You are on page 1of 12

SPECTRUM

TECHNICAL SPECIFICATION

THERMIC FLUID HEATER


MANUFACTURING PLANT NO.2 AT DEWAS

Client: M/s NAVIN FLUORINE INTERNATIONAL LTD

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 1 OF 11

REVISION HISTORY
REVISION
00

File Location

EFFECTIVE DATE
02-01-2014

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

REASON FOR REVISION


FIRST ISSUE

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 2 OF 11

TABLE OF CONTENTS
1.0

APPROVAL SIGNATURES

2.0

OVERVIEW

3.0

INSPECTION, TESTING AND DISPATCH

4.0

DRAWINGS & DOCUMENTS

5.0

PACKING

6.0

SPARES

7.0

DATASHEET

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 3 OF 11

1.0 APPROVAL SIGNATURES


This document is prepared by the SPCPL team for the project of NAVIN FLOURINE
INTERNATIONAL LIMITED, DEWAS under the authority of their Project Manager. Hence
this document before being effective shall be approved by the QA team of NAVIN
FLOURINE INTERNATIONAL LIMITED, DEWAS, and authorized by the appropriate
Project Authority.
SPCPL
Name

Designation

Prepared By

Rajesh Yerawar

Sr. Executive Mechanical

Checked By

Akhilesh Verma

Manager - Mechanical

Approved By

Sanjay Katkade

GM-Engineering

Name

Designation

Signature

Date

Signature

Date

CLIENT

Approved By

Authorized By

2.0 OVERVIEW

2.1 Project introduction

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 4 OF 11

Navin Flourine International Limited has envisioned setting up an Manufacturing plant No.2
facility at Dewas along with the necessary utilities
Nearest railway station

DEWAS

Nearest airport

INDORE

Ambient conditions:

Summer ( DB / WB / % RH)

40 C / 24.4 C / 28 %

Monsoon ( DB / WB / % RH)

28 C / 26 C / 82 %

Winter ( DB / WB / % RH)

10 C / 5.6 C / 50 %

2.2 Project standard


The design, manufacturing, testing at factory of Thermic fluid heater shall comply with the
latest applicable standards.
3.0 INSPECTION, TESTING AND DISPATCH
The Thermic fluid heater will be subjected to inspection at manufacturers works in the
presence of purchaser/consultant.
During inspection following routine tests shall be carried out:

Visual inspection for workmanship and verification with respect to specifications.


Mechanical operation of valves etc.
Functional test for control circuits.
Tightness of screwed/bolted connections

The vendor shall supply to purchaser 3 sets of the certificates of Internal routine tests.

4.0 DRAWINGS & DOCUMENTS


Vendor to submit following Drawing & Documents at various stages.
4.1 Drawings (3 Sets)
-

File Location

GA Drawings, Engineering Drawings (For approval, Approved, As built, As installed)

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
21116

PROJECT NO
DOCUMENT NO
-

Electrical Circuit Diagrams

System schematics

M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 5 OF 11

4.2 Manuals and Procedures (3 Sets)


-

Operation and Maintenance manuals

Specialized procedures, if applicable (such as Calibration, Cleaning, etc.)


Specifications and sources of some important materials, if applicable (such as lubricants,
cleaning agents, etc.)
4.3 Lists (3 Sets)
-

Equipment and Instrument list with component descriptions

Electrical component parts list with descriptions

Spare parts list with appropriate identification nos., if any

Change parts list with appropriate identification nos., if any

4.4 Factory Acceptance Test Certificates (3 Sets)


-

Detailed list of modifications after contract &/or in final approved design

Material specifications and test certificates

Instrument Calibration certificates


Functional/ Factory acceptance certificates (such as weld inspection, passivation, pressure/
vacuum holds, etc.)
Warranty certificates

Surface finish test reports

Food grade material certificate

4.5 Site Acceptance Test (3 Sets)


-

Operational Qualification Protocol

5.0 PACKING
Equipment shall be dispatched to site packed in full wooden case (Sea Worthy). It shall be
wrapped in polythene sheets before putting in cases and it shall be ensured that damage to
the equipment does not occur during handling/transportation. Lifting hooks shall be provided
for unloading at site.

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
21116

PROJECT NO
DOCUMENT NO

REVISION NO

00

PAGE NO.

PAGE 6 OF 11

M - 00- D 07

6.0 SPARES
Commissioning Spares The vendors shall include in the quoted price sufficient quantities of commissioning spares
required for erection and commissioning of the equipment. These shall include such items as
Bolts and other miscellaneous parts.
Essential Spares The vendor shall supply spares required for two years trouble free operation & furnish list of
spare considered with offer.

7.0 DATASHEET

DESIGN PARAMETER

REQUIRED SPECIFICATION

PROCESS DATA
Equipment

Thermic fluid heater

Tag No.

TFH-102

Construction

Vertical

Quantity, No(s)

Heat Load, kcal/hr

2,00,000

Thermic Fluid

Vendor to specify

Final Temperature, C

300

Inlet Temperature, C

270 280

Max Design temp. , C

Vendor to specify

Fuel
Coil Pipe diameter

Dual Fired (LDO & Gas)


Vendor to specify

Coil Pipe Specifications

Vendor to specify

Heat transfer area

Vendor to specify

Thermic fluid circulation flow rate


Thermal efficiency

Approx. 12m3/hr (Vendor to confirm)


Vendor to specify

Shell Thickness

Vendor to specify

BLOWER & MOTOR ASSEMBLY

File Location

TYPE

Centrifugal, Direct coupled

MOC

Vendor to specify

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

REVISION NO

00

PAGE NO.

PAGE 7 OF 11

DESIGN PARAMETER

REQUIRED SPECIFICATION

Type of coupling between Motor & Blower

Vendor to specify

Make of Blower

Vendor to specify

H.P. of Motor

Vendor to specify

Make of Motor

Vendor to specify

Electrical Protection Class

IP 55
Vendor to specify

Inlet Damper
Dynamic Balancing

Vendor to specify

STRAINER FOR LDO


Capacity

Vendor to specify

Mesh

Vendor to specify

MOC

Vendor to specify

Make

Vendor to specify

LDO PUMP & MOTOR ASSEMBLY


Type
Capacity

Gear
Vendor to specify

MOC

Vendor to specify

Number of Pumps
Type of coupling between Motor & Pump

1 Working + 1 Stand-by
Vendor to specify

Make of Pump

Vendor to specify

H.P. of Motor

Vendor to specify

Make of Motor

Vendor to specify

Electrical Protection Class

IP-55

Dynamic Balancing

To be provided

ON LINE FO/LDO FILTER


Capacity

Duplex

Mesh

Vendor to specify

MOC

Vendor to specify

Make

Vendor to specify

BURNER ASSEMBLY

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
21116

PROJECT NO
DOCUMENT NO

M - 00- D 07

DESIGN PARAMETER

REVISION NO

00

PAGE NO.

PAGE 8 OF 11

REQUIRED SPECIFICATION

Type of Spray Nozzle

Oil fired (LDO).


Fully automatic pressure atomized,
Complete circulation of Fuel through
burner, inbuilt ON-OFF, solenoid valve with
suitable spray nozzle.
Vendor to Specify

Turn Down Ratio

Min 1:3

Ignition Electrode

To be provided

Photocell

To be provided

Ignition Transformer

To be provided

Spray Diffuser

To be provided

Cooling arrangement for photocell

To be provided

Make of Photocell

Vendor to Specify

Make of ignition electrode

Vendor to Specify

Make of ignition transformer

Vendor to Specify

Type

BUFFER TANK
Capacity

Vendor to specify

Quantity

MOC

Vendor to specify

Design Temperature, C

Vendor to specify

Design Pressure

Vendor to specify

Insulation

Vendor to specify

Insulation Cladding

SS 304

Nut & Bolts

SS 304

EXPANSION TANK

File Location

Capacity

Vendor to specify

Quantity

MOC

Vendor to specify

Design Temperature, C

Vendor to specify

Design Pressure

Vendor to specify

Insulation

Vendor to specify

Insulation Cladding

SS 304

Nut & Bolts

SS 304

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116

REVISION NO

00

PAGE NO.

PAGE 9 OF 11

M - 00- D 07

DESIGN PARAMETER

REQUIRED SPECIFICATION

CIRCULATION PUMP
Make

Vendor to specify

Model

Vendor to specify

Quantity, No(s)

Capacity, m3/hr
Circulation pipe length
(supply & return), m
Static head, m

Vendor to specify

Pump head, MLC

Vendor to specify

VFD

Required

Mechanical Seal

Vendor to specify

Air cooled Gland less pump


Design Temperature

Vendor to Confirm
Vendor to specify

Design Pressure

Vendor to specify

Nut & Bolts

SS 304

200
Later

SKID
Overall Dimension

Vendor to specify

MOC

SS 304

Nut & Bolts

SS 304
Vendor to specify

Dry Weight
ACCESSORIES
Fuel pressure guage mounted on oil filter.
Fuel piping between oil filter ,fuel pump
and Burner
Inlet header with isolation SS needle valve
for inlet pressure sensing. Thermo well for
temp sensing inlet pressure gauge
mounted on control panel
Outlet header with low flow safety isolation
SS needle valves Thermo well for outlet
temp.sensing .Outlet pressure guage
mounted on control panel.
Oil pressure sencing line of copper tubing
and its hardware.
Standard Tool Kit

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

To be provided
To be provided

To be provided

To be provided

To be provided
To be provided

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116
M - 00- D 07

DESIGN PARAMETER

REVISION NO

00

PAGE NO.

PAGE 10 OF 11

REQUIRED SPECIFICATION

CONTROL PANEL
Control Panel Box to house all necessary & Sturdy Mild Steel fabricated with three
electrical & instrumentation to perform said coats of primers & epoxy painting oven
safety interlocks & indications
backed rubber sealing for dustproof
enclosure of instruments as per standard
norms.
Panel Isolation Switch
To be provided
Start/Stop/Fill/Cooling mode selection
To be provided
rotary switch
Fuel circulation inching press button
To be provided
Indicating bulbs with name plates for visual
indication of various control modes
To be provided
mentioned above, mounted on panel front
Wiring completely made from solid
conductor single core for systematic layout To be provided
of wiring
Electric Wire Protection Pipes to protect
various connections going to Motors,
To be provided
Instruments, etc.
Audio Alarm
To be provided
Contractor and Overload protection relays
To be provided
for pump motor and blower motor
Burner prepurge timer
To be provided
Rotary selector switches
Inlet temp indicator cum burner controller
Digital type
Outlet temperature indicator cum safety
controller
Flame failure safety cum burner sequence
controller
Low flow safety controller

To be provided
To be provided

High Pressure Safety Controller

To be provided

Fuse unit for Control Circuit Safety.

To be provided

Ignition Transformer.

To be provided

To be provided
To be provided
To be provided

SAFETY & AUTOMATION

File Location

Cut-off at high Temperature

Required

Inbuilt Safety relief valve

Required

Temperature Indicator

Digital, Required

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

TECHNICAL SPECIFICATION
THERMIC FLUID HEATER
PROJECT NO
DOCUMENT NO

21116

REVISION NO

00

PAGE NO.

PAGE 11 OF 11

M - 00- D 07

DESIGN PARAMETER

REQUIRED SPECIFICATION

Pressure Indicator

Digital, Required

All necessary Instrumentation

Vendor to specify

Control Panel

Required

Alarm in case of system failure

Required

DISTRIBUTION PIPING DETAILS


Pipe Size, NB

Vendor to specify

Type of pipe

Seamless

Rating, (lb)

300

MOC

CS

Total length, m

150

Bends & Fittings

Lot

Insulation

Required

CHIMNEY

EXISTING

Connection Size

Vendor to specify

ADDITIONAL SCOPE
Installation Assistance

To be included in scope

Commissioning Assistance

To be included in scope

Training

To be included in scope

File Location

Z:\PRJ1\API\NFIL 21113\PROCUREMENT\UTILITY\URS\Floated\Thermic
Fluid system\21113 M-00-D07 URS THERMIC FLUID HEATER-R0.docx

Format No:

SOP/ENG/005/02

Rev. 00 01/01/2013

You might also like