Departamento de Ingeniera
05/15/2015
PRESUPUESTO
CLIENTE
OBRA
REFERENCIAL
HOJA 1
DE
OBRA
UBICACION : YANACOCHA
VIGENCIA : MAYO 2001
UN.
METRADO
PR.UNIT.($)
PARCIAL($)
A.
OBRAS CIVILES
GLB
1.00
302,145.00
302,145.00
B.
INSTALACIONES SANITARIAS
GLB
1.00
86,850.80
86,850.80
C.
INSTALACIONES ELCTRICAS
GLB
1.00
50,751.90
50,751.90
COSTO DIRECTO
US$
439,747.70
US$
65,962.16
US$
505,709.86
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
PRESUPUESTO
CLIENTE
OBRA
REFERENCIAL
HOJA 2
O B R AS
CIVILES
1.0
OBRAS PRELIMINARES
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
UBICACION : YANACOCHA
VIGENCIA : MAYO 2001
UN.
MES
MES
MES
MES
VJE
M2
MES
MES
METRADO
1.00
1.00
1.00
1.00
4.00
2,500.00
1.00
1.00
PR.UNIT.($)
400.00
500.00
400.00
600.00
250.00
0.40
250.00
500.00
SUB-TOTAL 1.0
2.0
MOVIMIENTO DE TIERRAS
2.1
2.2
2.3
2.4
3.1
3.2
M3
M3
M3
M3
502.00
98.00
15.00
765.00
6.00
8.00
6.00
6.00
4.1
ZAPATAS Y PEDESTALES
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
d) Pernos de anclaje
e) Mortero para nivelacin
MUROS Y LOSA DE RAMPA
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
LOSA DE PISO (t=0.15 m)
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
d) Juntas de control
e) Juntas de expansin
f) Recubrimiento epoxico de piso
VEREDAS (t=0.125 m)
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
d) Juntas de control
e) Juntas de expansin
4.2
4.3
4.4
3,012.00
784.00
90.00
4,590.00
8,476.00
M2
M3
50.00
2.00
6.00
60.00
300.00
120.00
420.00
M3
M2
KG
Kg
Lit.
28.00
60.00
1,400.00
290.00
150.00
100.00
10.00
1.00
1.50
2.50
2,800.00
600.00
1,400.00
435.00
375.00
M3
M2
KG
23.00
62.00
760.00
100.00
10.00
1.00
2,300.00
620.00
760.00
M3
M2
KG
ML
ML
M2
310.00
110.00
8,600.00
470.00
90.00
1,600.00
100.00
10.00
1.00
2.00
4.00
15.00
31,000.00
1,100.00
8,600.00
940.00
360.00
24,000.00
M3
M2
KG
ML
ML
28.00
21.00
600.00
24.00
4.00
100.00
10.00
1.00
2.00
4.00
2,800.00
210.00
600.00
48.00
16.00
SUB-TOTAL 3.0
4.0
400.00
500.00
400.00
600.00
1,000.00
1,000.00
250.00
500.00
4,650.00
SUB-TOTAL 2.0
3.0
PARCIAL($)
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
PRESUPUESTO
CLIENTE
OBRA
REFERENCIAL
4.6
4.7
O B R AS
CIVILES
4.5
HOJA 3
SARDINELES EN LOSAS
a) Concreto f'c=210 kg/cm2
b) Encofrado
c) Acero de refuerzo
CANALETAS DE DRENAJE PLUVIAL
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
d) Guardacantos
CISTERNA Y CUARTO DE BOMBAS
a) Concreto f'c=210 kg/cm2
b) Encofrados
c) Acero de refuerzo
d) Guardacantos canaletas
e) Waterstop
UBICACION : YANACOCHA
VIGENCIA : MAYO 2001
UN.
METRADO
PR.UNIT.($)
M3
M2
KG
11.00
40.00
260.00
100.00
10.00
1.00
1,100.00
400.00
260.00
M3
M2
KG
Kg
22.00
124.00
680.00
1,100.00
100.00
10.00
1.00
1.50
2,200.00
1,240.00
680.00
1,650.00
M3
M2
KG
KG
ML
108.00
370.00
5,470.00
40.00
40.00
100.00
10.00
1.00
1.50
8.00
10,800.00
3,700.00
5,470.00
60.00
320.00
106,844.00
KG
43,000.00
1.40
60,200.00
M2
1,325.00
10.50
13,912.50
M2
225.00
15.00
3,375.00
M2
950.00
10.50
9,975.00
ML
UN
UN
465.00
3.00
3.00
7.50
2,800.00
200.00
3,487.50
8,400.00
600.00
M2
300.00
105.00
31,500.00
131,450.00
KG
7,000.00
1.40
9,800.00
M2
450.00
10.50
4,725.00
ML
150.00
7.50
1,125.00
15,650.00
M2
M2
M2
250.00
1,705.00
1,450.00
15.00
5.00
14.00
3,750.00
8,525.00
20,300.00
32,575.00
SUB-TOTAL 4.0
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
SUB-TOTAL 5.0
6.0
6.1
6.2
6.3
SUB-TOTAL 6.0
7.0
PISOS
7.1
7.4
7.3
SUB-TOTAL 7.0
PARCIAL($)
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
PRESUPUESTO
CLIENTE
OBRA
REFERENCIAL
HOJA 4
O B R AS
CIVILES
8.0
APARATOS SANITARIOS
8.1
8.2
8.3
8.4
8.5
UBICACION : YANACOCHA
VIGENCIA : MAYO 2001
UN.
METRADO
PR.UNIT.($)
150.00
100.00
160.00
60.00
60.00
600.00
400.00
960.00
60.00
60.00
2,080.00
COSTO DIRECTO
US$
302,145.00
US$
45,321.75
US$
347,466.75
UN
UN
UN
UN
UN
4.00
4.00
6.00
1.00
1.00
PARCIAL($)
SUB-TOTAL 8.0
05/15/2015
S I G R A L S. A.
Departamento de Ingeniera
HOJA 5
05/15/2015
S I G R A L S. A.
Departamento de Ingeniera
HOJA 6
05/15/2015
S I G R A L S. A.
Departamento de Ingeniera
HOJA 7
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
HOJA 8
1.0
1.1
1.2
2.0
2.1
2.1.1
2.1.2
2.1.3
2.2
2.2.1
2.2.2
2.2.3
2.2.4
3.0
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
OBRAS PRELIMINARES
Trazo y replanteo inicial
Trazo y replanteo final
SUB-TOTAL 1.0
SISTEMA DE AGUA FRIA
RED EXTERIOR
Tubera roscada PVC Clase-10 enterrada
1.1/4"
1"
3/4"
UN.
ML.
ML
ML.
ML.
ML.
METRADO
PR.UNIT.($)
PARCIAL($)
1250.00
1250.00
0.15
0.15
187.50
187.50
375.00
27.00
6.00
46.00
5.20
4.30
3.26
140.40
25.80
149.96
1.00
1.00
2.00
1.00
43.17
38.50
30.00
70.00
43.17
38.50
60.00
70.00
16.00
16.43
262.88
1.00
1.00
30.50
22.00
30.50
22.00
3.00
1.00
3.00
50.00
9.00
50.00
902.21
ML.
ML.
PTO
UND
UND
GLB
6.00
22.00
6.00
1.00
2.00
1.00
5.20
4.80
15.00
210.00
3.00
80.00
31.20
105.60
90.00
210.00
6.00
80.00
522.80
ML.
ML.
ML.
38.00
14.00
5.00
60.90
71.70
18.05
2314.20
1003.80
90.25
ML.
12.00
58.45
701.40
4.0
4.1
4.2
UBICACION : CAJAMARCA
VIGENCIA : MAYO 2001
8"
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
HOJA 9
UBICACION : CAJAMARCA
VIGENCIA : MAYO 2001
DESCRIPCION
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
6"
4"
3"
2.1/2"
2"
1.1/2"
1.1/4"
1"
Rociador automtico tipo Upright. Incluye instalacin.
Valvula compuerta de bronce tipo angular
1.1/2"
2.1/2"
Gabinetes contra incendio incluye manguera de nylon
sintetico, L=30.00mt ,portamangueras y extinguidor PQS de
20 lbs.
Vlvula de Seccionamiento 6", incluye accesorios
Detector de Flujo
Drenaje de tubera agua contra incendio
Fire Valv check 6"
Conexin Simesa 6"
Soportes o colgadores
Prueba Hidrulica y eliminacin de material excedente
SUB-TOTAL 4.0
5.0
5.1
5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.2
5.2.1
5.2.2
5.2.3
5.2.4
UN.
METRADO
PR.UNIT.($)
PARCIAL($)
ML.
ML.
ML.
ML.
ML.
ML.
ML.
ML.
UND.
71.00
18.00
18.00
6.00
20.00
168.00
84.00
168.00
168.00
44.20
29.50
20.40
15.10
13.15
11.15
9.45
8.23
13.50
3138.20
531.00
367.20
90.60
263.00
1873.20
793.80
1382.64
2268.00
UND.
UND.
1.00
1.00
63.30
97.10
63.30
97.10
GLB.
UND.
UND.
GLB.
GLB.
GLB.
UND.
UND.
1.00
2.00
2.00
3.00
2.00
1.00
171.00
1.00
400.00
600.00
200.00
200.00
450.00
485.00
5.00
200.00
400.00
1200.00
400.00
600.00
900.00
485.00
855.00
200.00
20,017.69
ML.
ML.
86.00
8.00
12.90
8.50
1109.40
68.00
UND.
UND.
ML.
ML.
6.00
2.00
160.00
25.00
35.00
45.00
4.50
6.00
210.00
90.00
720.00
150.00
Prueba Hidraulica
excedente
GLB.
1.00
80.00
80.00
ML.
ML.
ML.
UND.
PTO.
39.00
70.00
60.00
16.00
16.00
18.50
10.20
8.50
18.00
18.00
721.50
714.00
510.00
288.00
288.00
UND.
UND.
2.00
2.00
13.50
12.70
27.00
25.40
limpieza y eliminacin
del material
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
HOJA 10
UBICACION : CAJAMARCA
VIGENCIA : MAYO 2001
DESCRIPCION
UN.
5.2.5
5.2.6
Prueba Hidrulica
excedente
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
6.0
METRADO
PR.UNIT.($)
PARCIAL($)
UND.
UND.
UND.
UND.
2.00
1.00
3.00
6.00
13.50
13.50
13.50
12.70
27.00
13.50
40.50
76.20
GLB.
1.00
50.00
50.00
ML.
19.00
18.50
351.50
UND.
ML.
UND.
5.00
64.00
16.00
45.00
11.00
3.00
225.00
704.00
48.00
GLB.
1.00
30.00
30.00
6,567.00
PTO.
UND.
3.00
3.00
16.00
8.70
48.00
26.10
74.10
1.00
44150.00
44150.00
GLB.
1.00
2000.00
2000.00
GLB.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
UND.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1000.00
950.00
755.00
750.00
250.00
220.00
130.00
1900.00
1150.00
1200.00
180.00
150.00
200.00
1000.00
950.00
755.00
750.00
250.00
220.00
130.00
1900.00
1150.00
1200.00
180.00
150.00
200.00
Prueba Hidrulica
excedente
SUB-TOTAL 5.0
limpieza
limpieza
eliminacin
eliminacin
de
de
6.1
6.1
RED DE VENTILACION
Slida para ventilacin con tubera PVC clase liviana
Rejilla de ventilacin PVC 2"
SUB-TOTAL 6.0
7.0
CUARTO DE BOMBAS
material
material
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.14
Pot
Sistema
Hidroneumtico
Incluye
02
electrobombas
Q=19.82GPM A.D.T.=40PSI Pot Aprox=2HP c/u.Tanque
Hidroneumtico V=120Gal. Incluye tablero de control y
accesorios.
Vlvula FoFdo tipoOS&Y 10"
Vlvula FoFdo tipoOS&Y 8"
Vlvula FoFdO Check 8" Antigolpe de Ariete
Unin Dresser 10"
Unin Dresser 8"
Unin Dresser 2"
Vlvula de Alarma 8"
Detector de Flujo
Vlvula de Alivio 6"
Vlvula FoFdo tipoOS&Y 2"
Vlvula FoFdo tipoOS&Y 1.1/2"
Vlvula check 1.1/2"
S I G R A L S. A.
Departamento de Ingeniera
05/15/2015
HOJA 11
UBICACION : CAJAMARCA
VIGENCIA : MAYO 2001
DESCRIPCION
7.15
7.16
7.17
7.18
7.19
UN.
METRADO
PR.UNIT.($)
PARCIAL($)
UND.
ML.
2.00
6.00
450.00
4.50
900.00
27.00
GLB.
ML.
UND.
1.00
10.00
1.00
1200.00
120.00
80.00
US$
US$
1200.00
1200.00
80.00
58,392.00
86,850.80
13,027.62
US$
99,878.42
Pot
SIGRAL.S.A.
Departamento de Ingeniera
05/15/2015
HOJA12
1.2
UBICACION : CAJAMARCA
VIGENCIA : MAYO 2001
UN.
METRADO
PR.UNIT ($)
PARCIAL ($)
Pto.
112.00
51.80
5,801.60
Pto.
2.00
28.30
56.60
1.3
Pto.
10.00
63.60
636.00
1.4
Pto.
47.00
48.90
2,298.30
1.5
Pto.
4.00
43.90
175.60
1.6
Eq.
1.00
810.00
810.00
1.7
Eq.
1.00
520
520.00
1.8
Pto.
1.00
48.00
48.00
1.9
Pto.
3.00
66.70
200.10
1.10
Pto.
3.00
39.20
117.60
1.11
Pto.
1.00
41.30
41.30
1.12
Pto.
3.00
46.00
138.00
1.13
Mts.
25.00
15.20
380.00
Alimentadores a tableros:
a) 3x35mm2 - 35mm. dimetro, Conduit
b) 3x10 mm2 -35mm. dimetro, PVC-P
c) 3x6+1x4Tmm2-25mm. diametro Conduit.
d) 3x4+1x2.5Tmm2-20mm diametro Conduit
e) 2x4+1x2.5Tmm2-20mm diametroConduit
Mts.
Mts.
Mts.
Mts.
Mts.
50.00
57.00
8.00
2.00
3.00
18.80
8.70
5.80
4.20
4.10
940.00
495.90
46.40
8.40
12.30
Mts.
Mts.
91.00
52.00
9.20
8.50
837.20
442.00
Cjto.
24.00
63.50
1,524.00
1.14
1.15
1.16
05/15/2015
SIGRAL.S.A.
Departamento de Ingeniera
HOJA13
1.17
Glb.
7.00
115.00
805.00
1.18
Mts.
265.00
9.60
2,544.00
1.19
Cjto.
2.00
110.50
221.00
1.20
Cjto
2.00
1560.00
3,120.00
1.21
Pto.
19.00
44.60
847.40
1.22
Pto.
26.00
42.00
1,092.00
1.23
Cjto.
1.00
26.90
26.90
1.24
Cjto.
2.00
45.00
90.00
1.25
Pto.
1.00
42.90
42.90
1.26
Pto.
1.00
27.50
27.50
1.27
Pto.
1.00
31.40
31.40
1.28
Mts.
Mts.
Mts.
2.00
3.00
12.00
21.00
14.50
6.20
42.00
43.50
74.40
1.29
Cjto.
1.00
41.00
41.00
1.30
Cjto.
1.00
58.60
58.60
1.31
Tableros:
a) Tablero general de Almacen y servicios TGA
b) Tablero para Oficinas TA
c) Tablero de Patio-Almacen TP
d) Tablero de distribucion Cuarto de Bombas TB
e) Tablero de Bombas de Agua T-BA
f) Tablero de Bomba de Pozo Sumidero T-BPS
g) Tablero de Control de Alumbrado
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3400.00
600.00
430.00
420.00
450.00
370.00
60.00
3,400.00
600.00
430.00
420.00
450.00
370.00
60.00
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
Eq.
12.00
4.00
5.00
5.00
9.00
3.00
1.00
2.00
63.00
177.00
119.00
233.00
29.00
143.00
33.00
147.00
756.00
708.00
595.00
1,165.00
261.00
429.00
33.00
294.00
1.32
05/15/2015
SIGRAL.S.A.
Departamento de Ingeniera
HOJA14
Eq.
Eq.
Eq.
Eq.
Eq.
2.00
18.00
5.00
4.00
39.00
67.00
53.00
74.00
15.00
142.00
134.00
954.00
370.00
60.00
5,538.00
Eq.
6.00
217.00
1,302.00
Eq.
2.00
217.00
434.00
Eq.
4.00
219.00
876.00
Eq.
4.00
219.00
876.00
Eq.
8.00
160.00
1,280.00
1.33
Cjto.
1.00
2800.00
2,800.00
1.34
Cjto.
4.00
380.00
1,520.00
US$
US$
50,751.90
50,751.90
7,612.79
58,364.69
US$
NOTA:
El presupuesto incluye el suministro e instalacin de tuberias PVC-P empotradas, tuberas Conduit a la vista,
soportera, cajas Condulet, conductores THW-600V-75C cableados, accesorios para interruptores, tomacorrientes
de 15 Amp.-220V, salidas de telfonos, salidas de fuerza, tableros 220V con interruptores termomagnticos,
artefactos de alumbrado, colgadores y soportes, sistema de puesta a tierra, soportes de tableros adosados.