Final setting time can be understood as the time elapsed between the moment the water is added to the cement, to the
time when the paste has completely lost its plasticity. After placement, compaction & finishing of concrete, it is desirable
that the concrete loses its plasticity in earliest possible time so that it becomes less vulnerable to damages from external
agencies and the paste hardens and can sustain some minor load.
Both the Initial & Final setting points are arbitrary points and these are determined by Vicat needle penetration resistance.
Water-Cement Ratio
The ratio of the amount of water, exclusive of that absorbed by the aggregates, to the amount of cement in a concrete mix.
Expressed either as gallons of water per sack of cement or pounds of water per pound of cement.
Concrete mix designs have water cement ratio parametres to meet.If the ratio of water to cement is too high in a concrete
mix the compressive strength of that particular batch may be compromised.Converseley too little water will not hydrate or
activate the cement in the mix.The amount of water in the raw materials and absorbtion factors for each raw material are
taken into account when determining the actual water cement ratio of concrete.
43 grade Useful for structural works, precast items etc, Strengthdevelopment is faster than 33 grade.
53 grade Used for multistory buikdings, precast prestressed items,bridges, tall structures. Develops very fast strength
and speeds up construction