The first argument concerns demand patterns in re-gasification operation. Since the LNG
reception terminal provides natural gas as a public utility, the terminal shall be operated for continuous
year-round supply. The re-gasification rate is highly dependent on gas demand patterns. Significant
load gap between daytime and night is observed in seasonal and daily demand patterns.
A terminal comprises LNG storage tank(s), LNG pumping system, re-gasification facilities,
boil-off gas (BOG) handling system, ship-unloading facilities and other support systems. The terminal
shall be operated to accommodate requirements of fluctuation of gas demand, and the total capacity of
re-gasification facilities shall be large enough to send gas at the peak rate. A reduction of the send-out
rate during night requires stable turndown operation. An annual load factor as a ratio of average/peak
actually varies over a wide range, depending on users operating purposes, namely base-load or peak
shaving.
Actual requirements for gas send-out patterns at terminal exit depend on gas inventories in
downstream pipeline or gasholder. Line packing brings the benefit of steady load in re-gasification.
Taking advantage of line packing in gas pipeline, a gap between maximum and minimum gas send-out
rates can be reduced by utilizing a pressure swing.
3.2 Availability and Reliability
The overall function of a terminal is to receive, store and re-gasify LNG to be distributed to
power plants and town gas gate stations via a pipeline, and is performed by various operating
components of the terminal. Since unscheduled shutdown results in loss of public energy source, in
principle, all facilities shall be operated to maintain 100 % availability. Inspection and repairing of
equipment components of the facilities shall be completed while natural gas send-out is being
continued.
LNG pressurizing and re-gasifying, which are performed by means of LNG pumps, vaporizers
and related support facilities, are critical functions for the terminal. Stand-by equipment, which should
be ready for quick starting, should be kept available anytime, considering unexpected failure of any
running item of equipment. If downstream gas inventory is not sufficient, a trip of the running equipment
could cause rapid depressurizing in gas send-out stream, resulting in gas supply shortage. In such a
case, re-gasifying by running the standby equipment should be applied to fulfill the availability
requirements.
3.3 Maintenance and Sparing
To prevent any unexpected shutdown, the terminal should employ preventative and predictive
maintenance. Routine on-stream monitoring, inspection and maintenance, which do not affect
operation, should be undertaken. While equipment shutdown maintenance and inspection for major
deterioration diagnoses are being carried out, operation shall be continued, using spare items of
equipment. Legally required inspection and maintenance also involve equipment shutdown. Due to the
100% availability requirements of the terminal, sufficient spare facilities are required to ensure that the
terminal operation can continue even during legally required inspection and maintenance work.
Failures of running items should be taken into consideration in scheduling shutdown
maintenance. Stand-by items should be kept available while scheduled maintenance is underway.
Monthly demand pattern is usually taken into consideration in planning an adequate maintenance
schedule. Shutdown maintenance and inspection should be undertaken during off-peak season.
3.4 Operating Variables in LNG Vaporizing and Gas Handling
Most of operating conditions of main streams and equipment are not in a steady state, but are
variable due to periodical ship unloading and fluctuations in gas demand. To achieve safe, effective
and reliable operation, the maximum and minimum conditions in flowing rate, pressure and
temperature are to be clarified, based on the following two operation modes. All equipment
components shall be operated to control operating conditions within their respective acceptable
ranges.
Ship unloading and minimum gas send-out (Maximum boil-off & minimum re-gasification)
No ship unloading and maximum gas send-out (Minimum boil-off & maximum re-gasification)
The re-gasifying rate control is achieved by adjusting the flow rate at the inlet of vaporizers in
order to control send-out pressure within a normal range. When the flow rate decreases to the
minimum set point, one of running vaporizers is stopped. Conversely, when the flow demand increases
to the maximum set point of vaporizer, a stand-by vaporizer is switched on. All pumping facilities of
re-gasification system are operated by the similar operating methodology. LNG pumps and seawater
pumps for vaporizers are allowed to operate within their respective suitable operating ranges to
maintain high efficiency. Auto switching on/off equipment, combined with the flow rate adjustment,
attains effective operation to meet hourly movements in demand.
Boil-off gas (BOG) rate, which varies depending upon weather conditions and operating modes,
is separately handled. BOG compression load is adjusted to control the pressure in storage tanks
within a normal range. The compressed BOG is sent directly to gas stream or re-condensed into LNG
stream before vaporization.
3.5 Control System
Since Distributed Control System (DCS) has been applied to the LNG reception terminal,
automatic operating system has remarkably developed. The DCS, which is supported by control
console with display and engineering workstation, forms the core for the monitoring and control.
Through the interface with operators, DCS provides useful information and guidance to support the
terminal operation. In addition, several management systems can be linked with DCS system to assist
operational work on tank inventory management, maintenance scheduling, guide for stepwise
operation and so on.
Current sophisticated control, monitoring and support systems allows of full automatic
operation, which includes switching on/off in the re-gasification facilities.
3.6 Power Consumption
To discuss energy saving in LNG business, energy consumptions throughout LNG
transportation process are assessed at first. The conventional system of LNG re-gasification is to
vaporize pumped-up LNG, using large quantities of seawater or combustion of fuel gas as heat
source. To minimize operating expenditures, seawater, which is a natural heating medium, is usually
used to vaporize LNG. Electric power is principal energy source and is consumed, mainly in pumping
facilities. Accordingly, consumption in re-gasification is very low in LNG chain.
To achieve long distance transportation of LNG from production site to end users, liquefaction
processing consumes a large quantity of energy, and the significant part of this energy input is
transferred to the reception terminal as cold energy. For further energy saving in the LNG
transportation stream, it is essential to recover as much cold energy as possible, as generally
understood. Potential quantity of cold energy recovery is quite large, suggesting that effective cold
utilization brings more energy saving in the whole of the LNG chain. This theme is discussed in
Section 4.
Regarding power consumption for terminal operation, re-gasification and BOG handling are
major consumers in the terminals. In the long history of the LNG industry, development in operating
techniques supported by automatic control system has substantially reduced power consumption for
re-gasification.
outside should be studied. Users of cold energy should be located, in principle, close to terminals. In
addition, since cold utilization requires additional investments to supply cold energy, high load factor is
necessary for feasible integration.
Possible approaches are:
Integration with power plant or refinery/petrochemical complex, which requires significant
refrigeration capacity
Integration with user, which requires significant quantities of nitrogen and/or oxygen
With regard to the above integrations, one typical approach is integration with ethylene plant.
The ethylene plant requires significant amount of refrigeration in a wide temperature range, where
LNG heating curve is adequately matched with requirements for refrigeration in the ethylene plant.
Although such integration requires consideration of several operational interfaces with the partner, it is
essential to tackle the challenge of how to realize effective cold utilization.
5. Observations
Through the overlooking of the development of LNG handling technologies, it has been found
high-level operating technique has been established and long-term operating experience has proven
the achievement of safe, reliable and cost-effective operation in the reception terminals. A further
expansion of downstream distribution systems is foreseeable, and advanced design and operating
technologies will be developed, with requirements on interface with downstream network incorporated.
Further technological development in equipment components of terminals will continue to be
promoted. However, since energy consumption for re-gasification processing is at a low level,
substantial further reduction of energy consumption seems to be difficult.
Another direction of power saving will be to increase the cold utilization. Expansion of the
existing cold utilization businesses or integration with the outside to provide high recovery rate will
contribute to saving in power consumption in the LNG chain. To realize the integration of terminals
with the outside plants on a large scale, adequate conditions in locality, interface, load factor, matching
in process variables and so on are essential. Cold utilization projects should be promoted based on
circumspect planning.
References
1. Fereidun Fesharaki, Asia-Pacific Energy Outlook LNG-13, 2001
2. M. Oka, T. Matsutani, M. Torihara, T. Sano, National Gas Transmission Pipeline LNG 10, 1992
3. M. Sugiyama, M. Ishida, T. Sasaki, K. Ichimura, The Operation Technology of LNG Terminals of
Tokyo Electric Power Company LNG 12, 1998
4. Y. Hirayama, Small Scale LNG Project Gastech 1994
5. J. Jensen, The Emerging Competition between Pipelines and LNG Gastech 2000
6. Hyun Cho, Sbhash N. Shah, Maximized Synergy Effects by Integration of an LNG Terminal and an
Adjacent Power Plant LNG 13, 2001