Professional Documents
Culture Documents
Project Name
Location
MW
Estimated
Remarks
Cost($ Mn) (Province
Investment %age of Total
capacity/cost)
Capacity:6.2%
Suki Kinari,
Mahsehra
870
1,802
Khyber
Pakhtunkhwa
AJK
Cost: 6.7%
Capacity:13.1%
Karot
Kohala
Sub Total
720
1,100
1,820
1,420
2,397
3,817
Punjab
Cost: 14.1%
Capacity:18.9%
Salt Range
300
800
Sahiwal
1,320
1,600
Bahawalpur
1,000
1,350
Sub Total
2,620
3,750
Bhambore,
Thatta
50
125
Jhimpir,
Thatta
50
125
Jhimpir,
Thatta
50
134
Jhimpir,
Thatta
100
250
Jhimpir,
Thatta
100
150
Cost 13.8%
*Muzafargarh:
1320 MW. R Y
K 1320 MW
and Chichoki
Malian525
MW and
Transmission
lines not
included
Sindh
Wind based power
project
(Dawood)
Wind based power
project
(Sunec)
Wind based power
project
(Sachal)
Wind based power
project
(UEP)
Wind based power
project
Capacity:35.8%
Cost: 31.3 %
Thar
660
1900
Thar
1320
2500
Thar
1320
1300
Port Qasim
1320
1980
Sub Total
4970
8464
Hub
660
970
Gaddani
2640
7920
Gwadar
300
360
Sub Total
Grand Total
3600
13880
9250
27083
Priority
Actively
Promoted
Total
10400
6645
Balochistan
Capacity:25.9%
Coal based power
project
Coal based power
project
Coal based power
project
Cost: 31.2%
17045
MW