You are on page 1of 16

VSLP I X I35 MW THERMAL P

Shift Duty Repo


Date:10/05/2014
Shift: A-Shift
SHIFT INCHARGE VSLP:
SHIFT STAFF

Asst. Shift Incharge- Sudhir/Arun


DCS Desk engineer VSLP:Mr.Deepak/Mr. Sekhar
Mechanical maintenance team: Mr.Vijayant
Electrcial Shift engineer & team VSLP: Mr.Vikash kumar
C&I shift engineer & team: Mr.Chellu singh

Scheduled Export: 112 MW, Actual Exp


MAINTENANCE REPORT
.

PERMIT
NO./Dept

WORK AREA

332
333
334
335
336
337
338
339
340
341
RUNNING
EQUIPMENTS (During
shift start)

BOILER
TURBINE

LOAD-126MW (13.00 Hrs ),Coal Flow -(111-113 tph),MS pr: 12.56Mpa,MS temp: 535 deg, RH st pr:2.3
Flow-395TPH Feed Flow-410TPH.

1.SA fan B and PA fan B oil top up done.


2.Following Soot blowing trial taken from PLC HL1,HL2,HL3,HR1,
mode which is to be rectified).

3. CEP-B pump bearing inspection work U/P.


4.HP heater to dearator vent leakage arresting work completed. 5.Lim
ash silo wet ash conitioner conditioning motor cooling fan reuired.
1. Fly ash silo level - 11.7Mtr & Bed ash level 6.2 Meter.
2. Fly ash Dumper -9 Nos. & Bed Ash- 00 No.

Reason for generation loss: Due to restriction in cyclone inlet temperat

VSLP I X I35 MW THERMAL POWER PLANT

Shift Duty Report

Asst. Shift Incharge- Sudhir/Arun


VSLP:Mr.Deepak/Mr. Sekhar
ance team: Mr.Vijayant
neer & team VSLP: Mr.Vikash kumar
team: Mr.Chellu singh
Scheduled Export: 112 MW, Actual Export: 112 MW
MAINTENANCE REPORT
WORK DESCRIPTION
Lp drain pump-B oil top up work
FF-31 flow valve leakage arresting work
Soot blower RHS mechanical PM work
CEP-B motor removal work for pump bearing inspection work
Fabric filter 5no bypass valve not operating from PLC
CEP-B motor RTD removing work C & I side
Fly ash silo wet ash unloader gearbox oil top up to be done
HP heater-2 to Deaator vent line leakage arresing work(online)
SH-1 attemperation spray MOV-2 gland leakage arresting work(online)
soot blowing to be done
PA-A & B, SA-A & B, HF-A, ID A & B, Coal feeders A,B,C,D,E,F

BFP B, BFP A Lube oil pump, Vacuum pump A, CEP A, CW Pump A & B MOT
Vappour Extraction Fan B
13 tph),MS pr: 12.56Mpa,MS temp: 535 deg, RH st pr:2.33 Mpa, RH st temp:532 deg,Vacuum:- -86.1Kpa,

wing Soot blowing trial taken from PLC HL1,HL2,HL3,HR1,HR2 & HR4 operated normally(In night shift it was not

work U/P.
dearator vent leakage arresting work completed. 5.Lime stone vibrating feeder running feedback showing in P
or cooling fan reuired.
level 6.2 Meter.
ash Dumper -9 Nos. & Bed Ash- 00 No.

e to restriction in cyclone inlet temperature and also SA -B IGV not operating f

REMARKS
completed
U/P
U/P
U/P
U/P
completed
U/P
completed
U/P
Completed
SA-B IGV not operated from dcs.
ID IGV 70 %

deg,Vacuum:- -86.1Kpa,

MS

normally(In night shift it was not operated in sequence

r running feedback showing in PLC to be rectify. 6.Fly

-B IGV not operating from DCS.

.SA LHS bottom bank total pluged tubes 81 and require to be pluged 7 nos. SA R

to be pluged 7 nos. SA RHS bottom bank total pluged tubes 86 and required to be pluged 8 nos.

ed 8 nos.

7.SA LHS Middle bank total pluged tubes 8 nos.No need for any pluging. SA RHS

for any pluging. SA RHS middle bank total pluged tubes 8 ans 5 nos.to be plugged.

8. PA LHS bottom bank total pluged tubes 16 and require to be pluged 18 nos.

ire to be pluged 18 nos. PA RHS bottom bank total pluged tubes 14 nos. and 24 nos.to be plugged.

be plugged.

9. SA Top Bank LHS 8 nos. tube plugged and 1 no. to be pluged. SA top RHS 0

be pluged. SA top RHS 0 nos.tube plugged and 6 no.to be plugged.

10 PA Top Bank LHS 16 nos. tube plugged and 1 no. to be pluged. PA to

1 no. to be pluged. PA top RHS 24nos.tube plugged and 17 no.to be plugged.