Professional Documents
Culture Documents
Rig: Sakson
After Action Review (AAR)
24th March 15
ZHD A-102
Rig
Sakson
Well Type
Well Trajectory
Target
CH7 CH12
Single completion
Plan Well TD
4200m
Actual TD
3991m
Spud Date
Release Date
7 TOL @ 2944 m
9 5/8 casing @ 3060 m
EOT @ 3656 m
4 TOL @ 3718 m
TOF @ 3733m
Clean out to @ 3736m
PBTD @ 3932 m
Progress chart
Ave ROP for 26 Sec: 14 mph
20 casing shoe @ 500m
PT versus NPT
Time (Days)
PT vs NPT
PT
104
NPT
96
Total
200
Dragon; 20%
NPT distribution
Comp.
Dragon
Time (D)
40
Description
SLB-Mud; 2%
Well control
fishing pooh
w/ completion
- WOW
DEW
28
7 liner drop
Sakson
22
Rig repair
SLBMud
Conditioning
the mud
SLB-DM
Gyro failure
PT; 52%
DEW; 14%
SLB-DM; 1%
Sakson; 11%
PT
Sakson
SLB-DM
DEW
SLB-Mud
Dragon
Lessons Learnt
Problem
Dropping 7 liner
while RIH
Reason
Action Taken
Stuck while
Drilling 6 hole
Recommendations
Lessons Learnt
Problem
Reason
Action Taken
Recommendations
KCL/Glycol is not
the suitable mud
system to be
used in the
reservoir section
Pooh with
completion string
Lowlights:
The NPT is high in this well
The liner dropped while RIH due to human error
Either the 9 5/8 Quantum packer or 4 liner has been leaking while running
the upper completion
End of Presentation