 0.69 cum and fine aggregates at 0.46 cum,
machine mixed concrete laid in layers not exceeding 15
cms thick vibrated for RCC beams, columns of all sizes in
foundation plinth and super structure ground floor level for
roof slabs, staircase, lintels, columns including cost of all
materials, labour, HOM of machinery, curing complete as
per specification (PWP & IWTD DSR Glb. 2013.14 P.No. 15
I.No. 4.17)
4
9
18
6
18
9
1.50
1.50
1.50
1.50
1.80
1.80
1.50
1.50
1.20
1.50
1.80
1.80
0.15
0.15
0.15
0.15
0.15
0.15
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Footing F1
1.20
1.20
0.25
1.44
Footing F2
1.20
1.20
0.25
3.24
Footing F3
18
1.20
0.90
0.25
4.86
Footing F4
1.20
1.20
0.30
2.59
Footing F5
18
1.50
1.50
0.30
12.15
Footing F6
1.50
1.50
0.30
6.08
Footing F1
0.72
0.72
0.20
0.41
Footing F2
0.72
0.72
0.35
1.61
Footing F3
18
0.72
0.57
0.35
2.55
Footing F4
0.72
0.72
0.30
0.92
Footing F5
18
0.87
0.87
0.30
4.04
Footing F6
0.87
0.87
0.30
2.02
Footings
Conical Shape
41.90
0.23
0.45
4.90
2.03
C2
0.23
0.45
4.75
4.42
C3
18
0.23
0.45
4.75
8.85
C4
0.23
0.60
4.80
3.97
C5
18
0.23
0.60
4.80
11.92
C6
0.23
0.60
4.80
5.96
37.16
Plinth Beam
PB1 Front Full Length
37.93
0.23
0.30
2.62
PB1
16.61
0.23
0.30
1.15
PB1
14.58
0.23
0.30
1.01
PB1
5.82
0.23
0.30
0.40
PB1
4.00
0.23
0.30
0.28
PB1
22.19
0.23
0.30
3.06
PB1
22.41
0.23
0.30
1.55
PB1
8.14
0.23
0.30
0.56
PB1
4.87
0.23
0.30
0.34
PB1
2.59
0.23
0.30
0.18
PB1
4.20
0.23
0.30
0.29
PB1
2.23
0.23
0.30
0.15
PB1
8.00
0.23
0.30
0.55
PB1
3.00
0.23
0.30
0.21
PB1
3.30
0.23
0.30
0.23
PB1
17.52
0.23
0.30
1.21
PB1
3.78
0.23
0.30
0.26
PB1
6.94
0.23
0.30
0.48
PB1
6.63
0.23
0.30
0.46
PB2
8.35
0.23
0.30
3.46
PB2
4.30
0.23
0.30
0.30
PB2
3.00
0.23
0.30
0.21
PB2
2.44
0.23
0.30
0.34
PB3
3.00
0.23
0.38
0.26
PB3
5.12
0.23
0.38
0.45
PB3
5.73
0.23
0.38
0.50
PB3
5.38
0.23
0.38
0.47
PB3
4.06
0.23
0.38
0.35
PB3
4.28
0.23
0.38
0.37
Unit
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
PB3
5.37
0.23
0.38
0.47
PB4
5.88
0.23
0.45
2.43
Unit
24.58
Roof Beam
B1
14.52
0.23
0.45
1.50
B1
22.41
0.23
0.45
6.96
B1
9.41
0.23
0.45
0.97
B1
17.81
0.23
0.45
1.84
B1
13.15
0.23
0.45
1.36
B1
8.70
0.23
0.45
0.90
B1
10.46
0.23
0.45
1.08
B1
2.61
0.23
0.45
0.27
B1
3.46
0.23
0.45
0.36
B1
6.93
0.23
0.45
0.72
B1
2.83
0.23
0.45
0.29
B2
14.75
0.23
0.45
1.53
B2
15.04
0.23
0.45
1.56
B2
4.13
0.23
0.45
0.43
B2
2.82
0.23
0.45
0.29
B2
4.07
0.23
0.45
0.42
B2
4.49
0.23
0.45
0.46
B2
3.23
0.23
0.45
0.33
B2
5.47
0.23
0.45
0.57
B3
8.12
0.23
0.45
1.68
B3
10
4.76
0.23
0.45
4.93
B3
5.84
0.23
0.45
0.60
B3
5.25
0.23
0.45
2.72
B3
5.26
0.23
0.45
0.54
B4
6.93
0.23
0.60
3.83
B4
6.60
0.23
0.60
1.82
37.97
Roof Slab
For Gents Toilet
22.89
9.78
0.15
33.58
22.89
4.27
0.15
14.66
19.74
2.84
0.15
8.41
7.12
4.80
0.15
5.13
2.74
2.82
0.15
1.16
6.58
3.23
0.15
3.19
Passage
20.11
3.00
0.15
9.05
Passage
2.23
3.60
0.15
1.20
Cooking Hall
14.60
4.30
0.15
9.42
Cooking Hall
4.30
6.50
0.15
4.19
Store Room
4.12
2.82
0.15
1.74
Stair Case
5.33
2.92
0.15
2.33
94.06
235.68
0.23
0.45
5.16
2.14
C2
0.23
0.45
5.16
4.81
C3
18
0.23
0.45
5.16
9.61
C4
0.23
0.6
5.16
4.27
Cum
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
C5
18
0.23
0.6
5.16
12.82
C6
0.23
0.6
5.16
6.41
Unit
40.05
Roof Beam
B1
14.52
0.23
0.45
1.50
B1
22.41
0.23
0.45
6.96
B1
9.41
0.23
0.45
0.97
B1
17.81
0.23
0.45
1.84
B1
13.15
0.23
0.45
1.36
B1
8.7
0.23
0.45
0.90
B1
10.46
0.23
0.45
1.08
B1
2.61
0.23
0.45
0.27
B1
3.46
0.23
0.45
0.36
B1
6.93
0.23
0.45
0.72
B1
2.83
0.23
0.45
0.29
B2
14.75
0.23
0.45
1.53
B2
15.04
0.23
0.45
1.56
B2
4.13
0.23
0.45
0.43
B2
2.82
0.23
0.45
0.29
B2
4.07
0.23
0.45
0.42
B2
4.49
0.23
0.45
0.46
B2
3.23
0.23
0.45
0.33
B2
5.47
0.23
0.45
0.57
B3
8.12
0.23
0.45
1.68
B3
10
4.76
0.23
0.45
4.93
B3
5.84
0.23
0.45
0.60
B3
5.25
0.23
0.45
2.72
B3
5.26
0.23
0.45
0.54
B4
6.93
0.23
0.6
3.83
B4
6.6
0.23
0.6
1.82
37.97
Roof Slab
22.89
9.78
0.15
33.58
22.89
4.27
0.15
14.66
19.74
2.84
0.15
8.41
7.12
4.8
0.15
5.13
2.74
2.82
0.15
1.16
6.58
3.23
0.15
3.19
Passage
20.11
0.15
9.05
Passage
2.23
3.6
0.15
1.20
Cooking Hall
14.6
4.3
0.15
9.42
Cooking Hall
4.3
6.5
0.15
4.19
Store Room
4.12
2.82
0.15
1.74
Stair Case
5.33
2.92
0.15
2.33
94.06
172.09
Fillinga
KSRB 2.3 : Filling available excavated earth (excluding
rock) in sides of foundations upto plinth in layers not
exceeding 20 cms. in depth, compacting each deposited
layer by ramming after watering with lead upto 50m. and
lift upto 1.5m. including cost of all labour complete as per
specifications.
(PW,P & IWTD,Gulbarga circle Gulbarga. 2013-14 It. No.
2.10, P. No. 6)
For Gents Toilet
22.89
9.78
0.45
100.74
Cum
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
22.89
4.27
0.45
43.98
19.74
2.84
0.45
25.23
7.12
4.8
0.45
15.38
2.74
2.82
0.45
3.48
6.58
3.23
0.45
9.56
Passage
20.11
0.45
27.15
Passage
2.23
3.6
0.45
3.61
Cooking Hall
14.6
4.3
0.45
28.25
Cooking Hall
4.3
6.5
0.45
12.58
Store Room
4.12
2.82
0.45
5.23
275.19
Total Qty
6
Unit
Cum
BBM in CM 1:6
KSRB 6-2.3 Providing and constructing burnt brick
masonary with approved quality of non modular bricks of
standard size of class designation 50(table moulded) with
cement mortar 1:6 for basement and super structure
including
cost
of
materials.labours
charges,
scaffolding,curing complete as per specification No KBS
6.3
(PW,P & IWTD,Gulbarga circle Gulbarga. 2013-14 It. No.
6.6 P. No30)
Outer Wall Full Length
140.64
0.23
3.20
103.51
Inner Wall
22.38
0.23
3.20
32.94
Inner Wall
9.46
0.23
3.20
6.96
Inner Wall
4.30
0.23
3.20
12.66
Inner Wall
1.52
0.23
3.20
1.12
Gate
3.00
0.23
3.20
-2.21
Door D1
1.20
0.23
2.10
-2.32
Door D2
1.50
0.23
2.10
-1.45
Ventilatar
16
3.00
0.23
0.60
-6.62
140.64
0.23
3.2
103.51
Inner Wall
22.38
0.23
3.2
32.94
Inner Wall
9.46
0.23
3.2
6.96
Inner Wall
4.3
0.23
3.2
12.66
Inner Wall
1.52
0.23
3.2
1.12
1.20
0.23
2.10
-2.32
Door D2
1.50
0.23
2.10
-1.45
Ventilatar
16
3.00
0.23
0.60
-6.62
140.64
0.23
Deduction of Opening
144.60
Net Qty
Cum
Deduction of Opening
Door D1
Net Qty
0.75
146.80
Cum
24.26
Cum
TMT steel
235.68
23567.65
Kgs
172.09
17208.84
Kgs
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
Total
40776.49
Kgs
400776.49/100
407.76
Qtl
Centering Charges
A
KSRB 4-6.1 : Providing and removing centering, shuttering,
strutting, propping etc., and removal of form work for foundations,
footings, bases of columns for mass concrete including cost of all
materials, abour complete as per specifications. Specification No.
KBS
specification No. KBS 4.6.2(PWD DSR 2013-14 It.No.4.28,
P.No.16
For Footing
Footing F1
1.20
1.20
0.25
1.44
Footing F2
1.20
1.20
0.25
3.24
Footing F3
18
1.20
0.90
0.25
4.86
Footing F4
1.20
1.20
0.30
2.59
Footing F5
18
1.50
1.50
0.30
12.15
Footing F6
1.50
1.50
0.30
6.08
30.36
Sqm
0.23
0.45
4.90
2.03
C2
0.23
0.45
4.75
4.42
C3
18
0.23
0.45
4.75
8.85
C4
0.23
0.60
4.80
3.97
C5
18
0.23
0.60
4.80
11.92
C6
0.23
0.60
4.80
5.96
37.16
Sqm
For Coloumn First Floor ( Additional rate Rs. 20 Shall be added for
every additional meter or part there of for the above limits.
C1
0.23
0.45
5.16
2.14
C2
0.23
0.45
5.16
4.81
C3
18
0.23
0.45
5.16
9.61
C4
0.23
0.6
5.16
4.27
C5
18
0.23
0.6
5.16
12.82
C6
0.23
0.6
5.16
6.41
40.05
Sqm
279.21
0.83
231.74
PB3 (0.38+0.23+0.38)=0.99
32.94
0.99
32.61
PB4 (0.45+0.23+0.45)=1.13
23.52
1.13
26.58
290.93
Sqm
Roof Beam
RB1, RB2, RB3
304.18
1.13
RB4
40.92
1.43
343.72
58.52
402.24
Sqm
Sl.
No
Particulars of work
No
L (m)
B (m)
304.18
1.13
RB4
40.92
1.43
D (m)
Qty
Unit
343.72
58.52
402.24
Sqm
22.89
9.78
223.86
22.89
4.27
97.74
19.74
2.84
56.06
7.12
4.80
34.18
2.74
2.82
7.73
6.58
3.23
21.25
Passage
20.11
3.00
60.33
Passage
2.23
3.60
8.03
Cooking Hall
14.60
4.30
62.78
Cooking Hall
4.30
6.50
27.95
Store Room
4.12
2.82
11.62
Stair Case
5.33
2.92
15.56
22.89
9.78
223.86
22.89
4.27
97.74
19.74
2.84
56.06
7.12
4.8
34.18
2.74
2.82
7.73
6.58
3.23
21.25
Passage
20.11
60.33
Passage
2.23
3.6
8.03
Cooking Hall
14.6
4.3
62.78
Cooking Hall
4.3
6.5
27.95
Store Room
4.12
2.82
11.62
Stair Case
5.33
2.92
627.09
15.56
627.09
Sqm
Partition Wall
KSRB 6-7.4 :Construction of Partition wall 11.2 cms thick with
non modular table moulded burnt bricks of class designation 50
with cement mortar 1:4 including cost of materials, labour charges,
scaffolding, curing with all lead and lift, including cost and
conveyance of all materials, labour, all other incidental charges
etc., complete as per specification and as directed by the
Engineer-in-charge of work.
(PWD DSR 2013-14 P-33 L-6.26)
For Toilet Block ( Gents) Main
6.20
2.13
26.41
24
2.00
2.13
102.24
10
2.00
2.13
42.60
For HWC
4.95
2.13
10.54
Urinals
1.30
2.13
16.61
13.42
2.13
28.58
16
2.00
2.13
68.16
1.33
2.13
2.83
18
1.90
3.13
107.05
1.90
4.13
47.08
14.58
1.20
17.50
7.77
1.20
9.32
Sqm
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
3.35
1.20
8.04
3.28
1.20
19.68
506.66
Unit
Sqm
6.2
2.13
26.41
24
2.13
102.24
10
2.13
42.60
For HWC
4.95
2.13
10.54
Urinals
1.3
2.13
16.61
13.42
2.13
28.58
16
2.13
68.16
1.33
2.13
2.83
18
1.9
3.13
107.05
1.9
4.13
47.08
Total Qty
452.12
Sqm
10 Grill Door
KSRB 7.1 : Providing and fixing in position collapsible steel
shuttures with single or double leaf with verticle
channel
20mmX10mmX2mm braced with flat iron diagonals 20mmX5mm
size, with top and bottam rails of T iron sections of 40X40X6mm
with 38mmdia steel pulleys complete with bolt and nuts, locking
arrangements, stoppers, handles on both sides with 7.5cms
openings at 10cms. c to c applying a priming coat of red lead
paint. cost of materials, labour, HOM of machinery complete as
per specifications.size of gate 2.4mX 1.40m Specification No. KBS
7.7/7.12
Specification No. KBS 7.7/7.12 (PWD DSR 2013-14 It No.7.1 P
No.36)
Main Door
3.00
3.20
28.80
sqm
1.50
2.90
17.40
Sqm
11
KSRB 7.17: Providing, fabricating, assembling and fixing in
position anodized aluminium doors using following aluminium mat
finish or glossy finish, outer frame plain section101.6x44.45mm
thickness 3.18mm, section weight 2.404 kg/m, door shutters
vertical section 44.62x44.45mm thickness 3.18mm, section weight
1.505klg/m, top section 47.62x44.45mm thickness 3.00 mm,
section weight 1.426kg/m bottom section 114.3x44.45 thickness
3.18mm, section weight 2.646kg/m door central section
49.91x44.45mm thickness 3.00mm, section weight 1.495 kg/m
glazing clips 19x17.3x11mm thickness 0.9mm section weight
0.124kg/m; aluminium sections anodized 12 to 15 microns cut to
length joint metred corners grinded, the shutters pivoted opening
arrangement with heavy duty aluminium alloy automatic door
closures floor mounted, providing and fixing standard approved
accessories, such as aluminium handle for full width or length,
tower bolts, lock, pivots PVC or rubber gasket with 5.5m thick plain
glass for top and bottom panel aluminium sections treated for
removal of any rust and prevetnion of further rust formation, and
coated with greasy materials for non adherence of mortars or any
other sticky materials; the
assembled frame fitted with the corner angles, strips and fitted
with screws, rawl plugs or teakwood gutties to R.C.C. columns or
masonry on sides beams and flooring in bottom including cutting,
chistling and making good with cement mortar to match the
surface; all the frames throughly cleaned free from rust, scale, or
dirt including cost of materials, fixtures, labour and HOM of
machinery complete as per specifications. (PWD DSR 07-08 It.
No. 7.17, P. No. 41)
Main Door
12 PROVIDING & FIXING DOOR FRAME
Sl.
12
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
35
5.60
0.1
0.08
1.47
50
5.60
0.1
0.08
2.10
41
5.60
0.1
0.08
1.72
41
5.60
0.1
0.08
Unit
1.72
7.01
cum
35
0.80
2.10
58.80
50
0.80
2.10
84.00
41
0.80
2.10
68.88
41
0.80
2.10
Total Qty
68.88
280.56
Sqm
28.80
28.80
Sqm
16
0.6
Sl.
No
15
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
KSRB 7.9 : Providing and fixing M.S. grill work of windows and
ventilators weighing 21 kg/sqm using M.S flats, or M.S. square
rods, or combination of M.S. flats and square rods as per
approved design, drawing including cutting steel sections and
welding the same to required pattern with a coat of red lead
primer, cost of materials, fixtures, labour and HOM of machinery
complete as per specifications. Specification No. KBS 7.12 (PWD
DSR 2013-14 It. No. 7.9, P. No. 37)
V
28.80
Total Qty
28.80
28.80 at 21kg/sqm
604.80
Kgs
140.64
3.2
450.05
Inner Wall
22.38
3.2
143.23
Inner Wall
9.46
3.2
30.27
Inner Wall
4.3
3.2
55.04
Inner Wall
1.52
3.2
4.86
Gate
3.2
-9.60
Door D1
1.2
2.1
-10.08
Door D2
1.5
2.1
-6.30
Ventilatar
16
Deduction of Opening
0.6
Net Qty
-28.80
628.68
140.64
3.2
450.05
Inner Wall
22.38
3.2
143.23
Inner Wall
9.46
3.2
30.27
Inner Wall
4.3
3.2
55.04
Inner Wall
1.52
3.2
4.86
Door D1
5.4
0.23
4.968
Door D2
5.7
0.23
2.622
Ventilatar
16
7.2
0.23
26.496
Deduction of Opening
Net Qty
717.54
140
0.75
1346.22
Sqm
105.00
Sqm
Sl.
No
17 Plaster Out side
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
140.64
Net Qty
140.64
Net Qty
3.2
140.46
0.75
450.048
450.048
450.048
450.048
900.10
105.35
Sqm
Sqm
1
1
Total Qty of Ground Floor & First Floor
1
3.2
22.89
9.78
0.10
22.39
22.89
4.27
0.10
9.77
19.74
2.84
0.10
5.61
7.12
4.8
0.10
3.42
2.74
2.82
0.10
0.77
6.58
3.23
0.10
2.13
Passage
20.11
0.10
6.03
Passage
2.23
3.6
0.10
0.80
Cooking Hall
14.6
4.3
0.10
6.28
Cooking Hall
4.3
6.5
0.10
2.80
Store Room
4.12
2.82
0.10
Deduction of WC
59
0.45
0.60
1.16
-15.93
45.22
19 vetrified tiles
Providing vitrified tiles 60 x 60cms of approved make, shade and
size for flooring laid on a bed of 12mm thick cement mortar 1:3
mix, flush pointing with white cement using colour pigment,
including cost of materials, labour, curing complete as per
specifications. (PWD DSR 2013-14 It. No. 14.45, P. No. 116
For Ground floor Ladies Toilet
196.32
107.00
98.86
75.21
196.32
107.00
98.86
75.21
954.78
Deduction
Partion Wall
For Toilet Block ( Gents) Main
6.2
0.115
-1.43
24
0.115
-5.52
10
0.115
-2.30
For HWC
4.95
0.115
-0.57
Cum
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Urinals
1.3
0.115
-0.90
13.42
0.115
-1.54
16
0.115
-3.68
1.33
0.115
-0.15
18
1.9
0.115
-3.93
1.9
0.115
-1.31
14.58
0.115
-1.68
7.77
0.115
-0.89
3.35
0.115
-0.77
3.28
0.115
-1.89
0.115
0.00
0.115
0.00
6.2
0.115
-1.43
24
0.115
-5.52
10
0.115
-2.30
For HWC
4.95
0.115
-0.57
Urinals
1.3
0.115
-0.90
13.42
0.115
-1.54
16
0.115
-3.68
1.33
0.115
-0.15
18
1.9
0.115
-3.93
1.9
0.115
-1.31
134
0.45
0.60
Total Qty
WC
Unit
-47.89
-36.18
870.71
Sqm
20
KSRB 14. 10-1 : Flooring with 25mm to 40mm thick polished
tandur blue stone slabs using cement mortar 1:6, 25mm thick over
existing cement concrete bed or top of roof laid to line and level
and jointed with cement slurry mixed with pigment to match the
shade of hte slab, including cost of materials, labour, curing,
polishing complete as per specifications. Specification No. KBS.
(PWD DSR 2013-14 It. No. 14.15, P. No. 112)
For Ground Floor - Cooking Hall
145.00
Sqm
145.00
Sqm
140.64
1.5
210.96
Inner Wall
22.38
1.5
67.14
Inner Wall
9.46
1.5
14.19
Inner Wall
4.3
1.5
25.80
Inner Wall
1.52
1.5
2.28
Gate
1.5
-4.50
Door D1
1.2
1.5
-7.20
Door D2
1.5
1.5
-4.50
140.64
1.5
210.96
Inner Wall
22.38
1.5
67.14
Inner Wall
9.46
1.5
14.19
Inner Wall
4.3
1.5
25.80
Inner Wall
1.52
1.5
2.28
Deduction of Opening
Deduction of Opening
304.17
Sl.
No
Particulars of work
No
L (m)
Door D1
Door D2
B (m)
D (m)
Qty
1.2
1.5
-7.20
1.5
1.5
-4.50
Unit
308.67
6.2
1.5
18.60
24
1.5
72.00
10
1.5
30.00
For HWC
4.95
1.5
7.43
Urinals
1.3
1.5
11.70
13.42
1.5
20.13
16
1.5
48.00
1.33
1.5
2.00
18
1.9
1.5
51.30
1.9
1.5
17.10
14.58
1.2
17.50
7.77
1.2
9.32
3.35
1.2
8.04
3.28
1.2
19.68
6.2
1.5
18.60
24
1.5
72.00
10
1.5
30.00
For HWC
4.95
1.5
7.43
Urinals
1.3
1.5
11.70
13.42
1.5
20.13
16
1.5
48.00
1.33
1.5
2.00
18
1.9
1.5
51.30
1.9
1.5
17.10
611.04
1223.88
Net Qty
22 O.B.D on ceiling & wall
KSRB 15-14.1 : Providing and applying two coats with oil bound
washable distemper of approved brand and shade on wall surface
including priming coat with distemper primer after throughly
brooming the surface free from mortar drops and other foreign
matter including preparing the surface even and sand paper
smooth, cost of materials, labour, complete as per specifications.
(PWD DSR 2013-14 It. No. 15.49.1, P. No. 126)
Outer Wall Full Length
140.64
1.7
239.09
Inner Wall
22.38
1.7
76.09
Inner Wall
9.46
1.7
16.08
Inner Wall
4.3
1.7
29.24
Inner Wall
1.52
1.7
2.58
363.09
140.64
1.7
239.09
Inner Wall
22.38
1.7
76.09
Inner Wall
9.46
1.7
16.08
Inner Wall
4.3
1.7
29.24
Inner Wall
1.52
1.7
2.58
363.09
6.2
0.63
7.81
24
0.63
30.24
10
0.63
12.60
For HWC
4.95
0.63
3.12
Sqm
Sl.
No
Particulars of work
No
L (m)
B (m)
D (m)
13.42
0.63
8.45
16
0.63
20.16
1.33
0.63
0.84
18
1.9
0.63
21.55
1.9
0.63
7.18
14.58
1.2
17.50
7.77
1.2
9.32
3.35
1.2
8.04
3.28
1.2
Qty
Unit
19.68
166.49
6.2
0.63
7.81
24
0.63
30.24
10
0.63
12.60
For HWC
4.95
0.63
3.12
13.42
0.63
8.45
16
0.63
20.16
1.33
0.63
0.84
18
1.9
0.63
21.55
1.9
0.63
7.18
111.95
For Celling
1254.18
Total Qty
2258.7986
Sqm
28.80
28.8
57.60
Sqm
1223.568
1223.57
23.00
Sqm
Each
23 Enamel Paint
KSRB 15-18.2 : Providing and applying enamel metal paint two
coats (exluding priming coat) over new steel or other metal
surface brushing to give an even shade after cleaning oil, graease,
dirt and other foreign matter, including cost of materials, labour,
complete as per specifications. (PWD DSR 2013-14 It. No. 15.74,
P. No. 130)
Main Door
V
3
16
3
3
3.2
0.6
1
23
140.64
8.7
Amount (Rs)
116.00
17956.80
209.00
67979.34
3877.00
94577.48
Rate (Rs)
Amount (Rs)
Rate (Rs)
Amount (Rs)
5071.00
1195115.56
Rate (Rs)
Amount (Rs)
5121.00
881264.47
Rate (Rs)
Amount (Rs)
93.9
25840.15
5194.00
751028.92
5219.00
766167.36
5219.00
126615.03
Rate (Rs)
Amount (Rs)
6846.00
2791558.23
197.00
5980.33
303.00
11259.99
403.00
16141.96
219.00
63714.22
219.00
88090.34
Rate (Rs)
Amount (Rs)
319.00
128314.24
257.00
161162.72
800.00
501673.84
Rate (Rs)
Amount (Rs)
697.00
353138.54
697.00
315124.16
4051.00
116668.80
5879.00
102294.60
Rate (Rs)
Amount (Rs)
81044.00
568442.62
3707.00
1040035.92
104003.59
3261
93916.80
Rate (Rs)
Amount (Rs)
89.49
54123.55
174.00
234241.93
174.00
18270.00
Rate (Rs)
Amount (Rs)
196.00
196.00
176418.82
20647.62
4098.00
185323.32
Rate (Rs)
Amount (Rs)
1115.00
970839.70
941.00
136445.00
941.00
136445.00
Rate (Rs)
Amount (Rs)
1226.00
1500476.88
Rate (Rs)
Amount (Rs)
55.55
125476.26
71.84
4137.98
62.00
500.00
75861.22
11500.00
14038273.27
Sub Estimate 2 :-Water Supply and Sanitation for Toilet Block at Dargah Hazarath Khwaja Banda Naw
Gulbarga.
Sl.
No.
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
250.00
0.50
0.50
62.50
Cum
250.00
0.50
0.50
62.50
Cum
250.00
250.00
Rmt
250.00
250.00
250.00
Rmt
164
164
Each
30.00
Each
EXCAVATION
KSRB 2-4: Refilling available earth around pipe lines, cables in layers
not exceeding 20cms in depth, compacting each deposited layer by
ramming after watering with lead upto 50m. and lift upto 1.5m.
including cost of all labour complete as per specifications allow 60%
of rate considered under item KSRB 2.3. (PWD DSR 2013-14 It. No.
2.11, P. No. 6)
Polyethylene pipe
KSRB 13-9.1: Providing and fixing to wall, ceiling and floor high
density polyethene pipes 6.00 kgf/sq.cm working pressure 63mm
outside diamter with special flange, compression type fittings, wall
clips, making good the wall, ceiling and floor including cost of all
materials, labour charges, HOM of equipments and testing complete
as per specifications. Specification No. 13.2.15.2/13.9 (PWD DSR
13-14 It. No. 13.71, P. No.102)
Rising main upto Tank
Add 10% for specials.
164
Stop Cock
30
Sl.
No.
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
KSRB 13-6.3-1 : Providing and fixing in position brass gate valve with
C.I wheel of approved quality (screwed end) (25,20)mm nominal bore
including cost of all materials, labour and HOM of equipments with all
leads complete as per specifications. Specification No. KBS 13.2.6 /
13.3 (Item No 13.34) (PWD DSR 2013-14 It. No. 13.34, P. No. 89)
25mm
Providing gum metel piller cocks 15mm dia of 1 class conforming to
ISI specifications and fixing them in position as per direcrtion including
of cost of materials and fixtures and conveyance to spot.
204
204
Each
40
40
Each
132
132
Each
Specification No KBS 11 (PWD DSR 2013-14 It. No. 12.5, P. No. 78)
Each
KSRB 11-7.2 : Providing and fixing white vitreous china clay, flat back,
lipped front urinal basin of 430x260x350mm. with 5 litres PVC
automatic flushing cistern, C.I./M.S brackets, standard flush pipe and
C.P. brass spreaders with brass unions and G.I. clamps complete
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete
as per specification. Specification No. KBS 11 (PWD DSR2013-14 It.
No. 12.8, P. No. 79)
Unit
KSRB 11-11.3 : Providing and fixing white vitreous china clay, flat back
wash basin size 550x400mm with a pair of 15mm C.P brass pillar taps
with C.I/M.S brackets, 32mm C.P. brass waste of standard pattern,
12 painting of fittings and brackets, cutting and making good the wall and
floor wherever required including cost of materials, labour complete
as per specifications. Specification No. KBS 11 (PWD DSR 2013-14
It. No. 12.25, P. No. 82)
40
Unit
164
164
Each
70
70
Unit
KSRB 11-5 : Providing and fixing white vitreous china clay, water
closet European type (Pedestal type) with black solid plastic seat and
lid, C.P. brass hinges, rubber buffers. 10 litre low level, P.V.C. flushing
cistern (all are approved make) with fittings, C.I. /M.S brackets, 40mm
diameter flush bean with fittings and clamps, overflow arrangements
10 with special and 25mm mosquito proof coupling of approved design,
painting of fittings and brackets, cutting and making good the wall and
floor wherever required, including cost of materials, labour complete
as per specifications.
11
13
KSRB 11-15.3 : Providing and fixing 453 X 357 mm dia circular shape
mirror with plastic moulded frame of approved make and shade with
14 6mm thick hard board backing including cost of materials, labour
complete as per specifications. (PWD DSR 2013-14 It. No. 12.41, P.
No. 84)
Sl.
No.
Particulars of work
No
15
KSRB 11-17.1 : Providing and fixing C.P. brass towel rail 740mm
length, 20mm dia with C.P brackets, fixed to wooden cleats with C.P.
brass screws including cost of materials, labour complete as per
specifications. (PWD DSR 2013-14 It. No. 12.45, P. No. 84)
70
L (m)
B (m)
D (m)
Qty
Unit
Unit
38.84
38.84
Sqm
9.71
1.00
12
7.20
86.40
Rmt
1
1
2
260.00
130.00
30.00
260.00
130.00
60.00
450.00
Rmt
134
134.00
Each
134
134.00
Each
41
41.00
Nos
SANITATION
Providing, laying and jointing PVC pipes of 110mm dia ( superme/
Finolex ) confirmaing to IS 4085-1960 & 7634-1975 Specification of
approved make with necessary specials such as collars, bends,
elbows, tees, nipples, plugs with cuts and theads using jointing
18 KUWSDB, 2013-14 Item No 6(sl No 7)
For Ground Floor (185+25+50)
For First Floor
From I/C to MH
Providing and fixing CI Nahani trap of approved make conforming to
ISI specifications and construction of cistern in CC 1:2:4 as per
directions (Rate is inclusive of cost of materials and fixtures and
19
conveyance of materials to work spot.) (PWD DSR2013-14 It. No.
12.113.2, P. No. 91)
Do 12.5 cms X 7.5 cms
Providing stoneware gully trap of approved quality and make fixing in
CC 1:2:4 and plastering with CM 1:3 wherever necessary (Rate
20 includes cost of all materials, fixtures and lead) (PWD DSR 2013-14
It. No. 12.112, P. No. 91)do (15cms X 10 cms)
Sl.
No.
Particulars of work
No
L (m)
B (m)
D (m)
Qty
Unit
9.00
Nos
8.00
Nos.
Grand total
Amount (Rs)
209.00
13062.50
56.35
3521.88
250.00
62500.00
6250.00
111.00
27750.00
2775.00
218.00
35752.00
160.00
4800.00
Rate
(Rs)
Amount (Rs)
580.00
118320.00
245.00
9800.00
4185.00
552420.00
4852.00
9704.00
3838.00
26866.00
3402.00
13608.00
57.00
9348.00
1135.00
79450.00
Rate
(Rs)
Amount (Rs)
740.00
1480.00
3320.00
128948.80
472.00
40780.80
237.00
106650.00
270.00
36180.00
175.00
23450.00
7607.00
311887.00
Rate
(Rs)
Amount (Rs)
10845.00
97605.00
8332.00
66656.00
1789564.98
Sub Estimate 3 : - Electrical Estimate for Proposed Toilet and Kitchen Bloc
at Hazrat Khwaja Banda Nawaz (Rh) at Gulbarga.
Sl.
Particulars
No.
Unit
Qty
650
280
6
7
8
9
10
11
12
Per Mtr
70.00
Per Mtr
40
Each
10
Each
Each
Each
Each
12
Point
14
Point
95
Point
46
Sl.
Particulars
12
No.
RA 12
13
14
Unit
Point
Qty
46
Point
160
Each
18
Each
RA 14
15
16
17
18
19
Wiring for lighting/power circuit using one of PVC insulated 1 Sq. mm,
1100V grade, multis and Copper conductor single core cable in open or
Per Mtr
consealed system of wiring
RA 17
c) 2.5 sqmm.
RA 18
4 sqmm.
RA 19
Supplying 4mm thick plastick sheet with necessary nitches for fixing
switches regulators etc., and fixing on existing wooden or metal box
using N.F. screws.
650
Per Mtr
1500
Per Mtr
300
Sq cm
6950
Each
Each
100
Each
Each
35
RA 20
20
Supplying and fixing cast Aluminium round or oblong type bulk head
fitting with GI wire guard, glass cover with 60/100 walts 230V GLS lamp
as required.
RA 21
21
Supplying patty type fluorescent tube light fitting of 4'- 36/40 watts
fluorescent tube fitting, made out of M.S sheet and stove enameled with
low loss open construction copper wound ferromagnetic ballast, starter,
locking type brass contact holders mounted on double fold type sheet
base fuly wired for use on 230 Volts A C Supply including 1No. 4'-36/4
Watts fluorescent tube.
RA 22
22
Supplying 250 Watts High pressure sodium vapour street light fitting die
cast aluminium canopy with aluminium housing for control gear,
finished stove enamel gray glassy white canopy interior with a pair of
anodized aluminium reflectors clear acrylic blow, gasket lining for drip
inseat resistance duly wired with porcelain holder copper choke, igniter
and HPF condenser including a sodium vapour lamp.
RA 23
23
Sl.
Particulars
No.
24
Supplying capacitor type 48" Sweep (1200 mm) ceiling fan complete
with down road blades, shakle, canopies ertc., for operation on 230
volts, 50 cycles, single phase AC supply conforming to ISS - 374 - 1979
and with double ball rearing system.
Unit
Qty
Each
12
Each
Each
100
Each
12
Each
35
Each
Each
Each
Each
Each
RA 25
25
Supplying and fixing 32 mm dia class A GI Pipe bracket upto 2.7 meters
long for fixing MV/SV/MH/FTL street light fitting of all capacities on
rail/RCC/wall/tublar pole, using suitable clapms, bolts and nuts and
wiring using suitable cpacity wires etc. complete.
RA 26
26
27
Fixing a ceiling/Wall mounting fan of all capacities and all types with
necessary clamps and S hook made out of 15 mm dia MS rod, with a 5
amps ceiling rose of approved quality with necessary length of
23/0.0076 inch PVC insulated twin twisted wire of approved quality with
regulator mounted on a suitable size wooden board and wired
complete.
RA 28
28
29
30
31
32
Fixing one exhaust fan in the nitch already left in the with bolts and
nuts and 5 amps ceiling rose with sufficient lingth of 23/0.0076 inch
PVC insulated twin core wire of approved make.
RA 29
Supplying of 63 A TPST with rewirable porcelain channels in SM sheet
enclosure.
RA 30
Supplying of 100 A TPST with rewirable porcelain channels in SM sheet
enclosure.
RA 31
Fixing of 15 Amps to 63 TPST / change over switch / contactor along
with neutral link with screws, bolts, nuts and wiring using required
capacity wires and circuit lableling.
RA 32
Fixing of 100 Amps to 250 TPST / change over switch / contactor along
with neutral link with screws, bolts, nuts and wiring using required
capacity wires and circuit lableling.
RA 33
33
Supplying and fixing 20" x 20" x 2.5" polished wood board made of not
less than 15 mm thick plank on bth sides with planks made out of not
more than 2 pieces and fixing the same to the wal using tapered
invertred wooden plugs screws etc.
RA 34
Sl.
Particulars
No.
34
Unit
Qty
Each
Each
20
Each
No
RA 35
35
36
37
38
60
RA 39
39
80
RA 40
40
Labour charges for laying of 3.5 core x 25 Sq. mm, 1.1 KV/class UG
cable when supplied agency in existing trench GI pipe / stoneware
pipe / on wall / on pole as required.
R Mtr
80
R Mtr
50
RA 41
41
Digging of trench of in Soil (hard), 0.6m deep x 0.50 mtr wide refiling
the trench to the required ground level and consolidating etc., complete.
(As per Civil SR KSRB 1-2, P-7)
RA 42
Total Rs.
Amount
32.00
20,800.00
41.00
11,480.00
43.00
3,010.00
53.00
2,120.00
98.00
980.00
80.00
480.00
68.00
408.00
52.00
312.00
44.00
528.00
175.00
2,450.00
260.00
24,700.00
368.00
16,928.00
Rate
368.00
Amount
16,928.00
38.00
6,080.00
106.00
1,908.00
91.00
728.00
11.00
7,150.00
25.00
37,500.00
32.00
9,600.00
0.22
1,529.00
604.00
5,436.00
400.00
40,000.00
6,150.00
18,450.00
2,500.00
87,500.00
Rate
Amount
1,800.00
21,600.00
885.00
2,655.00
105.00
10,500.00
210.00
2,520.00
310.00
10,850.00
3,050.00
6,100.00
5,400.00
5,400.00
165.00
330.00
500.00
500.00
285.00
285.00
Rate
Total Rs.
Amount
7,640.00
30,560.00
510.00
10,200.00
4,120.00
4,120.00
1,950.00
11,700.00
20.00
1,200.00
215.00
17,200.00
11.00
880.00
50.00
2,500.00
439,177.00
Unit
Supplying 19/20mm dia 2mm/2.5mm thick heavby gauge PVC conduit pipe with suitable
size bends, metal/PVC junction boxes adhesive paste etc., and running before
concreting the slab. The conduit should be tied to the reinforcement rods by sing binding
wires and unused ways of junction boxes and pipe ends should be covered using PVC
end enclosures, run with 18SWG GI fish wire wherever necessary
a) 19/20mm dia 2mm thick
PWD SR 10 - 11 Pg No. 2 It.No. 2(a)
Basic Rate
Add : AW
Sub- Total
b) 25 mm dia 2mm thick
PWD SR 10 - 11 Pg No. 2 It.No. 2(b)
Basic Rate
Add : AW
Sub- Total
Per Mtr
32.00
32.00
41.00
41.00
Per Mtr
Groove cuttingin in the wall supplying 19/20mm dia 2mm/2.5mm thick heavby gauge
PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive paste
etc., and bracing U or J hooks and cement plastering up to the surface of the brick level
and run with 18 SWG GI fish wire run through out the conduit wherever necessary.
3
Per Mtr
a) 19/20mm dia 2mm thick
PWD SR 10 - 11 Pg No. 2 It.No. 3(a)
Basic Rate
43.00
Add : AW
Sub- Total
43.00
b) 25 mm dia 2mm thick
PWD SR 10 - 11 Pg No. 2 It.No. 2(b)
Basic Rate
53.00 Per Mtr
Add : AW
Sub- Total
53.00
Supplying and flush molunting teak wooden box without front plank, made of not less
than 12 mm thick wood, after due goove cutting, necessary masonry patch work
complete.
a) 12x"12"x3" (300x300x76mm)
Each
PWD SR 10 - 11 Pg No. 3 It.No. 6(a)
Basic Rate
98.00
Add : AW
Sub- Total
98.00
b) 12x"9"x3" (300x228x76mm)
PWD SR 10 - 11 Pg No. 3 It.No. 6(b)
Basic Rate
80.00
Each
Add : AW
Sub- Total
80.00
c) 10x"7"x3" (254x178x76mm)
Each
Sl.
Particulars
No.
PWD SR 10 - 11 Pg No. 3 It.No. 6(c)
7 Basic Rate
Add : AW
Sub- Total
d) 8x"6"x3" (203x152x76mm)
PWD SR 10 - 11 Pg No. 3 It.No. 6(d)
8 Basic Rate
Add : AW
Sub- Total
e) 4x"4"x3" (101x101x76mm)
PWD SR 10 - 11 Pg No. 3 It.No. 6(e)
9 Basic Rate
Add : AW
Sub- Total
Unit
68.00
68.00
Each
52.00
52.00
Each
44.00
44.00
Each
Supplying and wiring adopting loop system in existing PVC conduit/casing capping
using copper PVC insulated multistrand 2 x 1.5 Sq.mm copper wire with a 6 Amps flush
type SP control switch shall be fixed on the exisiting plastic sheet/gang box, the other
end of the wires shall be terminated with sufficient loose length in a wood/PVC round
block complete for each outlet.
10
Point
Short point upto 3 Mtr from tapping point to out let via switch.
PWD SR 10 - 11 Pg No. 3 It.No. I(a)
Basic Rate
Add : AW
Sub- Total
Medium point above 3 Mtr upto 6 Mtr from tapping point to outlet via switch.
175.00
175.00
Basic Rate
Add : AW
Sub- Total
260.00
Point
260.00
Long point above 6 Mtr upto 10 Mtr from tapping point to outlet via switch.
PWD SR 10 - 11 Pg No. 3 It.No. I(c)
12
Basic Rate
Add : AW
Sub- Total
368.00
Point
368.00
Basic Rate
Add : AW
Sub- Total
38.00
Point
38.00
Supplying 6 Amps 3/5 way flush/projected type socket and 6 amps flush/projected type
SP switch either surface/flush mounting in a existing gang box or in a 4 mm thick
plastick sheet and fixing over a flush mounted wooden box and wiring using necessary
caopacity wires as required.
14
Each
Sl.
Particulars
14
No.
PWD SR 10 - 11 Pg No. 6 It.No. 12(b)
Basic Rate
Add : AW
Sub- Total
Unit
Each
106.00
106.00
Supplying and mounting 2 Nos. of 2 way 6 amps flush type switches either surfface/flush
mounted on exising gang box or in 4mm thick plastic sheet and mounted on a flush
mounted wooden box and wiring as required.
15
Each
91.00
91.00
Wiring for lighting/power circuit using one of PVC insulated 1100V grade, multis and
Copper conductor single core cable in open or consealed system of wiring
1 sqmm.
16
Per Mtr
11.00
11.00
c) 2.5 sqmm.
PWD SR 10 - 11 Pg No. 9 It.No. 20(I)(c)
17
Basic Rate
Add : AW
18
Sub- Total
4 sqmm.
PWD SR 10 - 11 Pg No. 9 It.No. 20(I)(d)
Basic Rate
Add : AW
Sub- Total
25.00
Per Mtr
25.00
32.00
32.00
Per Mtr
Supplying 4mm thick plastick sheet with necessary nitches for fixing switches regulators
etc., and fixing on existing wooden or metal box using N.F. screws.
19
Sqcm
0.22
0.22
Supplying and fixing cast Aluminium round or oblong type bulk head fitting with GI wire
guard, glass cover with 60/100 walts 230V GLS lamp as required.
20
Each
604.00
604.00
Sl.
Particulars
No.
Unit
Supplying patty type fluorescent tube light fitting of 4'- 36/40 watts fluorescent tube
fitting, made out of M.S sheet and stove enameled with low loss open construction
copper wound ferromagnetic ballast, starter, locking type brass contact holders mounted
on double fold type sheet base fuly wired for use on 230 Volts A C Supply including 1No.
4'-36/4 Watts fluorescent tube.
21
Each
a) Group 'A'
PWD SR 10 - 11 Pg No. 16 It.No. 2(a)
Basic Rate
Add : AW
Sub- Total
400.00
400.00
SupplyingHigh pressure sodium vapour street light fitting die cast aluminium canopy
with aluminium housing for control gear, finished stove enamel gray glassy white canopy
interior with a pair of anodized aluminium reflectors clear acrylic blow, gasket lining for
drip inseat resistance duly wired with porcelain holder copper choke, igniter and HPF
condenser including a sodium vapour lamp.
22
II 250 Watts
a) Group 'A'
Each
6,150.00
6,150.00
Supplying of 12" Sweep1440rpm heavy duty exahust fan with bracket blades suitable for
operate on 230V 50Hz, AC Supply complete.
23
2,500.00
2,500.00
Each
Supplying capacitor type 48" Sweep (1200 mm) ceiling fan complete with down road
blades, shakle, canopies ertc., for operation on 230 volts, 50 cycles, single phase AC
supply conforming to ISS - 374 - 1979 and with double ball rearing system.
24
Each
1,800.00
1,800.00
Supplying and fixing 32 mm dia class A GI Pipe bracket upto 2.7 meters long for fixing
MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tublar pole, using
suitable clapms, bolts and nuts and wiring using suitable cpacity wires etc. complete.
25
Each
885.00
25
Each
Sl.
Particulars
No.
Add : AW
Sub- Total
Unit
885.00
Fixing all types and all capacities fluorescent/false ceiling/spot light/CFL fittings indor on
the wall/seiling/rafters/girders using 23/0.0076" twin twisted PVC insulated wires,
required nos of round blocks and clamps (if required)
26
a) On wall/ceiling/Rafters/Girders.
Each
105.00
Add : AW
Sub- Total
27
105.00
Fixing a ceiling/Wall mounting fan of all capacities and all types with necessary clamps
and S hook made out of 15 mm dia MS rod, with a 5 amps ceiling rose of approved
quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of
approved quality with regulator mounted on a suitable size wooden board and wired
complete.
PWD SR 10 - 11 Pg No. 29 It.No.9
Basic Rate
210.00
Add : AW
Sub- Total
Each
210.00
Fixing one exhaust fan in the nitch already left in the with bolts and nuts and 5 amps
ceiling rose with sufficient lingth of 23/0.0076 inch PVC insulated twin core wire of
approved make.
28
310.00
Add : AW
Sub- Total
Each
310.00
3,050.00
3,050.00
Each
Sl.
Particulars
No.
Unit
5,400.00
Each
5,400.00
Fixing of 15 Amps to 63 TPST / change over switch / contactor along with neutral link
with screws, bolts, nuts and wiring using required capacity wires and circuit lableling.
31
Each
165.00
165.00
Fixing of 100 Amps to 250 TPST / change over switch / contactor along with neutral link
with screws, bolts, nuts and wiring using required capacity wires and circuit lableling.
32
Each
500.00
500.00
Supplying and fixing 20" x 20" x 2.5" polished wood board made of not less than 15 mm
thick plank on bth sides with planks made out of not more than 2 pieces and fixing the
same to the wal using tapered invertred wooden plugs screws etc.
33
Basic Rate
Add : AW
Sub- Total
34
Each
Supplying and fixing 12 Way regular MCCB distribution panel confirm tgo IS 8828, on
wall/woodboard/flush mounting using required clamps, bolts, nuts etc., with provision for
fixing of suitable type capacity MCCB's as an incomer of 3 phase Double door with
necessary busbar completely wired to use on 440 Volts 3 phase 4 wire powder coated
painting etc., complete with a rpovision for fixing of single / three phase suitable capacity
MCCB/MCB's as outgoings confirm to IS8825.
PWD SR 10 - 11 Pg No. 36 It.No.11(c)
Basic Rate
Add : AW
Sub- Total
7,640.00
7,640.00
Each
Sl.
Particulars
No.
Unit
Supplying and fixing 32 Amps DP miniature circuit breakers on existing MCB distribution
boards using necessary fixing materials and wiring complete as required
35
Each
510.00
510.00
Supplying, fixing and wiring electronic 10 to 40 Amps three phase 4 wire class - 1
Accuracy Energy Meter.
36
37
4,120.00
Each
4,120.00
Supplying, fixing, wiring, earth electrode for grounding conduits, IC cutouts and other
equiments on the meter board using 40 mmdia 2.90 hick GI pipe 2.5 mtr long buried in a
pit . The pit should be filled with equal proportion of salt and charcoal 150 mm alround
the pipe to complete the depth. The connection from the pipe to the conduit etc. is to be
established through GI wire of size as per ISI specification 7.3.3 of IS 732 using 12 mm
dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12
mm dia.
No
1,950.00
1,950.00
Supplying and running 8 SWG GI conductor for grounding and (along with other wires in
conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers
etc.
38
Per Mtr
20.00
20.00
Per Mtr
215.00
215.00
Labour charges for laying of 3.5 core x 25 Sq. mm, 1.1 KV/class UG cable when
supplied agency in existing trench GI pipe / stoneware pipe / on wall / on pole as
required.
40
R Mtr
Sl.
Particulars
No.
40 PWD EL SR 07-08 Pg No. 69 It.No.5(I)(b).
Basic Rate
Add : AW
Total
Unit
R Mtr
11.00
11.00
Digging of trench of in Soil (hard), 0.6m deep x 0.50 mtr wide refiling the trench to the
required ground level and consolidating etc., complete. (As per Civil SR KSRB 1-2, P-7)
41
50.00
50.00
R Mtr
32.00
41.00
43.00
53.00
98.00
80.00
68.00
Rate
68.00
52.00
44.00
175.00
260.00
368.00
38.00
106.00
Rate
106.00
91.00
11.00
25.00
32.00
0.22
604.00
Rate
400.00
6,150.00
2,500.00
1,800.00
885.00
885.00
Rate
105.00
210.00
310.00
3,050.00
Rate
5,400.00
165.00
500.00
285.00
7,640.00
Rate
510.00
4,120.00
1,950.00
20.00
215.00
11.00
Rate
11.00
50.00
Rate Analysis :-Construction of Toilet Block Building and Dining Hall at Dargah Hazarath
Banda Nawaz (Rh), Gulbarga.
Sl.
No
Particulars of work
Sl.
No
Particulars of work
KSRB 4.9.2 : providing TMT steel reinforcement for RCC work including
straighten, cutting, bending, placing in position lapping & / or welding
wherever required tying with+B48 binding wire and anchoring to the
adjoining members wherever necessary completed as per design (lapps,
(PWDSR 2013-14 Phooks & eastage shall not be measured & paid) cost of materials, labour,
16 It no-4.46.2)
HOM of machinery complete as per specification & lift charge for steel of
all diameters for additional floors over ground floor per q floor height of
3.5m or part there of cost of labour, complete as per specifications.NoKBS 4.6.3 (Fe 500)
10
For Coloumn First Floor ( Additional rate Rs. 20 Shall be added for every
additional meter or part there of for the above limits.
11
PWD SR.2013-14 It
No.4-34 P No 17
Sl.
No
Particulars of work
KSRB 7.1 : Providing and fixing in position collapsible steel shuttures with
single or double leaf with verticle channel 20mmX10mmX2mm braced
with flat iron diagonals 20mmX5mm size, with top and bottam rails of T Specification No. KBS
iron sections of 40X40X6mm with 38mmdia steel pulleys complete with 7.7/7.12 (PWD DSR
14
bolt and nuts, locking arrangements, stoppers, handles on both sides with 2013-14 It No.7.1 P
7.5cms openings at 10cms. c to c applying a priming coat of red lead
No.36)
paint. cost of materials, labour, HOM of machinery complete as per
specifications.size of gate 2.4mX 1.40m Specification No. KBS 7.7/7.12
Sl.
No
Particulars of work
KSRB 9.5-1 Providing and fixing in position fully panelled Hone wood
shutters for door, style and rails of 40mm.thick with bottom and rock rails
180mm wide top rails and styles 100mm wide as per drawing and panels KSRB 2010-2011 It No
17
of 25mm thick including cost of materials, labours, HOM of machineries
9.15 P No.56
complete as per Specification with all lead and lifts and as per the
direction of Engineer-in-charge.Specification No KBS 9.34
KSRB 7.9 : Providing and fixing M.S. grill work of windows and ventilators
weighing 21 kg/sqm using M.S flats, or M.S. square rods, or combination
. KBS 7.12 (PWD DSR
of M.S. flats and square rods as per approved design, drawing including
19
2013-14 It. No. 7.9, P.
cutting steel sections and welding the same to required pattern with a coat
No. 37)
of red lead primer, cost of materials, fixtures, labour and HOM of
machinery complete as per specifications. Specification No
KSRB 15-3.10 :Providing 20mm thick cement plaster in single coat with
cement mortar 1:4, to stone masonry and concrete surrface including
(PWD DSR 2013-14 It.
20 rounding off corners wherever required smooth rendering, :Providing and
No. 15.19, P. No. 123)
removing scaffolding, including cost of materials, labour, curing complete
as per specifications.
Sl.
No
Particulars of work
KSRB 15-3.10 :Providing 20mm thick cement plaster in single coat with
cement mortar 1:3, to stone masonry and concrete surrface including
21 rounding off corners wherever required smooth rendering, :Providing and
removing scaffolding, including cost of materials, labour, curing complete
as per specifications.
Providing vitrified tiles 60 x 60cms of approved make, shade and size for
flooring laid on a bed of 12mm thick cement mortar 1:3 mix, flush pointing (PWD DSR 2013-14 It.
23
with white cement using colour pigment, including cost of materials, No. 14.45, P. No. 116
labour, curing complete as per specifications.
KSRB 14. 10-1 : Flooring with 25mm to 40mm thick polished tandur blue
stone slabs using cement mortar 1:6, 25mm thick over existing cement
concrete bed or top of roof laid to line and level and jointed with cement
(PWD DSR 2013-14 It.
24
slurry mixed with pigment to match the shade of hte slab, including cost of No. 14.15, P. No. 112)
materials, labour, curing, polishing complete as per specifications.
Specification No. KBS.
Providing flooring with 60 cms.x 60 cms size vitrified glazed tiles of
approved quality and make, fixed on top of existing flooring fixed with
25
suitable adhesive, including cutting the tiles to the required size and fixing
etc., complete.
KSRB 15-14.1 : Providing and applying two coats with oil bound washable
distemper of approved brand and shade on wall surface including priming
(PWD DSR 2013-14
coat with distemper primer after throughly brooming the surface free from
26
It. No. 15.49.1, P. No.
mortar drops and other foreign matter including preparing the surface
126)
even and sand paper smooth, cost of materials, labour, complete as per
specifications.
KSRB 15-18.2 : Providing and applying enamel metal paint two coats
(exluding priming coat) over new steel or other metal surface brushing to
27
give an even shade after cleaning oil, graease, dirt and other foreign
matter, including cost of materials, labour, complete as per specifications.
KSRB 15-16 : Providing and finishing external walls in two coats with
water proof cement paint of approved bran and shade to give an even
28 shade after throghly brooming the surface to remove all dirt and loose
powdered material, free from mortar drops and other foreign matter cost of
materials, labour, complete as per specifications.
Rate (Rs)
Cum
116.00
Cum
209.00
Cum
3877.00
Cum
5071.00
Cum
5121.00
Cum
93.9
Cum
5194.00
Cum
5219.00
Unit
Rate (Rs)
Qtl
6846.00
Sqm
197.00
Sqm
303.00
Sqm
403.00
Sqm
219.00
Sqm
319.00
Sqm
257.00
Sqm
800.00
Sqm
697.00
Unit
Rate (Rs)
sqm
4051.00
Sqm
5879.00
cum
81044.00
Unit
Rate (Rs)
Sqm
3707.00
Sqm
3261
Kgs
89.49
Sqm
174.00
Unit
Rate (Rs)
Sqm
196.00
Cum
4098.00
Sqm
1115.00
Sqm
941.00
Sqm
1226.00
Sqm
55.55
Sqm
71.84
Sqm
62.00
Each
500.00
Rate Analysis :-Water Supply and Sanitation for Toilet and Kitchen Block at D
Hazarath Khwaja Banda Nawaz (RH) at Gulbarga.
Sl.
No.
Particulars of work
Page No &
Item No
KSRB 2-4: Refilling available earth around pipe lines, cables in layers not
exceeding 20cms in depth, compacting each deposited layer by ramming after (PWD DSR
watering with lead upto 50m. and lift upto 1.5m. including cost of all labour 2013-14 It. No.
complete as per specifications allow 60% of rate considered under item KSRB 2.11, P. No. 6)
2.3.
KSRB 13-9.1: Providing and fixing to wall, ceiling and floor high density
(PWD DSR
polyethene pipes 6.00 kgf/sq.cm working pressure 63mm outside diamter with
13-14 It. No.
special flange, compression type fittings, wall clips, making good the wall, ceiling
13.71, P.
and floor including cost of all materials, labour charges, HOM of equipments and
No.102)
testing complete as per specifications. Specification No. 13.2.15.2/13.9
KSRB 13-10.2: Providing and fixing to wall, ceiling and floor unplasticised PVC
(PWD DSR
pipes 10.00 kgf/sq.cm working pressure 32mm outside diameter chemp
13-14 It. No.
plast/wavin or equivalent make with pipe fittings, wall clips, making god the wall,
13.77, P. No.
ceiling and floor, including cost of all materials, labour charges, HOM of
103)
specification
KSRB 13-6.1-1 : Providing and fixing in position brass bib cock of approved (PWD DSR
quality 15mm nominal bore including cost of all materials, labour and HOM of 2013-14 It. No.
equipments with all leads complete as per specifications. Specification No. KBS
13.23, P.
13.2.2 /13.3
No.96)
KSRB 13-6.2-2 : Providing and fixing in position brass stop cock of approved (PWD DSR
quality 20mm nominal bore including cost of all materials, labour and HOM of 2013-14 It. No.
equipments with all leads complete as per specifications. Specifications. No. 13.27 P. No.
KBS 13.2.2 /13.3
96)
KSRB 13-6.3-1 : Providing and fixing in position brass gate valve with C.I wheel (PWD DSR
of approved quality (screwed end) (25,)mm nominal bore including cost of all 2013-14 It. No.
materials, labour and HOM of equipments with all leads complete as per 13.34, P. No.
specifications. Specification No. KBS 13.2.6 / 13.3 (Item No 13.34)
89)
(PWP&IWTD
Providing gum metel piller cocks 15mm dia of 1 class conforming to ISI
2013-2014 P
specifications and fixing them in position as per direcrtion including of cost of
No. 104 It No
materials and fixtures and conveyance to spot.
13.80)
Sl.
No.
Particulars of work
Page No &
Item No
KSRB 11-2 : Providing and fixing white vitreous china clay, water closet Orrissa
(PW,P &
pattern of size 580 X 440 mm with integral type footrests, 100mm S or Ptrap, 10
IWTD,Gulbarg
litre low level, P.V.C. flushing cistern (all are approved make) with fittings, C.I.
a circle
/M.S brackets, 32mm diameter flush bean with fittings and clamps, overflow
Gulbarga
arrangements with special and 25mm mosquito proof coupling of approved
2013-14 It. No.
design, painting of fittings and brackets, cutting and making good the wall and
12.2, P. No.
floor wherever required, including cost of materials, labour complete as per
78)
specifications. Specification No KBS 11
10
KSRB 11-5 : Providing and fixing white vitreous china clay, water closet European
type (Pedestal type) with black solid plastic seat and lid, C.P. brass hinges, Specification
rubber buffers. 10 litre low level, P.V.C. flushing cistern (all are approved make) No KBS 11
with fittings, C.I. /M.S brackets, 40mm diameter flush bean with fittings and (PWD DSR
clamps, overflow arrangements with special and 25mm mosquito proof coupling 2013-14 It. No.
of approved design, painting of fittings and brackets, cutting and making good the 12.5, P. No.
wall and floor wherever required, including cost of materials, labour complete as
78)
per specifications.
11
KSRB 11-7.2 : Providing and fixing white vitreous china clay, flat back, lipped front
urinal basin of 430x260x350mm. with 5 litres PVC automatic flushing cistern,
(PWD
C.I./M.S brackets, standard flush pipe and C.P. brass spreaders with brass DSR2013-14
unions and G.I. clamps complete painting of fittings and brackets, cutting and It. No. 12.8, P.
making good the wall and floor wherever required, including cost of materials,
No. 79)
labour complete as per specification. Specification No. KBS 11
12
KSRB 11-11.3 : Providing and fixing white vitreous china clay, flat back wash
basin size 550x400mm with a pair of 15mm C.P brass pillar taps with C.I/M.S
brackets, 32mm C.P. brass waste of standard pattern, painting of fittings and (PWD DSR
brackets, cutting and making good the wall and floor wherever required including 2013-14 It. No.
cost of materials, labour complete as per specifications. Specification No. KBS 12.25, P. No.
11
82)
13
Wall bores in Brick masonry upto 45 cms thick ( item No 37.35 P No.267
DSR.2013-14
14
(PWD DSR
KSRB 11-15.3 : Providing and fixing 453 X 357 mm dia circular shape mirror with
2013-14 It. No.
plastic moulded frame of approved make and shade with 6mm thick hard board
12.41, P. No.
backing including cost of materials, labour complete as per specifications.
84)
15
(PWD DSR
KSRB 11-17.1 : Providing and fixing C.P. brass towel rail 740mm length, 20mm
2013-14 It. No.
dia with C.P brackets, fixed to wooden cleats with C.P. brass screws including
12.45, P. No.
cost of materials, labour complete as per specifications.
84)
16
Providing and laying floor for corridors/lobbies using combination of pre polished
19mm thick water cut/gang saw grey granite, black granite and strips of 50mm (PWD DSR
wide pre flamed grey granite using pre polished grey granite 19mm thick 76% pre 2013-14 It. No.
polished black granite 19mm thick @ 2% and preplamed 19mm thick grey granite 14.48, P. No.
@ 22% over existing cement concrete bed in CM 1:4 aveage 20mm thick pointed
115)
with white cement/colour pigment etc., complete.
Sl.
No.
17
18
19
20
Particulars of work
Page No &
Item No
KSRB 8.6-5: Providing and fixing on wall surface 2.5kg/sq.cm H.D.P.E. rain down
(PWD DSR
water pipes 110mm outer dia approved make and brand with necessary specials
2013-14 It. No.
like shoes, bends and offsets fixed with iron clamps, wall plugs, screws, including
8.17 P. No. 52)
cost of materials, labour, curing complete as per specifications.
Providing, laying and jointing PVC pipes of 110mm dia ( superme/ Finolex )
KUWSDB,
confirmaing to IS 4085-1960 & 7634-1975 Specification of approved make with
2013-14 Item
necessary specials such as collars, bends, elbows, tees, nipples, plugs with cuts
No 6(sl No 7)
and theads using jointing
(PWD
Providing and fixing CI Nahani trap of approved make conforming to ISI
DSR2013-14
specifications and construction of cistern in CC 1:2:4 as per directions (Rate is
It. No.
inclusive of cost of materials and fixtures and conveyance of materials to work
12.113.2, P.
spot.)
(PWD
DSR
No. 91)
Providing stoneware gully trap of approved quality and make fixing in CC 1:2:4 2013-14 It. No.
and plastering with CM 1:3 wherever necessary (Rate includes cost of all 12.112, P. No.
materials, fixtures and lead)
91)do (15cms
X 10 cms)
21
22
KSRB 12-5.1 : Constructing brick masonry circular type manhole 0.91m internal
dia at bottom 0.91m deep and 0.56m dia at top with table moulded non-modular
bricks of 50 class designation 50 in cement mortar 1:4, inside cement plastered
12mm thick with cement mortar 1:3, finished with a floating coat of neat cement,
foundation concrete M 10 using 40mm and downsize granite metal and making
necessary channel in cement concrete M 50 with 20mm and downsize granite
metal finished with a floating coat of neat cement, with S.F.R.C. cover and frame
(heavy duty, HD-20 grade designation) 560mm internal diametre confirming IS :
12592, total weight cover and frame to be nto less than 182 kg, fixed in cement
concrete 1:2:4, 20mm and downsize broken granite metal, providing an
dremoving centering, shuttering including cost of materials, labour charges, HOM
of machineries complete as per specifications. (Excavation, footrests and 12mm
thick cement plaster on the external surface shall be paid seperately)
23
KSRB 13-11.1: Providing and placing on terrace, polyethene water storage tanks
(PW,P &IWTD
with manhole lid and suitable locking arrangements, making holes of suitable
GULB 2013-14
diameter for inlet, outlet and over flow pipes, including cost of all materials,
P.No103 It.No,
labour, transport charges, HOM of equipments and testing complete as per
13.78
specifications. (For 1000 litr capacity) Specification No. KBS 13.22
en Block at Dargah
a.
Unit
Rate (Rs)
Cum
209.00
Cum
56.35
Rmt
250.00
Rmt
111.00
Each
218.00
Each
160.00
Each
580.00
Each
245.00
Unit
Rate (Rs)
Each
4185.00
Each
4852.00
Unit
3838.00
Unit
3402.00
Each
57.00
Unit
1135.00
Unit
740.00
Sqm
3320.00
Unit
Rate (Rs)
Rmt
472.00
Rmt
237.00
Each
270.00
Each
175.00
Nos
7607.00
Nos
10845.00
Nos.
8332.00
Description of Items
Measurement
No.
Column-F1
12
1.50
1.50
2.44
65.85
Column-F2
12
1.52
1.52
2.44
68.01
Column-F3
13
2.13
2.13
2.44
144.41
Column-F4
2.13
2.13
2.44
99.98
Column-F5
2.13
2.13
2.44
22.22
Column-F6
2.13
2.13
2.44
33.33
433.80 Cum
Rate
139.00
12
5.00
5.00
0.50
150.00
Column-F2
12
5.00
5.00
0.50
150.00
Column-F3
13
7.00
7.00
0.50
318.50
Column-F4
7.00
7.00
0.50
220.50
Column-F5
7.00
7.00
0.50
49.00
Column-F6
7.00
7.00
0.50
73.50
961.50
Say
Unit
Say
Qty.
27.25 Cum
12
4.00
4.00
0.75
Cft
144.00
3877.00
Sl.
No.
Description of Items
Measurement
Qty.
No.
F2
12
4.00
4.00
0.75
144.00
F3
13
6.00
6.00
0.75
351.00
F4
6.00
6.00
0.75
243.00
F5
6.00
6.00
1.00
72.00
F6
6.00
6.00
1.00
108.00
Second Step F1
12
3.00
3.00
1.00
108.00
F2
12
3.00
3.00
1.25
135.00
F3
13
5.00
5.00
1.25
406.25
F4
5.00
5.00
1.50
337.50
F5
5.00
5.00
1.00
50.00
F6
5.00
5.00
1.25
93.75
C1
12
0.75
1.50
21.00
283.50
C2
12
0.75
1.50
21.00
283.50
C3
13
0.75
2.00
21.00
409.50
C4
0.75
2.00
21.00
283.50
C5
0.75
2.00
21.00
63.00
C6
0.75
2.00
21.00
94.50
Plinth beam
981.40
0.75
2.00
1472.10
Roof beam
878.50
0.75
1.50
988.31
Lintel
878.50
0.75
0.50
329.44
Roof slab
106.13
74.75
0.54
4283.74
Dedt
-1
8.75
8.50
0.54
-40.16
-1
17.50
37.00
0.54
-349.65
-1
75.63
5.00
0.54
-204.20
-1
42.00
10.75
0.54
-243.81
-1
51.00
6.50
0.54
-179.01
-1
20.75
16.00
0.54
-179.28
18.00
4.00
0.42
120.96
20x
4.00
1.00
0.50
40.00
Unit
Rate
Column (Ht=4+11+6=21)
Staircase
9648.43
Say
4
273.48 Cum
981.40
0.75
2.00
1472.10
External Walls
347
0.75
11.00
2862.75
Gents Toilet
294.35
0.75
11.00
2428.39
Ladies Toilet
228.25
0.75
11.00
1883.06
Partition Wall
Cft
4447.00
Sl.
No.
Description of Items
Measurement
Qty.
No.
20.5
0.33
11.00
446.49
18
4.00
0.33
11.00
261.36
41.5
0.33
11.00
150.65
10
0.33
11.00
145.20
26.25
0.33
11.00
285.86
12
0.33
11.00
174.24
19.50
0.33
11.00
70.79
4.00
0.33
11.00
58.08
0.33
11.00
116.16
74.17
0.33
11.00
269.24
16
0.33
11.00
232.32
5.88
0.33
11.00
21.33
-75
2.50
0.33
7.00
-433.13
D1
-6
4.00
0.33
7.00
-55.44
Gate
-1
10.00
0.75
11.00
-82.50
Lintel
-1
878.50
0.75
0.50
-329.44
Deductions V
-1
505.34
0.75
2.00
-379.01
Gents Toilet
WC
Bath
Ladies Toilet
Duct Area
HWC
Deduct Door D
9598.50
Say
Unit
Cft
272.07 Cum
20.50
12.00
3.75
2767.50
Room3
10.00
14.00
3.75
525.00
Room-2
10.00
14.00
3.75
525.00
Room-1
9.13
14.00
3.75
479.06
Bath area
12.00
10.00
3.75
1350.00
20.75
10.00
3.75
778.13
15.17
10.00
3.75
568.88
Duct area
74.17
5.00
3.75
1390.69
Ladies toilet
11.25
20.50
3.75
864.84
12.00
20.50
3.75
922.50
9.88
20.50
3.75
759.14
26.63
20.50
3.75
2046.80
8.00
12.00
3.75
360.00
12.00
15.25
3.75
686.25
Rate
5194.00
Sl.
No.
Description of Items
Passage
Measurement
Qty.
No.
9.88
15.25
3.75
564.73
5.88
9.25
3.75
203.79
21.00
9.75
3.75
767.81
10.00
37.75
3.75
1415.63
27.50
10.00
3.75
1031.25
6.50
10.50
3.75
255.94
18262.92
Say
Gents Toilet
20.50
12.00
0.50
369.00
Room3
10.00
14.00
0.50
70.00
Room-2
10.00
14.00
0.50
70.00
Room-1
9.13
14.00
0.50
63.88
Bath area
12.00
10.00
0.50
180.00
20.75
10.00
0.50
103.75
15.17
10.00
0.50
75.85
Duct area
74.17
5.00
0.50
185.43
Ladies toilet
11.25
20.50
0.50
115.31
12.00
20.50
0.50
123.00
9.88
20.50
0.50
101.22
26.63
20.50
0.50
272.91
8.00
12.00
0.50
48.00
12.00
15.25
0.50
91.50
9.88
15.25
0.50
75.30
5.88
9.25
0.50
27.17
21.00
9.75
0.50
102.38
10.00
37.75
0.50
188.75
27.50
10.00
0.50
137.50
6.50
10.50
0.50
34.13
Rate
Cft
517.66 Cum
Passage
Unit
93.90
Sl.
No.
Description of Items
Measurement
No.
Qty.
2435.06
Say
Rate
Cft
69.02 Cum
3877.00
Room-1
46.25
11.00
508.75
Room-2
48.00
11.00
528.00
Room-3
48.00
11.00
528.00
233.88
11.00
2572.68
W/c Urinals
25.96
11.00
285.56
Urinals
30.63
11.00
336.93
226.90
11.00
2495.90
276.34
11.00
3039.74
W/C
75.00
11.00
825.00
267.00
11.00
2937.00
140.25
11.00
1542.75
HWC
31.41
11.00
345.51
72.25
11.00
794.75
Ladies Staircasr
61.50
11.00
676.50
Passage
191.50
11.00
2106.50
-75
2.50
7.00
-1312.50
-6
4.00
7.00
-168.00
Deduct D
D1
18043.07
Say
Unit
1676.87 Sqm
Gents Toilet
Passage
Room-3
Sft
33
4.00
5.00
660.00
37.71
5.00
188.55
20.50
4.00
246.00
10.00
14.00
140.00
164.00
Sl.
No.
Description of Items
Measurement
L
Room-2
10.00
14.00
140.00
Room-1
9.13
14.00
127.75
Bath
4.00
5.00
20.00
W/c
8.71
5.75
50.08
Urinals
27.67
5.75
159.10
31.71
10.00
317.10
19
4.00
5.00
380.00
Passage
25.75
4.00
206.00
Toilet
4.00
5.00
80.00
Passage
8.50
4.00
34.00
17
4.00
5.00
340.00
Passage
74.17
6.42
476.17
HWC
5.88
9.83
57.75
28.38
9.75
276.66
Passage
37.75
10.00
377.50
27.75
10.00
277.50
10.50
6.50
68.25
Ladies Staircase
21.00
9.75
204.75
18.00
4.00
0.00
18.00
1.00
0.00
Ladies Toilet
Bath
Qty.
No.
4827.16
Say
9
Unit
Rate
Sft
448.62 Sqm
145.00
347.00
14.00
4858.00
74.17
14.00
2076.76
5.00
14.00
140.00
Deductions V
-1
505.34
2.00
-1010.68
Doors
-3
3.00
7.00
-63.00
Gate
-1
10.00
7.00
-70.00
-1
27.00
7.00
-189.00
Duct area
5742.08
Say
Sft
533.65 Sqm
174.00
Sl.
No.
10
Description of Items
Measurement
No.
Qty.
Rate
37.71
5.00
188.55
20.50
4.00
246.00
Room-3
10.00
14.00
140.00
Room-2
10.00
14.00
140.00
Room-1
9.13
14.00
127.75
Urinals
27.67
5.75
159.10
31.71
10.00
317.10
Passage
8.50
4.00
34.00
Passage
74.17
6.42
476.17
28.38
9.75
276.66
Passage
37.75
10.00
377.50
27.75
10.00
277.50
10.50
6.50
68.25
21.00
9.75
204.75
Ladies Staircase
3033.33
Say
11
Unit
Sft
281.91 Sqm
145.00
75
4.00
5.00
1500.00
Dadoing
75
18.00
7.00
9450.00
Urinals
30.67
7.00
214.69
WC
8.71
5.75
50.08
28.92
7.00
202.44
Washbasin area
31.71
7.00
221.97
HWC
5.83
9.83
57.31
31.32
7.00
219.24
-75
2.50
7.00
-1312.50
Deduct door D1
10603.23
Say
Sft
985.43 Sqm
941.00
Sl.
No.
12
Description of Items
Measurement
No.
Qty.
First step - F1
12
20.00
0.75
180.00
F2
12
20.00
0.75
180.00
F3
13
28.00
0.75
273.00
F4
28.00
0.75
189.00
F5
28.00
1.00
56.00
F6
28.00
1.00
84.00
Second step - F1
12
12.00
1.00
144.00
F2
12
12.00
1.25
180.00
F3
13
20.00
1.25
325.00
F4
20.00
1.50
270.00
F5
20.00
1.25
50.00
F6
20.00
1.50
90.00
Say
Sft
179.46 Sqm
197.00
12
4.50
21.00
1134.00
C2
12
4.50
21.00
1134.00
C3
13
5.50
21.00
1501.50
C4
5.50
21.00
1039.50
C5
5.50
21.00
231.00
C6
5.50
21.00
346.50
5040.00
Say
14
Rate
1931.00
13
Unit
Sft
468.40 Sqm
981.40
3.00
2944.20
Roof beam
878.50
4.00
3514.00
303.00
Sl.
No.
Description of Items
Lintel
Measurement
No.
878.50
1.00
Qty.
Say
219.00
106.13
74.75
7932.84
Dedt
-1
8.75
8.50
-1
17.50
37.00
-647.50
-1
75.63
5.00
-378.15
-1
42.00
10.75
-451.50
-1
51.00
6.50
-331.50
-1
20.75
16.00
-332.00
-74.38
Say
Sft
531.40 Sqm
257.00
62.13
@ 60 Kg/Cum
3727.80
79.06
@ 110 Kg/Cum
8696.60
Roof slab
87.50
@ 80 Kg/Cum
7000.00
Staircase
2.28
@ 80 Kg/Cum
364.80
Say
17
Sft
681.85 Sqm
5717.82
16
Rate
878.50
7336.70
15
Unit
19789.20
Kgs
197.89
Qtl
3.5+2x7
0.33
0.42
14.55
75
2.50+2x7
0.33
0.42
171.52
6846.00
Sl.
No.
Description of Items
Measurement
No.
Qty.
186.07
Say
18
D1
Cft
5.27 Cum
3.00
7.00
126.00
75
2.00
7.00
1050.00
1176.00
Say
65470.00
Sft
109.29 Sqm
2781.00
Ventilators
505.34
2.00
1010.68
1010.68
Say
20
Rate
KSRB 9-7.3: Providing and fixing in position fully panelled nandi wood
shutters for doors, styles and rails of 30mm. thick with bottom and
lock rails 180mm wide top rail and styles 100mm wide as per drawing
and panels of 25mm thick including cost of materials, labour, HOM of
machineries complete as per specifications. (excluding cost of
fixtures) Specification No. KBS 9.34 (PWP & IWTD DSR, Glb. 2013-14
P.No. 57 I.No. 9.22)
D
19
Unit
93.93 Sqm
Corridor
Sft
10.00
7.00
70.00
6.50
7.00
45.50
3413.00
Sl.
No.
Description of Items
Measurement
No.
Qty.
115.50
Say
21
D1
3.00
7.00
2.25
283.50
75
2.50
7.00
2.25
2953.13
Say
4051.00
Sft
300.80 Sqm
27.50
KSRB 15-18.1: Applying red lead ready mix priming coat over new
steel or other metal surface including preparing the surface after
thoroughly cleaning oil, grease, dirt and other foreign matter, and
scoured with wire brushes, fine steel wool, sand papers including cost
of materials, labour, complete as per specifications. (PWP & IWTD
DSR, Glb. 2013-14 P.No. 130 I.No. 15.73)
Ventilators
505.34
2.00
1010.68
Collapsible gate
10.00
7.00
70.00
6.50
7.00
45.50
1126.18
Say
Sft
104.66 Sqm
23.40
3.00
7.00
2.25
283.50
75
2.50
7.00
2.25
2953.13
3236.63
Say
24
Sft
10.73 Sqm
3236.63
23
Rate
22
Unit
Sft
300.80 Sqm
505.34
2.00
1010.68
Collapsible gate
10.00
7.00
70.00
6.50
7.00
45.50
73.70
Sl.
No.
Description of Items
Measurement
No.
Qty.
1126.18
Say
25
104.66 Sqm
71.84
4827.16
22870.23
Say
Sft
2125.49 Sqm
55.55
5742.08
5742.08
Say
Sft
533.65 Sqm
48.92
KSRB 11-2: Providing and fixing White vitreous china clay , water
closet orissa patten of size 580x440 mm with integral type
footrests , 100mm S or P trap, 10 litre low level , PVC flushing cistern
(all are approved make) with fittings, CI/MS Brackets , 32 mm
diameter flush pipe fittings and clamps , overflow arrangements with
special and 25mm mosquito proof coupling of approved design ,
painting of fittings and brackets , cutting and making good the wall
and floor whereever required ,including cost of materials , labour
complete as per specifications. (PWP & IWTD DSR, Glb. 2013-14 P.No.
79 I.No. 12.2)
Pan
.
28
Sft
18043.07
27
Rate
KSRB 15.14.1: Providing and applying two coats with oil bound
washable distemper of approved brand and shade on wall surface
including priming coat with distemper primer after thoroughly
brooming the surface free from mortar drops and other foreign matter,
including preparing the surface, even and sand paper smooth, cost of
materials, labour, complete as per specifications. (PWP & IWTD DSR,
Glb. 2013-14 P.No. 126 I.No. 15.49.1)
Inside Plaster Qty
26
Unit
61.00
Pan
4185.00
7.00 Unit
3838.00
KSRB 11-7.3: Providing and fixing White vitreous china clay , Flat
back lipped front Urinal Basin of 430x260x350 in the range of
Three with 7.5 litres PVC automatic Flushing Cistern, CI/MS Brackets ,
standard flush pipe and CP brass spreaders with brass unions and G. I
clamps , painting of fittings and brackets , cutting and making good
the wall and floor whereever required ,including cost of materials ,
labour complete as per specifications. (PWP & IWTD DSR, Glb. 201314 P.No. 80 I.No. 12.8)
Sl.
No.
29
Description of Items
Measurement
No.
Qty.
Unit
KSRB 11-11.1: Providing and fixing White vitreous china clay , Flat
back wash basin size 630x450mm wtith a pair of 15mm CP
Brass Pillar Tap with CI/MS Brackets ,32 mm CP Brass waste of
standard pattern , painting of fittings and brackets , cutting and
making good the wall and floor whereever required ,including cost of
materials , labour complete as per specifications. (PWP & IWTD DSR,
Glb. 2013-14 P.No. 82 I.No. 12.23)
20.00 Unit
30
Rate
3838.00
KHWAJA BANDA
Amount
60298
105661
Amount
1216173
Amount
1413112
Amount
48608
Amount
267594
275006
Amount
65050
92855
Amount
40877
927290
Amount
35354
141926
Amount
149325
136569
1354769
Amount
345296
303946
320581
Amount
43484
8272
2449
22169
Amount
7519
118071
26106
255285
26866
Amount
76760
100000
7987271
599045
599045
9185361
14639
9200000