China Pakistan Economic Corridor

Province Wise List of Projects


1 May 2015
Energy Projects(Priority and Actively Promoted)
Province

Project Name

Location

MW

Estimated
Remarks
Cost($ Mn) (Province
Investment %age of Total
capacity/cost)
Capacity:6.2%

Hydro power Project

Suki Kinari,
Mahsehra

870

1,802

Khyber
Pakhtunkhwa

AJK

Cost: 6.7%
Capacity:13.1%

Hydro power Project


Hydro power Project

Karot
Kohala
Sub Total

720
1,100
1,820

1,420
2,397
3,817

Punjab

Cost: 14.1%
Capacity:18.9%

Coal based power


project
Coal based power
project
Salar based power
project

Salt Range

300

800

Sahiwal

1,320

1,600

Bahawalpur

1,000

1,350

Sub Total

2,620

3,750

Bhambore,
Thatta

50

125

Jhimpir,
Thatta

50

125

Jhimpir,
Thatta

50

134

Jhimpir,
Thatta

100

250

Jhimpir,
Thatta

100

150

Cost 13.8%
*Muzafargarh:
1320 MW. R Y
K 1320 MW
and Chichoki
Malian525
MW and
Transmission
lines not
included

Sindh
Wind based power
project
(Dawood)
Wind based power
project
(Sunec)
Wind based power
project
(Sachal)
Wind based power
project
(UEP)
Wind based power
project

Capacity:35.8%
Cost: 31.3 %

Coal based power


project
(SECMC) and mining
Coal based power
project
(SSRL) and mining
Coal based power
project
(Oracle)
Coal based power
project

Thar

660

1900

Thar

1320

2500

Thar

1320

1300

Port Qasim

1320

1980

Sub Total

4970

8464

Hub

660

970

Gaddani

2640

7920

Gwadar

300

360

Sub Total
Grand Total

3600
13880

9250
27083

Priority
Actively
Promoted
Total

10400
6645

Balochistan

Capacity:25.9%
Coal based power
project
Coal based power
project
Coal based power
project

JCC-3 Agreed Energy


Projects

Cost: 31.2%

17045
MW