Professional Documents
Culture Documents
Sl.
No.
Item
No.
Particulars
Qty.
Unit
Rate
Amount
1.
5.1.1
19.753
M3
30.25
597.54
2.
5.1.10
34.301
M3
93.70
3213.98
3.
5.6.3
66.737
M2
65.80
4391.28
4.
5.3.2
9.208
M3
2391.40
22019.13
5.
5.2.3
5.461
M3
1226.90
67003.34
6.
5.3.12
2.546
M3
2996.70
7630.06
7.
5.3.6
1.813
M3
2703.40
4901.58
8.
5.2.14
16.858
M3
1259.00
21224.00
9.
5.3.13
1.767
M3
2850.15
5036.52
10.
5.3.7
1.464
M3
2714.80
3973.38
11.
5.3.15
1.953
M2
406.05
793.02
12.
5.3.10
1.107
M3
3523.55
3900.38
13.
5.3.9
6.485
M3
3197.65
20736.02
5.5.5
1.363
MT
34565.25
47129.54
15.
5.7.3
222.512
M2
44.65
9935.15
16.
5.8.3
222.512
M2
4.60
1023.55
17.
5.5.29
26.784
M2
1490.10
39910.84
18.
5.5.12
96.000
Kg.
38.05
3652.80
19.
5.8.43
62.496
M2
29.40
1837.38
Sub Total :-
208606.47
18962.33
9482.21
Total
199126.35
Say
199126.00
(Rupees one lakh ninety nine thousand one hundred twenty six only)
Deputy Agriculture
Director (Engineering)
Ranchi
Item
No.
Particulars
Qty.
Unit
Rate
Amount
1.
5.1.1
52.80469
M3
30.25
1597.34
2.
5.1.10
61.67023
M3
93.70
5778.50
3.
9.6.6
32.99002
M2
195.85
6461.10
4.
Annx.
-V
Cost of boulder
32.99002
M3
167.00
5509.33
5.
5.2.34
9.697066
M3
1088.85
10558.65
6.
5.3.2
18.32779
M3
2391.40
43829.07
7.
5.5.4.1
0.809531
MT
34835.55
28200.47
Sub Total :-
101934.50
9265.84
6116.07
1250.00
Total
100034.70
Say
100035.00
(Rupees one lakh ninety nine thousand one hundred twenty six only)
Deputy Agriculture
Director (Engineering)
Ranchi
Item
No.
Particulars
Qty.
Unit
Rate
1.
9.1.3.2
736.560
M2
1.80
1325.81
2.
5.1.1
12.713
M3
30.20
383.93
3.
5.3.2
12.713
M3
2358.30
29980.81
Length of wire.
343.374
MR
43.20
11833.77
301.752
15.95
4812.94
1.292
MR
28138.32
36350.25
4.
5.
5.3.22
6.
Angel Cost
Amount
7.
5.5.24
114
Nos.
6.2
706.80
8.
5.5.23
690
Nos.
1380.00
9.
Carriage
10.
Gate
3535.35
5000
10000.00
Sub Total :-
103309.66
923.68
4116.01
Total
100117.33
Say
100117.00
(Rupees one lakh ninety nine thousand one hundred twenty six only)
Deputy Agriculture
Director (Engineering)
Ranchi