You are on page 1of 6

FIVE METHODS OF COMPENSATION

1. % OF CONSTRUCTION COST.
2. MULTIPLE OF DIRECT PERSONNAL EXPENSES
3. PROFESSIONAL FEE + EXPENSES
4. LUMP SUM OR FIXED FEE
5. PER DIEM + REIMBURSIBLE EXPENSE

PROJECT CLASSIFICATION
GROUP 1 = Simplest, min. fin, structural, etc.

(50 million & less = 6%)

Armories, Bakeries, Freight, Parking, Market, Warehouse


GROUP 2 = Moderate complexity, (50 million

& less = 7 %)

Banks, City Halls, School, Mall, Motel, Apartment, Office Bldg


GROUP 3 = Exceptional char., large amount Structural, etc. (50 million

& less = 8%)

Atomic Fac., Airport, Gym, Lab., Hotels. Hospital, Breweries,

GROUP 4 = Residence (Single Det & Duplex) (10 % of Proj. Const. Cost)

GROUP 5 = Monumental Bldg. (12

% of Proj Const. Cost)

Expo, Mausoleum, Museums


GROUP 6 = Repetitive Const. of Bldgs

1st Structure = Min. Basic fee


2nd Structure =

80 % of Basic F

3rd Structure = 60 % of Basic F


Succeding = 40 % of Basic F

GROUP 7 = Housing Projects (Several Res. Units on a Single Site)

1st Unit = 10 % of Proj. Const.Cost as BASIC FEE


2-10 Units = 1 unit + 60% of 1st Unit (Basic F)
11 & above = 10 units + 30% of 1st Unit (Basic F)

GROUP 8

= Interior & Landscaping Design (Extensive detailing)

Min Basic fee = 15% of Project Const Cost

GROUP 9 = for Alterations & Additions of Existing Bldgs

50% of the total of 150% of the Basic Fee


GROUP 10 = Consultation and Arbitrations

Architects Services & Compensations


UAP DOC 201 PRE DESIGN SERVICES
-

Compensated on the basis of MULIPLE OF DIRECT PERSONNEL EXPENSE


2 - 2.5

Compensated for every technical hour

Progress Payment

UAP DOC 202

DESIGN SERVICES

Upon Signing of Agreement = 5%


Upon Completion of Schemes (not >15 days) = 15%
Upon completion of Design Devt. = 35%
Upon Completion of Contract Documents = 85%
After Awarding of contracts = 85%
Balance = upon completion of Const Work

Work Suspended or Abandoned

The remaining 15% of his work to be paid by owner is:

10% - Arch. Liability under the civil code

5% -

construction Services

UAP DOC 203 SPECIALIZED ALLIED SERVICES


Payment Schedule:
1. Upon Submission of preliminary design =
2. Upon Submission of Final design =
3. Upon completion of he project =

30 % of the fee

50%

20%

INTERIOR DESIGN SERVICES


Architects fee = 15% but it can be range 12% -20%
Consultants Fee = 5

ACOUSTICS, ECE SERVICES and LANDSCAPEDESIGN SERVICES


Architects fee = 10% - 15% Consultants Fee = 5 %
PHYSICAL PLANNING
TYPE 1 = 50 HEC or less = 5,000 / hec

TYPE 2 = 100 HEC or less = 3.000 / hec


TYPE 3 = 100 HEC or less = 2,000 / hec.
*the above stipulated rate is for moderately flat land
If the land is rugged w/ steep terrain the fee shall inc. 30 %
Environmental Planner Concerned w/ the management & use of lands/conservation
Fees = Physical Planning Prof. Fess + expenses

UAP DOC 204 CONSTRUCTION SERVICES


Quality Control of Work, Evaluation & Const. Work, Keeping of Records, Reports &
Contracts Doc.,

Architects as FULL

TIME SUPERVISOR = 1% - 1 % of Const Cost

Architects as CONSTRUCTION

MANAGER = 1 % - 3 % of Const Cost

-coordination & supervision, cost & time control, quality control of work.

UAP DOC 205 POST - CONSTRUCTION SERVICES


Bldg & Equipment Maintenance, Bldg & Ground Admin., Post Construction Evaluation
Compensation = Salary Basis (fixed monthly/daily)
or Management fee (

4 % - 6 % gross rentals)

UAP DOC 206 COMPREHENSIVE ARCHITECTURAL SERVICES


Scope: Pre- Design to Post Construction Services
Project Manager = (2

% - 5 % of Estimated Project Cost)

-Coordinates the whole range of Comprehensive arch.

UAP DOC 207 DESIGN- BUILD SERVICES


Architects is liable of both design & Construction
TYPES:
1. Design- Build Services by Administration = 7%

+ Architects fee on

Regular D

Services
2. Design Build Services on a Guaranteed Maximum Cost = 10% + Architects
fee on RDS
3. Design Build Service on Lump Sum Contract

UAP DOC 208 SELECTION OF ARCHITECTS

UAP DOC 209 COMPETITION CODE

UAP DOC 301 GENERAL CONDITIONS

UAP DOC 307 PRACTICAL SPECIFICATIONS WRITING

UAP DOC 200 CODE OF ETHICAL CONDUCT

PP UAP DOC. 211 (RA 545, PD 223, LOI 1000) Prof. Regulatory Laws
Governing the Practice of Architecture
RA 545 an act to regulate the practice of architecture in the Philippines.

PD 223 Creating the professional regulation commission and prescribing its


powers & functions.
LOI 1000 Letter of Instruction
PD 1096 National Building Code.
BP 344 An act to enhance The mobility of disabled persons.
PD 1185 Fire Code of the Philippines
RA 386 Civil Codes of the Philippines
(Contracts and Obligations)
PD 957 Subdivision Law

BP 220 Zoning Regulations


PD 856 Sanitation Code of the Philippines

You might also like